Install EV Chargers in Queen Creek, Arizona

Install EV chargers or analyze a site in Queen Creek, Arizona. 21 existing public charging locations (4 DC fast, 17 Level 2). Free 0–100 profitability score on any Queen Creek address from EV Data Map by Charge Rigs.

Queen Creek, Arizona is served by 21 public electric vehicle charging locations operating 68 individual chargers — an average of 3.2 chargers per site. Of those locations, 4 (19%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 17 (81%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Queen Creek is ChargePoint Network with 17 locations, followed by WALMART with 1. Average DC fast power across the city is approximately 288 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Queen Creek and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Queen Creek

Queen Creek, Arizona boasts a strategic charging landscape, with 21 public locations, of which 4 offer DC fast charging options, comprising 19% of the total. The presence of ChargePoint Network at 81% of these sites ensures a high level of reliability and consistency for EV users. Notably, all DC fast charging stations operate at a robust average of 288 kW, including the fastest stall at an impressive 400 kW, positioning local offerings among the top tier in power capability. This ultra-fast charging capacity is critical, as it appeals to drivers prioritizing efficiency in their route planning. Additionally, the mix of charging options with 17 Level 2 units supports longer-dwell needs, creating a well-rounded infrastructure to meet diverse charging demands.

Queen Creek charging by the numbers

Locations
21
Chargers
68
DC Fast locations
4
Level 2 locations
17

DC fast share: 19% of locations. Level 2 share: 81%. Average chargers per site: 3.2. Average DC fast power: 288 kW.

Queen Creek charging — local snapshot

Top operator share
ChargePoint Network runs 81% of public locations across 5 networks.
Average DC fast power
288 kW (fastest stall: 400 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
19% DC fast / 81% Level 2 across 21 locations
Estimated DC ports
26 fast-charging ports city-wide

Charging networks in Queen Creek

The following operators run public charging in Queen Creek, ranked by number of locations.

Featured charging locations in Queen Creek

A selection of higher-power public charging locations across Queen Creek, sorted by power level.

  1. Walmart EV Charging — Queen Creek, AZ, 85142 (WALMART · DC Fast · 400 kW)
  2. GPM INVESTMENTS 4597 DC2 — Queen Creek, AZ, 85142 (ChargePoint Network · DC Fast · 250 kW)
  3. Queen Creek Olive Mill - Tesla Supercharger — Queen Creek, AZ, 85142 (Tesla · DC Fast · 250 kW)
  4. GPM INVESTMENTS 4597 DC1 — Queen Creek, AZ, 85142 (ChargePoint Network · DC Fast · 250 kW)
  5. Hampton Inn Queen Creek — Queen Creek, AZ, 85142 (Non-Networked · Level 2 · 7.2 kW)
  6. VSFC4 — Queen Creek, AZ, 85142 (AMPUP · Level 2 · 7.2 kW)
  7. LAS VENTANAS STATION 2 — Queen Creek, AZ, 85142 (ChargePoint Network · Level 2 · 6.5 kW)
  8. AHS STATIONS EV BLDG. #5 — Queen Creek, AZ, 85142 (ChargePoint Network · Level 2 · 6.5 kW)
  9. AHS STATIONS EV BLDG. #2 — Queen Creek, AZ, 85142 (ChargePoint Network · Level 2 · 6.5 kW)
  10. AHS STATIONS EV BLDG. #8 — Queen Creek, AZ, 85142 (ChargePoint Network · Level 2 · 6.5 kW)
  11. TSQC AFPQO000001Z38X — Queen Creek, AZ, 85142 (ChargePoint Network · Level 2 · 6.5 kW)
  12. LAS VENTANAS STATION 1 — Queen Creek, AZ, 85142 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Arizona we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Queen Creek specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 4 DC fast and 17 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Queen Creek, Arizona?
There are 21 public electric vehicle charging locations in Queen Creek, Arizona, with a combined 68 individual chargers. 4 locations offer DC fast charging and 17 provide Level 2 charging.
What is the largest EV charging network in Queen Creek?
ChargePoint Network operates the most public charging locations in Queen Creek with 17 sites, followed by WALMART with 1 sites.
How much does it cost to install an EV charger in Queen Creek?
Level 2 EV chargers in Queen Creek typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Queen Creek?
Most Queen Creek projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Arizona state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Queen Creek?
A typical commercial Level 2 installation in Queen Creek energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Queen Creek take to become profitable?
Payback in Queen Creek depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage