EV Charging in Lacombe, Alberta

Public EV charging in Lacombe, Alberta. 5 charging locations (2 DC fast, 3 Level 2). Score any address with EV Data Map's free 0–100 site profitability analyzer — Canadian incentives via ZEVIP and provincial programs included.

Lacombe, Alberta is served by 5 public electric vehicle charging locations operating roughly 9 individual chargers. Of those, 2 (40%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 3 (60%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Lacombe is Non-Networked with 2 locations, followed by Tesla Destination with 1. Average DC fast power across the city is approximately 145 kW.

EV Data Map scores every potential charging site in Canada from 0 to 100 for profitability, combining ZEV registration density, daytime population, traffic, demographics, nearby competing chargers, and grid context. Enter any Lacombe address below for an instant profitability score, demand projection, and recommended charger configuration — including ZEVIP, Alberta provincial, and utility incentive matching.

Lacombe charging by the numbers

Locations
5
Chargers
9
DC Fast locations
2
Level 2 locations
3

Charging networks in Lacombe

Featured charging locations in Lacombe

  1. Lacombe Ford — Lacombe, AB, T4L 1A3 (FORD_CHARGE · DC Fast · 240 kW)
  2. Lacombe Ford — Lacombe, AB, T4L 1A3 (FLO · DC Fast · 50 kW)
  3. Best Western Plus Lacombe Inn & Suites - Tesla Destination — Lacombe, AB, T4L 1K7 (Tesla Destination · Level 2 · 7.2 kW)
  4. LAND Auto Center — Lacombe, AB, T4L 1A4 (Non-Networked · Level 2 · 7.2 kW)
  5. Lacombe Ford — Lacombe, AB, T4L 1A3 (Non-Networked · Level 2 · 7.2 kW)

Frequently asked questions

How many EV charging stations are in Lacombe, Alberta?
There are 5 public EV charging locations in Lacombe, Alberta, with a combined 9 individual chargers. 2 locations offer DC fast charging and 3 provide Level 2 charging.
What incentives apply to EV chargers in Alberta?
Most Lacombe projects can stack the federal Zero Emission Vehicle Infrastructure Program (ZEVIP) — covering up to 50% of project costs — with provincial Alberta programs and utility incentives. Class 56 accelerated CCA is also available for commercial charging hardware.
What is the largest EV charging network in Lacombe?
Non-Networked operates the most public charging locations in Lacombe with 2 sites, followed by Tesla Destination with 1 sites.

Related coverage