Install EV chargers or analyze a site in Northglenn, Colorado. 10 existing public charging locations (2 DC fast, 8 Level 2). Free 0–100 profitability score on any Northglenn address from EV Data Map by Charge Rigs.
Northglenn, Colorado is served by 10 public electric vehicle charging locations operating 35 individual chargers — an average of 3.5 chargers per site. Of those locations, 2 (20%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 8 (80%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Northglenn is ChargePoint Network with 8 locations, followed by EV Connect with 1. Average DC fast power across the city is approximately 245 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Northglenn and receive an instant ROI score, demand projection, and recommended charger configuration.
In Northglenn, Colorado, public charging is characterized by a strong reliance on ChargePoint Network, which operates 80% of the 10 available charging locations. This concentration not only influences uptime and reliability but also informs strategic decisions for potential site developers. The city's DC fast charging options are notably robust, averaging 245 kW with 100% of these fast sites rated over 150 kW-class, positioning them among the fastest in the nation. With 20% of public charging locations offering rapid charging, new entrants targeting 150–350 kW hardware can effectively meet local demand and stand out in navigation app preferences. Additionally, the combination of available Level 2 and fast charging infrastructure offers a unique landscape for operators to assess the best opportunities for expansion.
DC fast share: 20% of locations. Level 2 share: 80%. Average chargers per site: 3.5. Average DC fast power: 245 kW.
The following operators run public charging in Northglenn, ranked by number of locations.
A selection of higher-power public charging locations across Northglenn, sorted by power level.
Other cities in Colorado we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Northglenn specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 2 DC fast and 8 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.