Install EV Chargers in Lake Worth, Florida

Install EV chargers or analyze a site in Lake Worth, Florida. 13 existing public charging locations (2 DC fast, 11 Level 2). Free 0–100 profitability score on any Lake Worth address from EV Data Map by Charge Rigs.

Lake Worth, Florida is served by 13 public electric vehicle charging locations operating 45 individual chargers — an average of 3.5 chargers per site. Of those locations, 2 (15%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 11 (85%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Lake Worth is Blink Network with 9 locations, followed by ChargePoint Network with 2. Average DC fast power across the city is approximately 265 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Lake Worth and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Lake Worth

Lake Worth, Florida presents a unique landscape for EV charging with a notable dominance of Blink Network, which operates 69% of the city's 13 public locations. This concentration on a single operator could influence decisions by site developers, as it affects factors like uptime and pricing for users. The city boasts an impressive lineup of DC fast charging options, with 100% of these stations providing at least 150 kW, and the fastest charging stall reaching 350 kW, placing Lake Worth at the forefront of ultra-fast charging in the region. While 15% of charging locations are DC fast, the predominance of Level 2 chargers indicates a mix that appeals to both quick and extended use, making it essential to evaluate driver preferences and local demand when planning new installations.

Lake Worth charging by the numbers

Locations
13
Chargers
45
DC Fast locations
2
Level 2 locations
11

DC fast share: 15% of locations. Level 2 share: 85%. Average chargers per site: 3.5. Average DC fast power: 265 kW.

Lake Worth charging — local snapshot

Top operator share
Blink Network runs 69% of public locations across 4 networks.
Average DC fast power
265 kW (fastest stall: 350 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
15% DC fast / 85% Level 2 across 13 locations
Estimated DC ports
10 fast-charging ports city-wide

Charging networks in Lake Worth

The following operators run public charging in Lake Worth, ranked by number of locations.

Featured charging locations in Lake Worth

A selection of higher-power public charging locations across Lake Worth, sorted by power level.

  1. Florida Power & Light - EVolution - West Palm Beach Turnpike Service Plaza — Lake Worth, FL, 33467 (FPLEV · DC Fast · 350 kW)
  2. Wayne Akers Ford — Lake Worth, FL, 33461 (CHARGESMART_EV · DC Fast · 180 kW)
  3. Altman Development Company (Parking 1) — Lake Worth, FL, 33436 (Blink Network · Level 2 · 13.5 kW)
  4. Altman Development Company — Lake Worth, FL, 33436 (Blink Network · Level 2 · 13.5 kW)
  5. Altman Development Company (Parking 2) — Lake Worth, FL, 33436 (Blink Network · Level 2 · 8.6 kW)
  6. El Bodegon Grocery — Lake Worth, FL, 33461 (Blink Network · Level 2 · 7.2 kW)
  7. Altman Development Company (Front Office) — Lake Worth, FL, 33436 (Blink Network · Level 2 · 6.8 kW)
  8. Mosaic Palms — Lake Worth, FL, 33467 (Blink Network · Level 2 · 6.7 kW)
  9. THE BOHEMIAN GARAGE — Lake Worth, FL, 33460 (ChargePoint Network · Level 2 · 6.5 kW)
  10. LAKE WORTH BCH BEACH COMPLEX — Lake Worth, FL, 33460 (ChargePoint Network · Level 2 · 6.5 kW)
  11. Altman Development Company (Parking 5) — Lake Worth, FL, 33436 (Blink Network · Level 2 · 3.9 kW)
  12. Altman Development Company (Parking 6) — Lake Worth, FL, 33436 (Blink Network · Level 2 · 3.9 kW)

Nearby cities with EV charging coverage

Other cities in Florida we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Lake Worth specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 2 DC fast and 11 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Lake Worth, Florida?
There are 13 public electric vehicle charging locations in Lake Worth, Florida, with a combined 45 individual chargers. 2 locations offer DC fast charging and 11 provide Level 2 charging.
What is the largest EV charging network in Lake Worth?
Blink Network operates the most public charging locations in Lake Worth with 9 sites, followed by ChargePoint Network with 2 sites.
How much does it cost to install an EV charger in Lake Worth?
Level 2 EV chargers in Lake Worth typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Lake Worth?
Most Lake Worth projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Florida state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Lake Worth?
A typical commercial Level 2 installation in Lake Worth energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Lake Worth take to become profitable?
Payback in Lake Worth depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage