Install EV Chargers in Mojave, California

Install EV chargers or analyze a site in Mojave, California. 12 existing public charging locations (10 DC fast, 2 Level 2). Free 0–100 profitability score on any Mojave address from EV Data Map by Charge Rigs.

Mojave, California is served by 12 public electric vehicle charging locations operating 73 individual chargers — an average of 6.1 chargers per site. Of those locations, 10 (83%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 2 (17%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Mojave is ChargePoint Network with 5 locations, followed by Tesla with 4. Average DC fast power across the city is approximately 161 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Mojave and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Mojave

Mojave, California, stands out in the realm of electric vehicle charging with a robust infrastructure of 12 public locations, 83% of which are dedicated to DC fast charging. The average DC fast charger delivers an impressive 161 kW, with half of the sites operating at 150 kW or higher, catering to the demand for quick top-ups. ChargePoint Network leads the market with 42% of the charging sites, ensuring a level of competition that enhances accessibility. This modern setup not only positions Mojave favorably within its surrounding areas, but the concentration of high-capacity chargers—topping out at 350 kW—offers an attractive solution for EV drivers seeking efficient and rapid charging options.

Mojave charging by the numbers

Locations
12
Chargers
73
DC Fast locations
10
Level 2 locations
2

DC fast share: 83% of locations. Level 2 share: 17%. Average chargers per site: 6.1. Average DC fast power: 161 kW.

Mojave charging — local snapshot

Top operator share
ChargePoint Network runs 42% of public locations across 4 networks.
Average DC fast power
161 kW (fastest stall: 350 kW)
High-power share
50% of DC fast sites are 150 kW-class or higher
Mix
83% DC fast / 17% Level 2 across 12 locations
Estimated DC ports
65 fast-charging ports city-wide

Charging networks in Mojave

The following operators run public charging in Mojave, ranked by number of locations.

Featured charging locations in Mojave

A selection of higher-power public charging locations across Mojave, sorted by power level.

  1. Comfort Inn & Suites (Mojave, CA) — Mojave, CA, 93501 (Electrify America · DC Fast · 350 kW)
  2. Mojave Thai Cuisine - Tesla Supercharger — Mojave, CA, 93501 (Tesla · DC Fast · 250 kW)
  3. The Workz Mojave - Tesla Supercharger — Mojave, CA, 93501 (Tesla · DC Fast · 250 kW)
  4. Wienerschnitzel - Tesla Supercharger — Mojave, CA, 93501 (Tesla · DC Fast · 250 kW)
  5. Anthony's Grill - Tesla Supercharger — Mojave, CA, 93501 (Tesla · DC Fast · 250 kW)
  6. GF4EVA MOJAVE DC3 — Mojave, CA, 93501 (ChargePoint Network · DC Fast · 62.5 kW)
  7. GF4EVA MOJAVE DC1 — Mojave, CA, 93501 (ChargePoint Network · DC Fast · 50 kW)
  8. GF4EVA MOJAVE DC4 — Mojave, CA, 93501 (ChargePoint Network · DC Fast · 50 kW)
  9. GF4EVA MOJAVE DC2 — Mojave, CA, 93501 (ChargePoint Network · DC Fast · 50 kW)
  10. Mojave Air & Spaceport (Building 1) — Mojave, CA, 93501 (EV Connect · DC Fast · 50 kW)
  11. Mojave Air & Spaceport (Administration) — Mojave, CA, 93501 (EV Connect · Level 2 · 9.6 kW)
  12. GF4EVA MOJAVE L2 — Mojave, CA, 93501 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Mojave specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 10 DC fast and 2 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Mojave, California?
There are 12 public electric vehicle charging locations in Mojave, California, with a combined 73 individual chargers. 10 locations offer DC fast charging and 2 provide Level 2 charging.
What is the largest EV charging network in Mojave?
ChargePoint Network operates the most public charging locations in Mojave with 5 sites, followed by Tesla with 4 sites.
How much does it cost to install an EV charger in Mojave?
Level 2 EV chargers in Mojave typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Mojave?
Most Mojave projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with California state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Mojave?
A typical commercial Level 2 installation in Mojave energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Mojave take to become profitable?
Payback in Mojave depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.