Install EV chargers or analyze a site in Gilbert, Arizona. 42 existing public charging locations (6 DC fast, 36 Level 2). Free 0–100 profitability score on any Gilbert address from EV Data Map by Charge Rigs.
Gilbert, Arizona is served by 42 public electric vehicle charging locations operating 126 individual chargers — an average of 3.0 chargers per site. Of those locations, 6 (14%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 36 (86%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Gilbert is ChargePoint Network with 28 locations, followed by Non-Networked with 4. Average DC fast power across the city is approximately 233 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Gilbert and receive an instant ROI score, demand projection, and recommended charger configuration.
In Gilbert, Arizona, the concentration of ChargePoint Network-operated locations, accounting for 67% of the 42 public charging sites, underscores a network reliability critical for developers considering entry into this market. The city boasts a competitive landscape for DC fast charging, with 14% of locations providing ultra-fast services that average an impressive 233 kW, peaking at 350 kW. Notably, 83% of these fast stations are 150 kW-class or higher, offering an attractive edge for drivers seeking rapid charging solutions. This robust infrastructure, paired with a significant number of Level 2 stations, highlights a strategic opportunity for new operators targeting both the high-power and longer-dwell charging demands in the region.
DC fast share: 14% of locations. Level 2 share: 86%. Average chargers per site: 3.0. Average DC fast power: 233 kW.
The following operators run public charging in Gilbert, ranked by number of locations.
A selection of higher-power public charging locations across Gilbert, sorted by power level.
Other cities in Arizona we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Gilbert specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 6 DC fast and 36 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.