Install EV Chargers in Johnstown, New York

Install EV chargers or analyze a site in Johnstown, New York. 11 existing public charging locations (2 DC fast, 9 Level 2). Free 0–100 profitability score on any Johnstown address from EV Data Map by Charge Rigs.

Johnstown, New York is served by 11 public electric vehicle charging locations operating 37 individual chargers — an average of 3.4 chargers per site. Of those locations, 2 (18%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 9 (82%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Johnstown is ChargePoint Network with 4 locations, followed by VIALYNK with 3. Average DC fast power across the city is approximately 196 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Johnstown and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Johnstown

Johnstown stands out in the EV charging landscape with its diverse offering of 11 public charging locations, supported by six distinct networks, allowing for competitive pricing and uptime. ChargePoint Network leads the pack, operating 36% of these sites. Notably, the city boasts a modern high-power DC fast charging infrastructure, with both locations averaging 196 kW and peaking at 240 kW, ensuring drivers have access to efficient charging options. With 100% of DC fast sites classified as 150 kW or higher, Johnstown encourages thoughtful site selection based on power and amenities, catering to both quick stops and prolonged Level 2 charging needs. This variety positions Johnstown as a key player in the surrounding region, highlighting opportunities for further development.

Johnstown charging by the numbers

Locations
11
Chargers
37
DC Fast locations
2
Level 2 locations
9

DC fast share: 18% of locations. Level 2 share: 82%. Average chargers per site: 3.4. Average DC fast power: 196 kW.

Johnstown charging — local snapshot

Top operator share
ChargePoint Network runs 36% of public locations across 6 networks.
Average DC fast power
196 kW (fastest stall: 240 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
18% DC fast / 82% Level 2 across 11 locations
Estimated DC ports
14 fast-charging ports city-wide

Charging networks in Johnstown

The following operators run public charging in Johnstown, ranked by number of locations.

Featured charging locations in Johnstown

A selection of higher-power public charging locations across Johnstown, sorted by power level.

  1. Brown's Ford of Johnstown — Johnstown, NY, 12095 (FORD_CHARGE · DC Fast · 240 kW)
  2. Aldi Johnstown TUL 110 — Johnstown, NY, 12095 (RED_E · DC Fast · 151 kW)
  3. Hales Mills Country Club — Johnstown, NY, 12095 (AMPUP · Level 2 · 7.2 kW)
  4. Treiber Nissan — Johnstown, NY, 12095 (Non-Networked · Level 2 · 7.2 kW)
  5. Holiday Inn - Johnstown Side — Johnstown, NY, 12095 (VIALYNK · Level 2 · 6.7 kW)
  6. Clyde's Stop & Shop — Johnstown, NY, 12095 (VIALYNK · Level 2 · 6.7 kW)
  7. Holiday Inn - Johnstown Back — Johnstown, NY, 12095 (VIALYNK · Level 2 · 6.7 kW)
  8. FMCC FMCC 2 — Johnstown, NY, 12095 (ChargePoint Network · Level 2 · 6.5 kW)
  9. DMV PARKING LOT JOHNSTOWN — Johnstown, NY, 12095 (ChargePoint Network · Level 2 · 6.5 kW)
  10. FMCC FMCC 1 — Johnstown, NY, 12095 (ChargePoint Network · Level 2 · 6.5 kW)
  11. STEET TOYOTA INVENTORY SIDE — Johnstown, NY, 12095 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in New York we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Johnstown specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 2 DC fast and 9 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Johnstown, New York?
There are 11 public electric vehicle charging locations in Johnstown, New York, with a combined 37 individual chargers. 2 locations offer DC fast charging and 9 provide Level 2 charging.
What is the largest EV charging network in Johnstown?
ChargePoint Network operates the most public charging locations in Johnstown with 4 sites, followed by VIALYNK with 3 sites.
How much does it cost to install an EV charger in Johnstown?
Level 2 EV chargers in Johnstown typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Johnstown?
Most Johnstown projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with New York state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Johnstown?
A typical commercial Level 2 installation in Johnstown energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Johnstown take to become profitable?
Payback in Johnstown depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage