EV Charging in Napanee, Ontario

Public EV charging in Napanee, Ontario. 4 charging locations (4 DC fast, 0 Level 2). Score any address with EV Data Map's free 0–100 site profitability analyzer — Canadian incentives via ZEVIP and provincial programs included.

Napanee, Ontario is served by 4 public electric vehicle charging locations operating roughly 22 individual chargers. Of those, 4 (100%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 0 (0%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Napanee is FLO with 1 locations, followed by PETROCAN with 1. Average DC fast power across the city is approximately 175 kW.

EV Data Map scores every potential charging site in Canada from 0 to 100 for profitability, combining ZEV registration density, daytime population, traffic, demographics, nearby competing chargers, and grid context. Enter any Napanee address below for an instant profitability score, demand projection, and recommended charger configuration — including ZEVIP, Ontario provincial, and utility incentive matching.

Napanee charging by the numbers

Locations
4
Chargers
22
DC Fast locations
4
Level 2 locations
0

Charging networks in Napanee

Featured charging locations in Napanee

  1. Petro-Canada — Napanee, ON, K7R 3L2 (PETROCAN · DC Fast · 350 kW)
  2. 1 Richmond Plaza - Tesla Supercharger — Napanee, ON, K7R 3S3 (Tesla · DC Fast · 250 kW)
  3. Napanee — Napanee, ON, K7R 1P8 (FLO · DC Fast · 50 kW)
  4. Essex Powerlines Corp — Napanee, ON, K7R 3L2 (Non-Networked · DC Fast · 50 kW)

Frequently asked questions

How many EV charging stations are in Napanee, Ontario?
There are 4 public EV charging locations in Napanee, Ontario, with a combined 22 individual chargers. 4 locations offer DC fast charging and 0 provide Level 2 charging.
What incentives apply to EV chargers in Ontario?
Most Napanee projects can stack the federal Zero Emission Vehicle Infrastructure Program (ZEVIP) — covering up to 50% of project costs — with provincial Ontario programs and utility incentives. Class 56 accelerated CCA is also available for commercial charging hardware.
What is the largest EV charging network in Napanee?
FLO operates the most public charging locations in Napanee with 1 sites, followed by PETROCAN with 1 sites.

Related coverage