EV Charging in Neuville, Quebec

Public EV charging in Neuville, Quebec. 4 charging locations (1 DC fast, 3 Level 2). Score any address with EV Data Map's free 0–100 site profitability analyzer — Canadian incentives via ZEVIP and provincial programs included.

Neuville, Quebec is served by 4 public electric vehicle charging locations operating roughly 12 individual chargers. Of those, 1 (25%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 3 (75%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Neuville is Circuit électrique with 4 locations. Average DC fast power across the city is approximately 100 kW.

EV Data Map scores every potential charging site in Canada from 0 to 100 for profitability, combining ZEV registration density, daytime population, traffic, demographics, nearby competing chargers, and grid context. Enter any Neuville address below for an instant profitability score, demand projection, and recommended charger configuration — including ZEVIP, Quebec provincial, and utility incentive matching.

Neuville charging by the numbers

Locations
4
Chargers
12
DC Fast locations
1
Level 2 locations
3

Charging networks in Neuville

Featured charging locations in Neuville

  1. BRCC - Neuville - Shell — Neuville, QC, G0A 2R0 (Circuit électrique · DC Fast · 100 kW)
  2. Ville de Neuville - 230 rue du Père-Rhéaume — Neuville, QC, G0A 2R0 (Circuit électrique · Level 2 · 6.2 kW)
  3. Ville de Neuville - 716 des Érables — Neuville, QC, G0A 2R0 (Circuit électrique · Level 2 · 6.2 kW)
  4. Ville de Neuville - Marais Provancher — Neuville, QC, G0A 2R0 (Circuit électrique · Level 2 · 6.2 kW)

Incentives for EV chargers in Quebec

Neuville projects can typically stack three layers of funding: the federal Zero Emission Vehicle Infrastructure Program (ZEVIP) covering up to 50% of project costs, Quebec provincial programs for additional rebates and tax credits, and local utility incentives for grid-connected installations. Class 56 accelerated capital cost allowance (100% first-year writeoff) further improves project economics for commercial installations.

Use the analyzer to see which programs apply to a specific Neuville address along with eligible award amounts.

How profitability scores work in Neuville

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. For Canadian sites, demand draws on Statistics Canada ZEV registrations (Table 20-10-0024) projected forward to 2026 using province-level CAGR, daytime population from StatCan census tracts, and traffic patterns. Competition uses the count and quality of nearby chargers — including DC fast power, network reliability and dwell-fit. Operating economics include provincial electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Neuville specifically, our model factors local commute corridors, the existing footprint of 1 DC fast and 3 Level 2 sites, and the dwell profile of surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Neuville, Quebec?
There are 4 public EV charging locations in Neuville, Quebec, with a combined 12 individual chargers. 1 locations offer DC fast charging and 3 provide Level 2 charging.
What incentives apply to EV chargers in Quebec?
Most Neuville projects can stack the federal Zero Emission Vehicle Infrastructure Program (ZEVIP) — covering up to 50% of project costs — with provincial Quebec programs and utility incentives. Class 56 accelerated CCA is also available for commercial charging hardware.
What is the largest EV charging network in Neuville?
Circuit électrique operates the most public charging locations in Neuville with 4 sites.

Related coverage