EV Charging in North Hatley, Quebec

Public EV charging in North Hatley, Quebec. 4 charging locations (0 DC fast, 4 Level 2). Score any address with EV Data Map's free 0–100 site profitability analyzer — Canadian incentives via ZEVIP and provincial programs included.

North Hatley, Quebec is served by 4 public electric vehicle charging locations operating roughly 8 individual chargers. Of those, 0 (0%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 4 (100%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in North Hatley is Circuit électrique with 3 locations, followed by Tesla Destination with 1. Average DC fast power across the city is approximately 0 kW.

EV Data Map scores every potential charging site in Canada from 0 to 100 for profitability, combining ZEV registration density, daytime population, traffic, demographics, nearby competing chargers, and grid context. Enter any North Hatley address below for an instant profitability score, demand projection, and recommended charger configuration — including ZEVIP, Quebec provincial, and utility incentive matching.

North Hatley charging by the numbers

Locations
4
Chargers
8
DC Fast locations
0
Level 2 locations
4

Charging networks in North Hatley

Featured charging locations in North Hatley

  1. North Hatley - 3090 chemin Capelton — North Hatley, QC, J0B 2C0 (Circuit électrique · Level 2 · 7.7 kW)
  2. Manoir Hovey - Tesla Destination — North Hatley, QC, J0B 2C0 (Tesla Destination · Level 2 · 7.2 kW)
  3. North Hatley - 313-319 Chem. de la Rivière — North Hatley, QC, J0B 2C0 (Circuit électrique · Level 2 · 6.2 kW)
  4. North Hatley - Hôtel de Ville — North Hatley, QC, J0B 2C0 (Circuit électrique · Level 2 · 6.2 kW)

Incentives for EV chargers in Quebec

North Hatley projects can typically stack three layers of funding: the federal Zero Emission Vehicle Infrastructure Program (ZEVIP) covering up to 50% of project costs, Quebec provincial programs for additional rebates and tax credits, and local utility incentives for grid-connected installations. Class 56 accelerated capital cost allowance (100% first-year writeoff) further improves project economics for commercial installations.

Use the analyzer to see which programs apply to a specific North Hatley address along with eligible award amounts.

How profitability scores work in North Hatley

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. For Canadian sites, demand draws on Statistics Canada ZEV registrations (Table 20-10-0024) projected forward to 2026 using province-level CAGR, daytime population from StatCan census tracts, and traffic patterns. Competition uses the count and quality of nearby chargers — including DC fast power, network reliability and dwell-fit. Operating economics include provincial electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For North Hatley specifically, our model factors local commute corridors, the existing footprint of 0 DC fast and 4 Level 2 sites, and the dwell profile of surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in North Hatley, Quebec?
There are 4 public EV charging locations in North Hatley, Quebec, with a combined 8 individual chargers. 0 locations offer DC fast charging and 4 provide Level 2 charging.
What incentives apply to EV chargers in Quebec?
Most North Hatley projects can stack the federal Zero Emission Vehicle Infrastructure Program (ZEVIP) — covering up to 50% of project costs — with provincial Quebec programs and utility incentives. Class 56 accelerated CCA is also available for commercial charging hardware.
What is the largest EV charging network in North Hatley?
Circuit électrique operates the most public charging locations in North Hatley with 3 sites, followed by Tesla Destination with 1 sites.

Related coverage