Install EV Chargers in Amherst, New York

Install EV chargers or analyze a site in Amherst, New York. 16 existing public charging locations (2 DC fast, 14 Level 2). Free 0–100 profitability score on any Amherst address from EV Data Map by Charge Rigs.

Amherst, New York is served by 16 public electric vehicle charging locations operating 63 individual chargers — an average of 3.9 chargers per site. Of those locations, 2 (13%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 14 (88%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Amherst is ChargePoint Network with 12 locations, followed by CHARGESMART_EV with 3. Average DC fast power across the city is approximately 151 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Amherst and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Amherst

Amherst, New York, showcases a concentrated charging landscape, with ChargePoint Network operating 75% of its 16 public charging locations. This reliance on a single provider enhances the predictability of pricing and uptime but also suggests that competition must focus on differentiating service quality and hardware. The city's two DC fast chargers, averaging 151 kW and featuring a peak of 240 kW, position the area favorably for high-power needs, particularly since 50% of these sites are 150 kW-class or above. With a mix of DC fast and Level 2 charging options, operators have the opportunity to strategically fill gaps in the charging network based on Amherst's demographic and traffic patterns.

Amherst charging by the numbers

Locations
16
Chargers
63
DC Fast locations
2
Level 2 locations
14

DC fast share: 13% of locations. Level 2 share: 88%. Average chargers per site: 3.9. Average DC fast power: 151 kW.

Amherst charging — local snapshot

Top operator share
ChargePoint Network runs 75% of public locations across 3 networks.
Average DC fast power
151 kW (fastest stall: 240 kW)
High-power share
50% of DC fast sites are 150 kW-class or higher
Mix
13% DC fast / 87% Level 2 across 16 locations
Estimated DC ports
9 fast-charging ports city-wide

Charging networks in Amherst

The following operators run public charging in Amherst, ranked by number of locations.

Featured charging locations in Amherst

A selection of higher-power public charging locations across Amherst, sorted by power level.

  1. Buffalo Marriott Niagara — Amherst, NY, 14221 (CHARGESMART_EV · DC Fast · 240 kW)
  2. AAA WESTCENTRAL DC FAST CHARGER — Amherst, NY, 14221 (ChargePoint Network · DC Fast · 62.5 kW)
  3. Buffalo Marriott Niagara L2 — Amherst, NY, 14221 (CHARGESMART_EV · Level 2 · 9.6 kW)
  4. Candlewood Suites Buffalo Amherst — Amherst, NY, 14226 (CHARGESMART_EV · Level 2 · 9.6 kW)
  5. 626 Commerce Dr. — Amherst, NY, 14228 (FLO · Level 2 · 7.2 kW)
  6. HYATT PLACE HOTEL AMHERST 2 — Amherst, NY, 14226 (ChargePoint Network · Level 2 · 6.5 kW)
  7. ROYAL PARK ROYAL STATION 1 — Amherst, NY, 14221 (ChargePoint Network · Level 2 · 6.5 kW)
  8. REIKART HOUSE JAZZBOLINE 2 — Amherst, NY, 14226 (ChargePoint Network · Level 2 · 6.5 kW)
  9. NORTHTOWN CTR NTC STATION 2 — Amherst, NY, 14221 (ChargePoint Network · Level 2 · 6.5 kW)
  10. AAA WESTCENTRAL AAA L2 2 — Amherst, NY, 14221 (ChargePoint Network · Level 2 · 6.5 kW)
  11. HYATT PLACE HOTEL AMHERST 1 — Amherst, NY, 14226 (ChargePoint Network · Level 2 · 6.5 kW)
  12. NORTHTOWN CTR NTC STATION 1 — Amherst, NY, 14221 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in New York we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Amherst specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 2 DC fast and 14 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Amherst, New York?
There are 16 public electric vehicle charging locations in Amherst, New York, with a combined 63 individual chargers. 2 locations offer DC fast charging and 14 provide Level 2 charging.
What is the largest EV charging network in Amherst?
ChargePoint Network operates the most public charging locations in Amherst with 12 sites, followed by CHARGESMART_EV with 3 sites.
How much does it cost to install an EV charger in Amherst?
Level 2 EV chargers in Amherst typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Amherst?
Most Amherst projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with New York state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Amherst?
A typical commercial Level 2 installation in Amherst energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Amherst take to become profitable?
Payback in Amherst depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.