Install EV Chargers in Thornton, Colorado

Install EV chargers or analyze a site in Thornton, Colorado. 39 existing public charging locations (7 DC fast, 32 Level 2). Free 0–100 profitability score on any Thornton address from EV Data Map by Charge Rigs.

Thornton, Colorado is served by 39 public electric vehicle charging locations operating 103 individual chargers — an average of 2.6 chargers per site. Of those locations, 7 (18%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 32 (82%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Thornton is ChargePoint Network with 28 locations, followed by Electrify America with 3. Average DC fast power across the city is approximately 301 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Thornton and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Thornton

Thornton, Colorado's public charging infrastructure is primarily driven by ChargePoint Network, controlling 72% of the 39 charging locations, which creates opportunities for operational reliability and standardization. With an impressive average DC fast charging power of 301 kW and 86% of these stations exceeding 150 kW, the city offers a competitive edge for drivers seeking quick power-ups; notably, the highest stall reaches 400 kW. This ultra-fast charging capability is essential for optimizing user experience on navigation apps. The remaining infrastructure caters to longer-stay Level 2 charging needs, indicating a balanced approach to EV charging. As new operators consider entering the market, leveraging the existing landscape and understanding driver preferences will be crucial for success.

Thornton charging by the numbers

Locations
39
Chargers
103
DC Fast locations
7
Level 2 locations
32

DC fast share: 18% of locations. Level 2 share: 82%. Average chargers per site: 2.6. Average DC fast power: 301 kW.

Thornton charging — local snapshot

Top operator share
ChargePoint Network runs 72% of public locations across 9 networks.
Average DC fast power
301 kW (fastest stall: 400 kW)
High-power share
86% of DC fast sites are 150 kW-class or higher
Mix
18% DC fast / 82% Level 2 across 39 locations
Estimated DC ports
42 fast-charging ports city-wide

Charging networks in Thornton

The following operators run public charging in Thornton, ranked by number of locations.

Featured charging locations in Thornton

A selection of higher-power public charging locations across Thornton, sorted by power level.

  1. The Grove Thornton MB.HPC — Thornton, CO, 80023 (MERCEDES_BENZ · DC Fast · 400 kW)
  2. Phillips 66 Thornton (Thornton, CO) — Thornton, CO, 80233 (Electrify America · DC Fast · 350 kW)
  3. Walmart 1231 (Thornton, CO) — Thornton, CO, 80229 (Electrify America · DC Fast · 350 kW)
  4. Simon Denver Premium Outlets (Thornton, CO) — Thornton, CO, 80229 (Electrify America · DC Fast · 350 kW)
  5. Larkridge Shopping Center — Thornton, CO, 80023 (eVgo Network · DC Fast · 350 kW)
  6. Kum & Go #321 - Tesla Supercharger — Thornton, CO, 80233 (Tesla · DC Fast · 250 kW)
  7. Washington Plaza — Thornton, CO, 80229 (GRAVITI_ENERGY · DC Fast · 60 kW)
  8. K1 SPEED K1 SPEED 2 — Thornton, CO, 80023 (ChargePoint Network · Level 2 · 7.7 kW)
  9. K1 SPEED K1 SPEED 1 — Thornton, CO, 80023 (ChargePoint Network · Level 2 · 7.7 kW)
  10. Fieldhouse Leasing Office — Thornton, CO, 80241 (LOOP · Level 2 · 7.7 kW)
  11. MHP OVERLOOK B2 — Thornton, CO, 80260 (ChargePoint Network · Level 2 · 7.7 kW)
  12. MHP OVERLOOK B1 — Thornton, CO, 80260 (ChargePoint Network · Level 2 · 7.7 kW)

Nearby cities with EV charging coverage

Other cities in Colorado we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Thornton specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 7 DC fast and 32 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Thornton, Colorado?
There are 39 public electric vehicle charging locations in Thornton, Colorado, with a combined 103 individual chargers. 7 locations offer DC fast charging and 32 provide Level 2 charging.
What is the largest EV charging network in Thornton?
ChargePoint Network operates the most public charging locations in Thornton with 28 sites, followed by Electrify America with 3 sites.
How much does it cost to install an EV charger in Thornton?
Level 2 EV chargers in Thornton typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Thornton?
Most Thornton projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Colorado state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Thornton?
A typical commercial Level 2 installation in Thornton energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Thornton take to become profitable?
Payback in Thornton depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.