EV Charging in Bedford, Quebec

Public EV charging in Bedford, Quebec. 4 charging locations (0 DC fast, 4 Level 2). Score any address with EV Data Map's free 0–100 site profitability analyzer — Canadian incentives via ZEVIP and provincial programs included.

Bedford, Quebec is served by 4 public electric vehicle charging locations operating roughly 14 individual chargers. Of those, 0 (0%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 4 (100%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Bedford is FLO with 3 locations, followed by Circuit électrique with 1. Average DC fast power across the city is approximately 0 kW.

EV Data Map scores every potential charging site in Canada from 0 to 100 for profitability, combining ZEV registration density, daytime population, traffic, demographics, nearby competing chargers, and grid context. Enter any Bedford address below for an instant profitability score, demand projection, and recommended charger configuration — including ZEVIP, Quebec provincial, and utility incentive matching.

Bedford charging by the numbers

Locations
4
Chargers
14
DC Fast locations
0
Level 2 locations
4

Charging networks in Bedford

Featured charging locations in Bedford

  1. Canton de Bedford - Bureau municipal — Bedford, QC, J0J 1A0 (Circuit électrique · Level 2 · 7.7 kW)
  2. GESTION SCAT - 34 DES BÂTISSEURS, Bedford — Bedford, QC, J0J 1A0 (FLO · Level 2 · 7.2 kW)
  3. GESTION SCAT - Résidents du 35 DES BÂTISSEURS, Bedford — Bedford, QC, J0J 1A0 (FLO · Level 2 · 7.2 kW)
  4. Projet Héritage — Bedford, QC, J0J 1A0 (FLO · Level 2 · 7.2 kW)

Incentives for EV chargers in Quebec

Bedford projects can typically stack three layers of funding: the federal Zero Emission Vehicle Infrastructure Program (ZEVIP) covering up to 50% of project costs, Quebec provincial programs for additional rebates and tax credits, and local utility incentives for grid-connected installations. Class 56 accelerated capital cost allowance (100% first-year writeoff) further improves project economics for commercial installations.

Use the analyzer to see which programs apply to a specific Bedford address along with eligible award amounts.

How profitability scores work in Bedford

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. For Canadian sites, demand draws on Statistics Canada ZEV registrations (Table 20-10-0024) projected forward to 2026 using province-level CAGR, daytime population from StatCan census tracts, and traffic patterns. Competition uses the count and quality of nearby chargers — including DC fast power, network reliability and dwell-fit. Operating economics include provincial electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Bedford specifically, our model factors local commute corridors, the existing footprint of 0 DC fast and 4 Level 2 sites, and the dwell profile of surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Bedford, Quebec?
There are 4 public EV charging locations in Bedford, Quebec, with a combined 14 individual chargers. 0 locations offer DC fast charging and 4 provide Level 2 charging.
What incentives apply to EV chargers in Quebec?
Most Bedford projects can stack the federal Zero Emission Vehicle Infrastructure Program (ZEVIP) — covering up to 50% of project costs — with provincial Quebec programs and utility incentives. Class 56 accelerated CCA is also available for commercial charging hardware.
What is the largest EV charging network in Bedford?
FLO operates the most public charging locations in Bedford with 3 sites, followed by Circuit électrique with 1 sites.