EV Charging in Stonewall, Manitoba

Public EV charging in Stonewall, Manitoba. 6 charging locations (1 DC fast, 5 Level 2). Score any address with EV Data Map's free 0–100 site profitability analyzer — Canadian incentives via ZEVIP and provincial programs included.

Stonewall, Manitoba is served by 6 public electric vehicle charging locations operating roughly 10 individual chargers. Of those, 1 (17%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 5 (83%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Stonewall is Non-Networked with 3 locations, followed by ChargePoint Network with 2. Average DC fast power across the city is approximately 50 kW.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in Canada from 0 to 100 for DC Fast Charger ROI, combining ZEV registration density, daytime population, traffic, demographics, nearby competing chargers, and grid context. Enter any Stonewall address below for an instant ROI score, demand projection, and recommended charger configuration — including ZEVIP, Manitoba provincial, and utility incentive matching.

What to know about charging in Stonewall

In Stonewall, Manitoba, the charging landscape features a balanced mix of six public locations, including one DC fast charger, which contributes to 17% of the total. With the DC fast station operating at a maximum of 50 kW, it lags behind the increasing demand for higher-power options, putting it at a disadvantage for time-sensitive drivers in navigation apps. The presence of three distinct charging networks, with Non-Networked operators managing half of the sites, fosters a competitive yet diverse environment for users. Analyzing Stonewall's charging distribution alongside nearby cities highlights potential opportunities for enhancing the EV infrastructure, particularly in scaling up fast charging capabilities to meet evolving driver needs.

Stonewall charging by the numbers

Locations
6
Chargers
10
DC Fast locations
1
Level 2 locations
5

Stonewall charging — local snapshot

Top operator share
Non-Networked runs 50% of public locations across 3 networks.
Average DC fast power
50 kW (fastest stall: 50 kW)
High-power share
0% of DC fast sites are 150 kW-class or higher
Mix
17% DC fast / 83% Level 2 across 6 locations
Estimated DC ports
1 fast-charging ports city-wide

Charging networks in Stonewall

Featured charging locations in Stonewall

  1. Stonewall Veterans Arena — Stonewall, MB, R0C 2Z0 (FLO · DC Fast · 50 kW)
  2. Stonewall Training Centre — Stonewall, MB, R0C 1G0 (Non-Networked · Level 2 · 16.6 kW)
  3. Eco-West Canada — Stonewall, MB, R0C 2Z0 (Non-Networked · Level 2 · 7.2 kW)
  4. STONEWALL STATION 1 — Stonewall, MB, R0C 2Z0 (ChargePoint Network · Level 2 · 6.5 kW)
  5. STONEWALL STATION 2 — Stonewall, MB, R0C 2Z0 (ChargePoint Network · Level 2 · 6.5 kW)
  6. Oak Hammock Marsh Interpretive Centre — Stonewall, MB, R0C 2Z0 (Non-Networked · Level 2 · 6 kW)

Nearby cities with EV charging coverage

Other cities in Manitoba we cover with full charging data and site profitability scoring.

Incentives for EV chargers in Manitoba

Stonewall projects can typically stack three layers of funding: the federal Zero Emission Vehicle Infrastructure Program (ZEVIP) covering up to 50% of project costs, Manitoba provincial programs for additional rebates and tax credits, and local utility incentives for grid-connected installations. Class 56 accelerated capital cost allowance (100% first-year writeoff) further improves project economics for commercial installations.

Use the analyzer to see which programs apply to a specific Stonewall address along with eligible award amounts.

How profitability scores work in Stonewall

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. For Canadian sites, demand draws on Statistics Canada ZEV registrations (Table 20-10-0024) projected forward to 2026 using province-level CAGR, daytime population from StatCan census tracts, and traffic patterns. Competition uses the count and quality of nearby chargers — including DC fast power, network reliability and dwell-fit. Operating economics include provincial electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Stonewall specifically, our model factors local commute corridors, the existing footprint of 1 DC fast and 5 Level 2 sites, and the dwell profile of surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Stonewall, Manitoba?
There are 6 public EV charging locations in Stonewall, Manitoba, with a combined 10 individual chargers. 1 locations offer DC fast charging and 5 provide Level 2 charging.
What incentives apply to EV chargers in Manitoba?
Most Stonewall projects can stack the federal Zero Emission Vehicle Infrastructure Program (ZEVIP) — covering up to 50% of project costs — with provincial Manitoba programs and utility incentives. Class 56 accelerated CCA is also available for commercial charging hardware.
What is the largest EV charging network in Stonewall?
Non-Networked operates the most public charging locations in Stonewall with 3 sites, followed by ChargePoint Network with 2 sites.