Install EV Chargers in Oneonta, New York

Install EV chargers or analyze a site in Oneonta, New York. 16 existing public charging locations (3 DC fast, 13 Level 2). Free 0–100 profitability score on any Oneonta address from EV Data Map by Charge Rigs.

Oneonta, New York is served by 16 public electric vehicle charging locations operating 50 individual chargers — an average of 3.1 chargers per site. Of those locations, 3 (19%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 13 (81%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Oneonta is ChargePoint Network with 8 locations, followed by Blink Network with 2. Average DC fast power across the city is approximately 217 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Oneonta and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Oneonta

Oneonta boasts a remarkably diverse EV charging landscape, featuring 16 public charging locations operated by eight distinct networks, with ChargePoint Network leading at half of the sites. The city’s three DC fast charging stations stand out with an impressive average power of 217 kW, including one ultra-fast stall reaching 350 kW. This robust offering, where 67% of the DC fast sites are 150 kW-class or higher, provides drivers with a compelling reason to choose their charging options based on power and amenities rather than brand loyalty. With 19% of the locations serving as DC fast chargers, Oneonta effectively accommodates both quick turnaround needs and longer stay requests, making it an attractive stop for EV drivers traveling through the region.

Oneonta charging by the numbers

Locations
16
Chargers
50
DC Fast locations
3
Level 2 locations
13

DC fast share: 19% of locations. Level 2 share: 81%. Average chargers per site: 3.1. Average DC fast power: 217 kW.

Oneonta charging — local snapshot

Top operator share
ChargePoint Network runs 50% of public locations across 8 networks.
Average DC fast power
217 kW (fastest stall: 350 kW)
High-power share
67% of DC fast sites are 150 kW-class or higher
Mix
19% DC fast / 81% Level 2 across 16 locations
Estimated DC ports
14 fast-charging ports city-wide

Charging networks in Oneonta

The following operators run public charging in Oneonta, ranked by number of locations.

Featured charging locations in Oneonta

A selection of higher-power public charging locations across Oneonta, sorted by power level.

  1. EVolve NY Oneonta — Oneonta, NY, 13820 (Electrify America · DC Fast · 350 kW)
  2. Mirabito Convenience Store #69 - Tesla Supercharger — Oneonta, NY, 13820 (Tesla · DC Fast · 250 kW)
  3. Country Club Imports — Oneonta, NY, 13820 (Non-Networked · DC Fast · 50 kW)
  4. Brooks BBQ — Oneonta, NY, 13820 (VIALYNK · Level 2 · 11.5 kW)
  5. College at Oneonta — Oneonta, NY, 13820 (Blink Network · Level 2 · 10.8 kW)
  6. Oneonta — Oneonta, NY, 13820 (CHARGELAB · Level 2 · 9.6 kW)
  7. Alumni Hall — Oneonta, NY, 13820 (Blink Network · Level 2 · 8.6 kW)
  8. Hampton Inn Oneonta - Tesla Destination — Oneonta, NY, 13820 (Tesla Destination · Level 2 · 7.2 kW)
  9. CITY OF ONEONTA MARKET STREET 3 — Oneonta, NY, 13820 (ChargePoint Network · Level 2 · 6.5 kW)
  10. CITY OF ONEONTA MARKET STREET 2 — Oneonta, NY, 13820 (ChargePoint Network · Level 2 · 6.5 kW)
  11. SUNY ONEONTA SUNY ONEONTA — Oneonta, NY, 13820 (ChargePoint Network · Level 2 · 6.5 kW)
  12. CITY OF ONEONTA MARKET STREET 5 — Oneonta, NY, 13820 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in New York we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Oneonta specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 3 DC fast and 13 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Oneonta, New York?
There are 16 public electric vehicle charging locations in Oneonta, New York, with a combined 50 individual chargers. 3 locations offer DC fast charging and 13 provide Level 2 charging.
What is the largest EV charging network in Oneonta?
ChargePoint Network operates the most public charging locations in Oneonta with 8 sites, followed by Blink Network with 2 sites.
How much does it cost to install an EV charger in Oneonta?
Level 2 EV chargers in Oneonta typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Oneonta?
Most Oneonta projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with New York state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Oneonta?
A typical commercial Level 2 installation in Oneonta energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Oneonta take to become profitable?
Payback in Oneonta depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage