Install EV Chargers in Prescott, Arizona

Install EV chargers or analyze a site in Prescott, Arizona. 13 existing public charging locations (5 DC fast, 8 Level 2). Free 0–100 profitability score on any Prescott address from EV Data Map by Charge Rigs.

Prescott, Arizona is served by 13 public electric vehicle charging locations operating 41 individual chargers — an average of 3.2 chargers per site. Of those locations, 5 (38%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 8 (62%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Prescott is Blink Network with 3 locations, followed by ChargePoint Network with 3. Average DC fast power across the city is approximately 167 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Prescott and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Prescott

Prescott boasts a competitive and diverse public charging landscape with 13 locations operated by seven distinct networks, ensuring dynamic pricing and reliability for EV drivers. The presence of multiple operators encourages users to choose their charging site based on power and available amenities rather than brand loyalty. With an average DC fast power output of 167 kW and the fastest stall reaching 350 kW, the city showcases a robust offering, where 40% of fast-charging sites are 150 kW-class or higher. This high-power capability is advantageous for drivers utilizing navigation apps, highlighting Prescott as an attractive market for those seeking efficient and accessible charging options alongside its nearby cities.

Prescott charging by the numbers

Locations
13
Chargers
41
DC Fast locations
5
Level 2 locations
8

DC fast share: 38% of locations. Level 2 share: 62%. Average chargers per site: 3.2. Average DC fast power: 167 kW.

Prescott charging — local snapshot

Top operator share
Blink Network runs 23% of public locations across 7 networks.
Average DC fast power
167 kW (fastest stall: 350 kW)
High-power share
40% of DC fast sites are 150 kW-class or higher
Mix
38% DC fast / 62% Level 2 across 13 locations
Estimated DC ports
22 fast-charging ports city-wide

Charging networks in Prescott

The following operators run public charging in Prescott, ranked by number of locations.

Featured charging locations in Prescott

A selection of higher-power public charging locations across Prescott, sorted by power level.

  1. APS - Prescott (Prescott, AZ) — Prescott, AZ, 86301 (Electrify America · DC Fast · 350 kW)
  2. Pine Ridge Marketplace - Tesla Supercharger — Prescott, AZ, 86303 (Tesla · DC Fast · 325 kW)
  3. Findlay Hyundai Prescott — Prescott, AZ, 86301 (Blink Network · DC Fast · 60 kW)
  4. FINDLAY BUICK GMC — PRESCOTT, AZ, 86305 (EV Connect · DC Fast · 50 kW)
  5. Casa Chevrolet Cadillac of Prescott — Prescott, AZ, 86301 (EV Connect · DC Fast · 50 kW)
  6. Hilton Garden Inn - Prescott — Prescott, AZ, 86301 (Blink Network · Level 2 · 21.6 kW)
  7. Building 19 — Prescott, AZ, 86301 (Blink Network · Level 2 · 10.4 kW)
  8. Residence Inn by Marriott Prescott — Prescott, AZ, 86301 (Non-Networked · Level 2 · 7.2 kW)
  9. Forest Villas Hotel - Tesla Destination — Prescott, AZ, 86301 (Tesla Destination · Level 2 · 7.2 kW)
  10. SpringHill Suites by Marriott -Prescott - Tesla Destination — Prescott, AZ, 86301 (Tesla Destination · Level 2 · 7.2 kW)
  11. SPRINGHILL SUITES — Prescott, AZ, 86301 (ChargePoint Network · Level 2 · 6.5 kW)
  12. HAMPTON PRESCOT RIGHT STATION — Prescott, AZ, 86303 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Arizona we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Prescott specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 5 DC fast and 8 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Prescott, Arizona?
There are 13 public electric vehicle charging locations in Prescott, Arizona, with a combined 41 individual chargers. 5 locations offer DC fast charging and 8 provide Level 2 charging.
What is the largest EV charging network in Prescott?
Blink Network operates the most public charging locations in Prescott with 3 sites, followed by ChargePoint Network with 3 sites.
How much does it cost to install an EV charger in Prescott?
Level 2 EV chargers in Prescott typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Prescott?
Most Prescott projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Arizona state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Prescott?
A typical commercial Level 2 installation in Prescott energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Prescott take to become profitable?
Payback in Prescott depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage