Install EV Chargers in Bridgeport, Connecticut

Install EV chargers or analyze a site in Bridgeport, Connecticut. 23 existing public charging locations (3 DC fast, 20 Level 2). Free 0–100 profitability score on any Bridgeport address from EV Data Map by Charge Rigs.

Bridgeport, Connecticut is served by 23 public electric vehicle charging locations operating 92 individual chargers — an average of 4.0 chargers per site. Of those locations, 3 (13%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 20 (87%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Bridgeport is Non-Networked with 9 locations, followed by LOOP with 5. Average DC fast power across the city is approximately 167 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Bridgeport and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Bridgeport

Bridgeport features a robust public EV charging infrastructure with 23 locations diversified across 6 distinct networks, ensuring competitive pricing and uptime. The presence of Non-Networked sites, making up 39% of these locations, encourages drivers to select charging options based on power output and amenities rather than being tied to one brand. With 3 DC fast chargers averaging 167 kW—one reaching up to 250 kW—Bridgeport’s offerings cater to high-power needs, where one-third of the fast chargers are classified at 150 kW or higher. This strategic mix of DC fast and Level 2 stations aligns well with local demand patterns, providing essential insights for site developers looking to optimize their charging networks.

Bridgeport charging by the numbers

Locations
23
Chargers
92
DC Fast locations
3
Level 2 locations
20

DC fast share: 13% of locations. Level 2 share: 87%. Average chargers per site: 4.0. Average DC fast power: 167 kW.

Bridgeport charging — local snapshot

Top operator share
Non-Networked runs 39% of public locations across 6 networks.
Average DC fast power
167 kW (fastest stall: 250 kW)
High-power share
33% of DC fast sites are 150 kW-class or higher
Mix
13% DC fast / 87% Level 2 across 23 locations
Estimated DC ports
18 fast-charging ports city-wide

Charging networks in Bridgeport

The following operators run public charging in Bridgeport, ranked by number of locations.

Featured charging locations in Bridgeport

A selection of higher-power public charging locations across Bridgeport, sorted by power level.

  1. Bridgeport - Tesla Supercharger — Bridgeport, CT, 06608 (Tesla · DC Fast · 250 kW)
  2. PARK CITY FORD PARKCITY01 — Bridgeport, CT, 06606 (ChargePoint Network · DC Fast · 125 kW)
  3. PARK CITY FORD PARKCITY02 — Bridgeport, CT, 06606 (ChargePoint Network · DC Fast · 125 kW)
  4. 62 Coleman St — Bridgeport, CT, 06604 (LOOP · Level 2 · 7.7 kW)
  5. 72 Coleman St — Bridgeport, CT, 06604 (LOOP · Level 2 · 7.7 kW)
  6. Windward Apartments — Bridgeport, CT, 06604 (EVGATEWAY · Level 2 · 7.7 kW)
  7. Mortons Mortuary Inc — Bridgeport, CT, 06607 (EVGATEWAY · Level 2 · 7.7 kW)
  8. PDQ Plumbing & Heating — Bridgeport, CT, 06610 (LOOP · Level 2 · 7.7 kW)
  9. Crescent Crossings 1C LLC — Bridgeport, CT, 06608 (EVGATEWAY · Level 2 · 7.7 kW)
  10. 476 Brooks St — Bridgeport, CT, 06608 (LOOP · Level 2 · 7.7 kW)
  11. 349 Nichols St — Bridgeport, CT, 06608 (LOOP · Level 2 · 7.7 kW)
  12. 191 Oak st — Bridgeport, CT, 06604 (Non-Networked · Level 2 · 7.6 kW)

Nearby cities with EV charging coverage

Other cities in Connecticut we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Bridgeport specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 3 DC fast and 20 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Bridgeport, Connecticut?
There are 23 public electric vehicle charging locations in Bridgeport, Connecticut, with a combined 92 individual chargers. 3 locations offer DC fast charging and 20 provide Level 2 charging.
What is the largest EV charging network in Bridgeport?
Non-Networked operates the most public charging locations in Bridgeport with 9 sites, followed by LOOP with 5 sites.
How much does it cost to install an EV charger in Bridgeport?
Level 2 EV chargers in Bridgeport typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Bridgeport?
Most Bridgeport projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Connecticut state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Bridgeport?
A typical commercial Level 2 installation in Bridgeport energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Bridgeport take to become profitable?
Payback in Bridgeport depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.