Install EV Chargers in Birmingham, Alabama

Install EV chargers or analyze a site in Birmingham, Alabama. 56 existing public charging locations (16 DC fast, 40 Level 2). Free 0–100 profitability score on any Birmingham address from EV Data Map by Charge Rigs.

Birmingham, Alabama is served by 56 public electric vehicle charging locations operating 223 individual chargers — an average of 4.0 chargers per site. Of those locations, 16 (29%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 40 (71%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Birmingham is ChargePoint Network with 23 locations, followed by Blink Network with 11. Average DC fast power across the city is approximately 186 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Birmingham and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Birmingham

Birmingham's EV charging landscape is marked by a competitive mix of 56 public locations, where 12 distinct operators, led by ChargePoint Network with 41% market share, offer varied options for drivers. This diversity fosters a nuanced selection process, allowing users to prioritize power levels and amenities. With 29% of the charging sites dedicated to DC fast charging, the average output of 186 kW—and a peak of 400 kW—positions Birmingham as a leader in providing high-power charging solutions. Notably, over half of these fast sites are 150 kW-class or higher, making it essential for new operators to consider high-capacity hardware to meet driver expectations. The combination of fast and Level 2 charging options results in approximately 100 DC fast ports, catering to both short and long dwell charging needs across the city.

Birmingham charging by the numbers

Locations
56
Chargers
223
DC Fast locations
16
Level 2 locations
40

DC fast share: 29% of locations. Level 2 share: 71%. Average chargers per site: 4.0. Average DC fast power: 186 kW.

Birmingham charging — local snapshot

Top operator share
ChargePoint Network runs 41% of public locations across 12 networks.
Average DC fast power
186 kW (fastest stall: 400 kW)
High-power share
56% of DC fast sites are 150 kW-class or higher
Mix
29% DC fast / 71% Level 2 across 56 locations
Estimated DC ports
100 fast-charging ports city-wide

Charging networks in Birmingham

The following operators run public charging in Birmingham, ranked by number of locations.

Featured charging locations in Birmingham

A selection of higher-power public charging locations across Birmingham, sorted by power level.

  1. The Summit Birmingham MB.HPC — Birmingham, AL, 35243 (MERCEDES_BENZ · DC Fast · 400 kW)
  2. Flying J Travel Center 602 — Birmingham, AL, 35207 (eVgo Network · DC Fast · 350 kW)
  3. Stivers Ford of Birmingham — Birmingham, AL, 35209 (RED_E · DC Fast · 321 kW)
  4. 1st Avenue South - Tesla Supercharger — Birmingham, AL, 35233 (Tesla · DC Fast · 250 kW)
  5. Target - Tesla Supercharger — Birmingham, AL, 35242 (Tesla · DC Fast · 250 kW)
  6. Shopping Center - Tesla Supercharger — Birmingham, AL, 35235 (Tesla · DC Fast · 250 kW)
  7. HALLMARK HYU H S R 1 — Birmingham, AL, 35203 (ChargePoint Network · DC Fast · 205 kW)
  8. HALLMARK HYU H S R 2 — Birmingham, AL, 35203 (ChargePoint Network · DC Fast · 205 kW)
  9. Uptown Entertainment District - Tesla Supercharger — Birmingham, AL, 35203 (Tesla · DC Fast · 150 kW)
  10. ALABAMA POWER BHM DIV 2 — Birmingham, AL, 35203 (ChargePoint Network · DC Fast · 125 kW)
  11. ALABAMA POWER BHM DIV 1 — Birmingham, AL, 35203 (ChargePoint Network · DC Fast · 125 kW)
  12. MAPCO 7549 — Birmingham, AL, 35242 (FCN · DC Fast · 120 kW)

Nearby cities with EV charging coverage

Other cities in Alabama we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Birmingham specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 16 DC fast and 40 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Birmingham, Alabama?
There are 56 public electric vehicle charging locations in Birmingham, Alabama, with a combined 223 individual chargers. 16 locations offer DC fast charging and 40 provide Level 2 charging.
What is the largest EV charging network in Birmingham?
ChargePoint Network operates the most public charging locations in Birmingham with 23 sites, followed by Blink Network with 11 sites.
How much does it cost to install an EV charger in Birmingham?
Level 2 EV chargers in Birmingham typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Birmingham?
Most Birmingham projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Alabama state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Birmingham?
A typical commercial Level 2 installation in Birmingham energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Birmingham take to become profitable?
Payback in Birmingham depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.