Install EV chargers or analyze a site in Grand Island, Nebraska. 13 existing public charging locations (6 DC fast, 7 Level 2). Free 0–100 profitability score on any Grand Island address from EV Data Map by Charge Rigs.
Grand Island, Nebraska is served by 13 public electric vehicle charging locations operating 32 individual chargers — an average of 2.5 chargers per site. Of those locations, 6 (46%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 7 (54%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Grand Island is ChargePoint Network with 9 locations, followed by EV Connect with 2. Average DC fast power across the city is approximately 165 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Grand Island and receive an instant ROI score, demand projection, and recommended charger configuration.
What to know about charging in Grand Island
In Grand Island, Nebraska, the EV charging landscape is notably influenced by ChargePoint Network, which operates 69% of the 13 public charging locations, creating a critical reliance on a single provider for uptime and pricing. The six DC fast chargers, with an average output of 165 kW and the fastest at 350 kW, offer high-power options that cater to drivers looking for quick turnaround times. With half of the DC fast sites classified at 150 kW or higher, competitors aiming to establish a presence in this market should prioritize similar high-performance hardware to attract users. With nearly half of the public charging stations providing fast charge options, the local infrastructure balances quick access with longer-dwell Level 2 charging needs.
Grand Island charging by the numbers
Locations
13
Chargers
32
DC Fast locations
6
Level 2 locations
7
DC fast share: 46% of locations. Level 2 share: 54%. Average chargers per site: 2.5. Average DC fast power: 165 kW.
Grand Island charging — local snapshot
Top operator share
ChargePoint Network runs 69% of public locations across 4 networks.
Average DC fast power
165 kW (fastest stall: 350 kW)
High-power share
50% of DC fast sites are 150 kW-class or higher
Mix
46% DC fast / 54% Level 2 across 13 locations
Estimated DC ports
18 fast-charging ports city-wide
Charging networks in Grand Island
The following operators run public charging in Grand Island, ranked by number of locations.
ChargePoint Network — 9 locations
EV Connect — 2 locations
Tesla — 1 location
Electrify America — 1 location
Featured charging locations in Grand Island
A selection of higher-power public charging locations across Grand Island, sorted by power level.
Grand Island Quality Inn (Grand Island, NE) — Grand Island, NE, 68803 (Electrify America · DC Fast · 350 kW)
Grand Island Motor Company — GRAND ISLAND, NE, 68803 (EV Connect · DC Fast · 180 kW)
Bosselman Travel Center - Tesla Supercharger — Grand Island, NE, 68803 (Tesla · DC Fast · 150 kW)
GIMC HYUNDAI EAST DETAIL — Grand Island, NE, 68803 (ChargePoint Network · DC Fast · 125 kW)
GIMC HYUNDAI WEST DETAIL — Grand Island, NE, 68803 (ChargePoint Network · DC Fast · 125 kW)
RUSS'S MARKET STATION 2 — Grand Island, NE, 68801 (ChargePoint Network · DC Fast · 62.5 kW)
GIMC HYUNDAI SHOWROOM — Grand Island, NE, 68803 (ChargePoint Network · Level 2 · 12 kW)
GRISH - SpringHill Suites Grand Island - New Build — Grand Island, NE, 68803 (EV Connect · Level 2 · 9.6 kW)
HAMPTON GI EV1B — Grand Island, NE, 68803 (ChargePoint Network · Level 2 · 7.7 kW)
HAMPTON GI EV1A — Grand Island, NE, 68803 (ChargePoint Network · Level 2 · 7.7 kW)
RUSS'S MARKET STATION 1 — Grand Island, NE, 68801 (ChargePoint Network · Level 2 · 6.5 kW)
COMFORT GI68803 STATION 1 — Grand Island, NE, 68803 (ChargePoint Network · Level 2 · 6.5 kW)
Nearby cities with EV charging coverage
Other cities in Nebraska we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Grand Island specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 6 DC fast and 7 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.
Frequently asked questions
How many EV charging stations are in Grand Island, Nebraska?
There are 13 public electric vehicle charging locations in Grand Island, Nebraska, with a combined 32 individual chargers. 6 locations offer DC fast charging and 7 provide Level 2 charging.
What is the largest EV charging network in Grand Island?
ChargePoint Network operates the most public charging locations in Grand Island with 9 sites, followed by EV Connect with 2 sites.
How much does it cost to install an EV charger in Grand Island?
Level 2 EV chargers in Grand Island typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Grand Island?
Most Grand Island projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Nebraska state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Grand Island?
A typical commercial Level 2 installation in Grand Island energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Grand Island take to become profitable?
Payback in Grand Island depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.