Install EV Chargers in Cullman, Alabama

Install EV chargers or analyze a site in Cullman, Alabama. 10 existing public charging locations (4 DC fast, 6 Level 2). Free 0–100 profitability score on any Cullman address from EV Data Map by Charge Rigs.

Cullman, Alabama is served by 10 public electric vehicle charging locations operating 28 individual chargers — an average of 2.8 chargers per site. Of those locations, 4 (40%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 6 (60%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Cullman is ChargePoint Network with 6 locations, followed by RED_E with 1. Average DC fast power across the city is approximately 236 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Cullman and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Cullman

Cullman, Alabama, stands out with a significant concentration of DC fast charging options, comprising 40% of its 10 public charging locations. The city's fast chargers average an impressive 236 kW, with 75% classified as 150 kW or higher, catering to the growing demand for ultra-fast charging among EV drivers. ChargePoint Network dominates the local landscape, operating 60% of the chargers, which ensures a certain level of reliability but also means that potential competitors must carefully consider their offerings to attract users. This blend of rapid charging capabilities and network reliability makes Cullman a prime location for EV infrastructure development, particularly for providers looking to establish their presence in a city with a strong power curve.

Cullman charging by the numbers

Locations
10
Chargers
28
DC Fast locations
4
Level 2 locations
6

DC fast share: 40% of locations. Level 2 share: 60%. Average chargers per site: 2.8. Average DC fast power: 236 kW.

Cullman charging — local snapshot

Top operator share
ChargePoint Network runs 60% of public locations across 5 networks.
Average DC fast power
236 kW (fastest stall: 325 kW)
High-power share
75% of DC fast sites are 150 kW-class or higher
Mix
40% DC fast / 60% Level 2 across 10 locations
Estimated DC ports
14 fast-charging ports city-wide

Charging networks in Cullman

The following operators run public charging in Cullman, ranked by number of locations.

Featured charging locations in Cullman

A selection of higher-power public charging locations across Cullman, sorted by power level.

  1. Cracker Barrel - Tesla Supercharger — Cullman, AL, 35058 (Tesla · DC Fast · 325 kW)
  2. CULLMANELECTRIC STATION1-L — Cullman, AL, 35058 (ChargePoint Network · DC Fast · 250 kW)
  3. CULLMANELECTRIC STATION2-R — Cullman, AL, 35058 (ChargePoint Network · DC Fast · 250 kW)
  4. Long Lewis Ford Lincoln of Cullman — Cullman, AL, 35058 (RED_E · DC Fast · 120 kW)
  5. Fairfield Inn & Suites Cullman - Tesla Destination — Cullman, AL, 35055 (Tesla Destination · Level 2 · 7.2 kW)
  6. Tony Serra Nissan — Cullman, AL, 35055 (Non-Networked · Level 2 · 7.2 kW)
  7. CRMC CRMC-1 - L2LEFT — Cullman, AL, 35058 (ChargePoint Network · Level 2 · 6.5 kW)
  8. CULLMAN PB STATION 1 — Cullman, AL, 35055 (ChargePoint Network · Level 2 · 6.5 kW)
  9. CULLMANELECTRIC CEC MAIN OFFICE — Cullman, AL, 35055 (ChargePoint Network · Level 2 · 6.5 kW)
  10. CRMC CRMC-2- L2RIGHT — Cullman, AL, 35058 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Alabama we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Cullman specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 4 DC fast and 6 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Cullman, Alabama?
There are 10 public electric vehicle charging locations in Cullman, Alabama, with a combined 28 individual chargers. 4 locations offer DC fast charging and 6 provide Level 2 charging.
What is the largest EV charging network in Cullman?
ChargePoint Network operates the most public charging locations in Cullman with 6 sites, followed by RED_E with 1 sites.
How much does it cost to install an EV charger in Cullman?
Level 2 EV chargers in Cullman typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Cullman?
Most Cullman projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Alabama state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Cullman?
A typical commercial Level 2 installation in Cullman energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Cullman take to become profitable?
Payback in Cullman depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage