Install EV Chargers in Lompoc, California

Install EV chargers or analyze a site in Lompoc, California. 12 existing public charging locations (2 DC fast, 10 Level 2). Free 0–100 profitability score on any Lompoc address from EV Data Map by Charge Rigs.

Lompoc, California is served by 12 public electric vehicle charging locations operating 59 individual chargers — an average of 4.9 chargers per site. Of those locations, 2 (17%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 10 (83%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Lompoc is ChargePoint Network with 5 locations, followed by Tesla Destination with 3. Average DC fast power across the city is approximately 150 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Lompoc and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Lompoc

Lompoc offers a notably diverse charging landscape with 12 public locations operated by 6 distinct networks, fostering a competitive environment for pricing and availability. The emphasis on higher-power options is particularly appealing; 50% of DC fast chargers operate at 150 kW or above, with the capability to reach up to 250 kW at the fastest stall. This ensures that drivers can select charging options based on power needs rather than being limited to a single brand experience. With 17% of the charging infrastructure dedicated to DC fast stations, Lompoc addresses both immediate fast-charging requirements and longer-dwell Level 2 needs, enhancing the overall EV ecosystem in this vibrant California city.

Lompoc charging by the numbers

Locations
12
Chargers
59
DC Fast locations
2
Level 2 locations
10

DC fast share: 17% of locations. Level 2 share: 83%. Average chargers per site: 4.9. Average DC fast power: 150 kW.

Lompoc charging — local snapshot

Top operator share
ChargePoint Network runs 42% of public locations across 6 networks.
Average DC fast power
150 kW (fastest stall: 250 kW)
High-power share
50% of DC fast sites are 150 kW-class or higher
Mix
17% DC fast / 83% Level 2 across 12 locations
Estimated DC ports
14 fast-charging ports city-wide

Charging networks in Lompoc

The following operators run public charging in Lompoc, ranked by number of locations.

Featured charging locations in Lompoc

A selection of higher-power public charging locations across Lompoc, sorted by power level.

  1. Lompoc, CA - 3734 Constellation Road - Tesla Supercharger — Lompoc, CA, 93436 (Tesla · DC Fast · 250 kW)
  2. US Bank Lompoc — Lompoc, CA, 93426 (EVCS · DC Fast · 50 kW)
  3. Longoria Wines - Tesla Destination — Lompoc, CA, 93436 (Tesla Destination · Level 2 · 7.2 kW)
  4. Hilton Garden Inn Lompoc - Tesla Destination — Lompoc, CA, 93436 (Tesla Destination · Level 2 · 7.2 kW)
  5. Spear Vineyards and Winery - Tesla Destination — Lompoc, CA, 93436 (Tesla Destination · Level 2 · 7.2 kW)
  6. County of Santa Barbara - Lompoc Social Services — Lompoc, CA, 93436 (POWERFLEX · Level 2 · 7.2 kW)
  7. 3955 Apollo Way — Lompoc, CA, 93436 (CHARGIE · Level 2 · 6.6 kW)
  8. AHC LVC 3 — Lompoc, CA, 93436 (ChargePoint Network · Level 2 · 6.5 kW)
  9. AHC LVC 1 — Lompoc, CA, 93436 (ChargePoint Network · Level 2 · 6.5 kW)
  10. AHC LVC 2 — Lompoc, CA, 93436 (ChargePoint Network · Level 2 · 6.5 kW)
  11. CITY OF LOMPOC STATION 2 — Lompoc, CA, 93436 (ChargePoint Network · Level 2 · 6.5 kW)
  12. CITY OF LOMPOC STATION 1 — Lompoc, CA, 93436 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Lompoc specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 2 DC fast and 10 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Lompoc, California?
There are 12 public electric vehicle charging locations in Lompoc, California, with a combined 59 individual chargers. 2 locations offer DC fast charging and 10 provide Level 2 charging.
What is the largest EV charging network in Lompoc?
ChargePoint Network operates the most public charging locations in Lompoc with 5 sites, followed by Tesla Destination with 3 sites.
How much does it cost to install an EV charger in Lompoc?
Level 2 EV chargers in Lompoc typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Lompoc?
Most Lompoc projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with California state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Lompoc?
A typical commercial Level 2 installation in Lompoc energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Lompoc take to become profitable?
Payback in Lompoc depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage