Install EV Chargers in Juneau, Alaska

Install EV chargers or analyze a site in Juneau, Alaska. 17 existing public charging locations (3 DC fast, 14 Level 2). Free 0–100 profitability score on any Juneau address from EV Data Map by Charge Rigs.

Juneau, Alaska is served by 17 public electric vehicle charging locations operating 29 individual chargers — an average of 1.7 chargers per site. Of those locations, 3 (18%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 14 (82%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Juneau is Non-Networked with 14 locations, followed by SYNERGEV with 2. Average DC fast power across the city is approximately 48 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Juneau and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Juneau

In Juneau, Alaska, the public charging landscape is characterized by a significant reliance on a single operator, Non-Networked, which runs 82% of the 17 charging locations, creating a unique dynamic for potential site developers. With only 3 DC fast chargers averaging 48 kW—a relatively low power output by modern standards—new entrants offering 150 kW or more can provide a compelling advantage in driver attraction, especially in navigation apps. The predominant Level 2 chargers cater to longer dwell times, leaving a noticeable gap in high-speed charging options. As EV adoption grows, understanding this infrastructure landscape is crucial for identifying strategic opportunities that fill critical needs in Juneau's evolving market.

Juneau charging by the numbers

Locations
17
Chargers
29
DC Fast locations
3
Level 2 locations
14

DC fast share: 18% of locations. Level 2 share: 82%. Average chargers per site: 1.7. Average DC fast power: 48 kW.

Juneau charging — local snapshot

Top operator share
Non-Networked runs 82% of public locations across 3 networks.
Average DC fast power
48 kW (fastest stall: 50 kW)
High-power share
0% of DC fast sites are 150 kW-class or higher
Mix
18% DC fast / 82% Level 2 across 17 locations
Estimated DC ports
4 fast-charging ports city-wide

Charging networks in Juneau

The following operators run public charging in Juneau, ranked by number of locations.

Featured charging locations in Juneau

A selection of higher-power public charging locations across Juneau, sorted by power level.

  1. Downtown Transit Center — Juneau, AK, 99801 (Non-Networked · DC Fast · 50 kW)
  2. Fred Meyer Juneau — Juneau, AK, 99801 (Non-Networked · DC Fast · 50 kW)
  3. Alaskan Brewing Tap Room — Juneau, AK, 99801 (Non-Networked · DC Fast · 44 kW)
  4. Avis Juneau — Juneau, AK, 99801 (TURNONGREEN · Level 2 · 11 kW)
  5. Douglas Library — Juneau, AK, 99801 (Non-Networked · Level 2 · 10 kW)
  6. 305 Clinton Dr Building B Unit 1 — Juneau, AK, 99801 (SYNERGEV · Level 2 · 7.6 kW)
  7. 2354 Mendenhall Loop — Juneau, AK, 99801 (SYNERGEV · Level 2 · 7.6 kW)
  8. Juneau Hydropower — Juneau, AK, 99801 (Non-Networked · Level 2 · 7.2 kW)
  9. Eaglecrest Ski Area — Juneau, AK, 99801 (Non-Networked · Level 2 · 7.2 kW)
  10. Mendenhall Valley Public Library — Juneau, AK, 99801 (Non-Networked · Level 2 · 7.2 kW)
  11. University of Alaska Southeast — Juneau, AK, 99801 (Non-Networked · Level 2 · 7.2 kW)
  12. Alaska State Library, Archives, and Museum — Juneau, AK, 99801 (Non-Networked · Level 2 · 7.2 kW)

Nearby cities with EV charging coverage

Other cities in Alaska we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Juneau specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 3 DC fast and 14 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Juneau, Alaska?
There are 17 public electric vehicle charging locations in Juneau, Alaska, with a combined 29 individual chargers. 3 locations offer DC fast charging and 14 provide Level 2 charging.
What is the largest EV charging network in Juneau?
Non-Networked operates the most public charging locations in Juneau with 14 sites, followed by SYNERGEV with 2 sites.
How much does it cost to install an EV charger in Juneau?
Level 2 EV chargers in Juneau typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Juneau?
Most Juneau projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Alaska state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Juneau?
A typical commercial Level 2 installation in Juneau energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Juneau take to become profitable?
Payback in Juneau depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.