Install EV Chargers in Peoria, Arizona

Install EV chargers or analyze a site in Peoria, Arizona. 15 existing public charging locations (2 DC fast, 13 Level 2). Free 0–100 profitability score on any Peoria address from EV Data Map by Charge Rigs.

Peoria, Arizona is served by 15 public electric vehicle charging locations operating 37 individual chargers — an average of 2.5 chargers per site. Of those locations, 2 (13%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 13 (87%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Peoria is ChargePoint Network with 9 locations, followed by Non-Networked with 3. Average DC fast power across the city is approximately 150 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Peoria and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Peoria

Peoria, Arizona, features a concentrated public EV charging landscape, with 60% of its 15 sites operated by ChargePoint Network, ensuring significant reliability and uptime for users. The city boasts a modern charging infrastructure, with 50% of its two DC fast charging locations offering an average power of 150 kW, positioning these sites competitively for drivers seeking rapid charging solutions. Notably, with the fastest stall reaching 250 kW, charging operators providing hardware in the 150–350 kW range could attract more EV users navigating local and outlying areas. While the remaining locations focus on longer dwell times with Level 2 ports, the strategic placement of DC fast chargers meaningfully influences charging behavior and accessibility across this growing market.

Peoria charging by the numbers

Locations
15
Chargers
37
DC Fast locations
2
Level 2 locations
13

DC fast share: 13% of locations. Level 2 share: 87%. Average chargers per site: 2.5. Average DC fast power: 150 kW.

Peoria charging — local snapshot

Top operator share
ChargePoint Network runs 60% of public locations across 5 networks.
Average DC fast power
150 kW (fastest stall: 250 kW)
High-power share
50% of DC fast sites are 150 kW-class or higher
Mix
13% DC fast / 87% Level 2 across 15 locations
Estimated DC ports
17 fast-charging ports city-wide

Charging networks in Peoria

The following operators run public charging in Peoria, ranked by number of locations.

Featured charging locations in Peoria

A selection of higher-power public charging locations across Peoria, sorted by power level.

  1. Park West - Tesla Supercharger — Peoria, AZ, 85345 (Tesla · DC Fast · 250 kW)
  2. AutoNation Chevrolet Arrowhead — Peoria, AZ, 85382 (Non-Networked · DC Fast · 50 kW)
  3. 2183 AutoNation Chevrolet Arrowhead — Peoria, AZ, 85382 (EV Connect · Level 2 · 19.2 kW)
  4. Marlowe Peoria Place - Parcel 1 — Peoria, AZ, 85345 (Blink Network · Level 2 · 13.5 kW)
  5. CVG - SKY AT P8 STATION 3 — Peoria, AZ, 85381 (ChargePoint Network · Level 2 · 7.7 kW)
  6. CVG - SKY AT P8 STATION 2 — Peoria, AZ, 85381 (ChargePoint Network · Level 2 · 7.7 kW)
  7. CVG - SKY AT P8 STATION 4 — Peoria, AZ, 85381 (ChargePoint Network · Level 2 · 7.7 kW)
  8. CVG - SKY AT P8 STATION 1 — Peoria, AZ, 85381 (ChargePoint Network · Level 2 · 7.7 kW)
  9. Audi Peoria — Peoria, AZ, 85382 (Non-Networked · Level 2 · 7.2 kW)
  10. Peoria Ford — Peoria, AZ, 85382 (Non-Networked · Level 2 · 7.2 kW)
  11. NACONA SOUTH STATION — Peoria, AZ, 85345 (ChargePoint Network · Level 2 · 6.5 kW)
  12. HQ CHARGERS HQ CHARGE SOUTH — Peoria, AZ, 85382 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Arizona we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Peoria specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 2 DC fast and 13 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Peoria, Arizona?
There are 15 public electric vehicle charging locations in Peoria, Arizona, with a combined 37 individual chargers. 2 locations offer DC fast charging and 13 provide Level 2 charging.
What is the largest EV charging network in Peoria?
ChargePoint Network operates the most public charging locations in Peoria with 9 sites, followed by Non-Networked with 3 sites.
How much does it cost to install an EV charger in Peoria?
Level 2 EV chargers in Peoria typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Peoria?
Most Peoria projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Arizona state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Peoria?
A typical commercial Level 2 installation in Peoria energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Peoria take to become profitable?
Payback in Peoria depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.