EV Charging in Stonewall, Manitoba

Public EV charging in Stonewall, Manitoba. 6 charging locations (1 DC fast, 5 Level 2). Score any address with EV Data Map's free 0–100 site profitability analyzer — Canadian incentives via ZEVIP and provincial programs included.

Stonewall, Manitoba is served by 6 public electric vehicle charging locations operating roughly 10 individual chargers. Of those, 1 (17%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 5 (83%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Stonewall is Non-Networked with 3 locations, followed by ChargePoint Network with 2. Average DC fast power across the city is approximately 50 kW.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in Canada from 0 to 100 for DC Fast Charger ROI, combining ZEV registration density, daytime population, traffic, demographics, nearby competing chargers, and grid context. Enter any Stonewall address below for an instant ROI score, demand projection, and recommended charger configuration — including ZEVIP, Manitoba provincial, and utility incentive matching.

What to know about charging in Stonewall

Stonewall, Manitoba's EV charging landscape is characterized by a balanced mix of charging options, featuring 6 public locations with 1 DC fast charger that operates at 50 kW. While the DC fast charging share is modest at 17%, the presence of three distinct networks—including a leading Non-Networked operator—creates a moderately competitive environment without the pitfalls of a single-operator monopoly. This charging infrastructure primarily caters to longer dwell times with five Level 2 chargers, which indicates a demand for more robust DC fast charging solutions, particularly as new high-power entries begin to dominate consumer expectations. As such, Stonewall presents opportunities for development that can enhance the existing network, focusing on higher-capacity and strategically located chargers to better serve both local EV users and travelers.

Stonewall charging by the numbers

Locations
6
Chargers
10
DC Fast locations
1
Level 2 locations
5

Stonewall charging — local snapshot

Top operator share
Non-Networked runs 50% of public locations across 3 networks.
Average DC fast power
50 kW (fastest stall: 50 kW)
High-power share
0% of DC fast sites are 150 kW-class or higher
Mix
17% DC fast / 83% Level 2 across 6 locations
Estimated DC ports
1 fast-charging ports city-wide

Charging networks in Stonewall

Featured charging locations in Stonewall

  1. Stonewall Veterans Arena — Stonewall, MB, R0C 2Z0 (FLO · DC Fast · 50 kW)
  2. Stonewall Training Centre — Stonewall, MB, R0C 1G0 (Non-Networked · Level 2 · 16.6 kW)
  3. Eco-West Canada — Stonewall, MB, R0C 2Z0 (Non-Networked · Level 2 · 7.2 kW)
  4. STONEWALL STATION 1 — Stonewall, MB, R0C 2Z0 (ChargePoint Network · Level 2 · 6.5 kW)
  5. STONEWALL STATION 2 — Stonewall, MB, R0C 2Z0 (ChargePoint Network · Level 2 · 6.5 kW)
  6. Oak Hammock Marsh Interpretive Centre — Stonewall, MB, R0C 2Z0 (Non-Networked · Level 2 · 6 kW)

Nearby cities with EV charging coverage

Other cities in Manitoba we cover with full charging data and site profitability scoring.

Incentives for EV chargers in Manitoba

Stonewall projects can typically stack three layers of funding: the federal Zero Emission Vehicle Infrastructure Program (ZEVIP) covering up to 50% of project costs, Manitoba provincial programs for additional rebates and tax credits, and local utility incentives for grid-connected installations. Class 56 accelerated capital cost allowance (100% first-year writeoff) further improves project economics for commercial installations.

Use the analyzer to see which programs apply to a specific Stonewall address along with eligible award amounts.

How profitability scores work in Stonewall

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. For Canadian sites, demand draws on Statistics Canada ZEV registrations (Table 20-10-0024) projected forward to 2026 using province-level CAGR, daytime population from StatCan census tracts, and traffic patterns. Competition uses the count and quality of nearby chargers — including DC fast power, network reliability and dwell-fit. Operating economics include provincial electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Stonewall specifically, our model factors local commute corridors, the existing footprint of 1 DC fast and 5 Level 2 sites, and the dwell profile of surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Stonewall, Manitoba?
There are 6 public EV charging locations in Stonewall, Manitoba, with a combined 10 individual chargers. 1 locations offer DC fast charging and 5 provide Level 2 charging.
What incentives apply to EV chargers in Manitoba?
Most Stonewall projects can stack the federal Zero Emission Vehicle Infrastructure Program (ZEVIP) — covering up to 50% of project costs — with provincial Manitoba programs and utility incentives. Class 56 accelerated CCA is also available for commercial charging hardware.
What is the largest EV charging network in Stonewall?
Non-Networked operates the most public charging locations in Stonewall with 3 sites, followed by ChargePoint Network with 2 sites.

Related coverage