Install EV Chargers in Cheyenne, Wyoming

Install EV chargers or analyze a site in Cheyenne, Wyoming. 19 existing public charging locations (9 DC fast, 10 Level 2). Free 0–100 profitability score on any Cheyenne address from EV Data Map by Charge Rigs.

Cheyenne, Wyoming is served by 19 public electric vehicle charging locations operating 48 individual chargers — an average of 2.5 chargers per site. Of those locations, 9 (47%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 10 (53%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Cheyenne is ChargePoint Network with 12 locations, followed by RIVIAN_ADVENTURE with 1. Average DC fast power across the city is approximately 144 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Cheyenne and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Cheyenne

Cheyenne, Wyoming's EV charging landscape is characterized by a concentrated network dominated by ChargePoint, which operates 63% of the city’s 19 public charging locations. With nearly half of these sites featuring DC fast chargers, the average power rating stands at 144 kW, offering ample options for quick top-ups. Notably, one third of the DC fast locations are 150 kW or higher, positioning new entrants with similar power ratings to attract drivers looking for competitive charging speeds. This concentrated yet evolving network presents a unique opportunity for site developers to fill potential service gaps, especially in light of the current mix of fast and Level 2 charging options that cater to both short and long-dwell charging needs.

Cheyenne charging by the numbers

Locations
19
Chargers
48
DC Fast locations
9
Level 2 locations
10

DC fast share: 47% of locations. Level 2 share: 53%. Average chargers per site: 2.5. Average DC fast power: 144 kW.

Cheyenne charging — local snapshot

Top operator share
ChargePoint Network runs 63% of public locations across 8 networks.
Average DC fast power
144 kW (fastest stall: 350 kW)
High-power share
33% of DC fast sites are 150 kW-class or higher
Mix
47% DC fast / 53% Level 2 across 19 locations
Estimated DC ports
26 fast-charging ports city-wide

Charging networks in Cheyenne

The following operators run public charging in Cheyenne, ranked by number of locations.

Featured charging locations in Cheyenne

A selection of higher-power public charging locations across Cheyenne, sorted by power level.

  1. Flying J 759 — Cheyenne, WY, 82007 (eVgo Network · DC Fast · 350 kW)
  2. Cheyenne, WY — Cheyenne, WY, 82009 (RIVIAN_ADVENTURE · DC Fast · 300 kW)
  3. Target T0224 (Cheyenne, WY) — Cheyenne, WY, 82009 (Electrify America · DC Fast · 150 kW)
  4. KG FORD CHEY POWER LINK 1 — Cheyenne, WY, 82001 (ChargePoint Network · DC Fast · 120 kW)
  5. Frontier Mall - Tesla Supercharger — Cheyenne, WY, 82009 (Tesla · DC Fast · 120 kW)
  6. KG FORD CHEY POWER LINK 2 — Cheyenne, WY, 82001 (ChargePoint Network · DC Fast · 120 kW)
  7. Tyrrell Chevrolet — Cheyenne, WY, 82001 (VIALYNK · DC Fast · 60 kW)
  8. Halladay Motors Inc — Cheyenne, WY, 82001 (EV Connect · DC Fast · 50 kW)
  9. HCHD_1 DCFAST HOG — Cheyenne, WY, 82001 (ChargePoint Network · DC Fast · 24 kW)
  10. WYHORSERACING STATION 4 — Cheyenne, WY, 82007 (ChargePoint Network · Level 2 · 19.2 kW)
  11. WYHORSERACING STATION 1 — Cheyenne, WY, 82007 (ChargePoint Network · Level 2 · 19.2 kW)
  12. WYHORSERACING STATION 2 — Cheyenne, WY, 82007 (ChargePoint Network · Level 2 · 19.2 kW)

Nearby cities with EV charging coverage

Other cities in Wyoming we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Cheyenne specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 9 DC fast and 10 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Cheyenne, Wyoming?
There are 19 public electric vehicle charging locations in Cheyenne, Wyoming, with a combined 48 individual chargers. 9 locations offer DC fast charging and 10 provide Level 2 charging.
What is the largest EV charging network in Cheyenne?
ChargePoint Network operates the most public charging locations in Cheyenne with 12 sites, followed by RIVIAN_ADVENTURE with 1 sites.
How much does it cost to install an EV charger in Cheyenne?
Level 2 EV chargers in Cheyenne typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Cheyenne?
Most Cheyenne projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Wyoming state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Cheyenne?
A typical commercial Level 2 installation in Cheyenne energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Cheyenne take to become profitable?
Payback in Cheyenne depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.