Install EV Chargers in Trumbull, Connecticut

Install EV chargers or analyze a site in Trumbull, Connecticut. 10 existing public charging locations (2 DC fast, 8 Level 2). Free 0–100 profitability score on any Trumbull address from EV Data Map by Charge Rigs.

Trumbull, Connecticut is served by 10 public electric vehicle charging locations operating 48 individual chargers — an average of 4.8 chargers per site. Of those locations, 2 (20%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 8 (80%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Trumbull is OpConnect with 4 locations, followed by LOOP with 4. Average DC fast power across the city is approximately 338 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Trumbull and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Trumbull

Trumbull, Connecticut boasts a well-balanced charging infrastructure with 10 public locations, including 2 ultra-fast DC fast chargers averaging an impressive 338 kW, and all powered by 150 kW or more. This robust offering, dominated by a mix of four distinct networks, positions Trumbull as a competitive player in the regional EV landscape—especially appealing for drivers seeking high-speed charging options without the constraints of a single operator. With OpConnect managing 40% of sites, users benefit from both reliability and variety. The unique infrastructure accommodates a broader spectrum of charging needs, enabling seamless access for both quick stop-and-go charging and longer dwell times at the Level 2 stations, ultimately enhancing the area's attractiveness to EV users.

Trumbull charging by the numbers

Locations
10
Chargers
48
DC Fast locations
2
Level 2 locations
8

DC fast share: 20% of locations. Level 2 share: 80%. Average chargers per site: 4.8. Average DC fast power: 338 kW.

Trumbull charging — local snapshot

Top operator share
OpConnect runs 40% of public locations across 4 networks.
Average DC fast power
338 kW (fastest stall: 350 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
20% DC fast / 80% Level 2 across 10 locations
Estimated DC ports
16 fast-charging ports city-wide

Charging networks in Trumbull

The following operators run public charging in Trumbull, ranked by number of locations.

Featured charging locations in Trumbull

A selection of higher-power public charging locations across Trumbull, sorted by power level.

  1. Westfield Trumbull (Trumbull, CT) — Trumbull, CT, 06611 (Electrify America · DC Fast · 350 kW)
  2. Target - Tesla Supercharger — Trumbull, CT, 06611 (Tesla · DC Fast · 325 kW)
  3. CES-23 Oakview — Trumbull, CT, 06611 (LOOP · Level 2 · 19.2 kW)
  4. CES-25 Oakview — Trumbull, CT, 06611 (LOOP · Level 2 · 19.2 kW)
  5. CES-40 Lindeman — Trumbull, CT, 06611 (LOOP · Level 2 · 19.2 kW)
  6. Garden Homes - Trumbull Main St Bldg 1 — Trumbull, CT, 06611 (OpConnect · Level 2 · 7.7 kW)
  7. Garden Homes - Trumbull Main St Bldg. 5 — Trumbull, CT, 06611 (OpConnect · Level 2 · 7.7 kW)
  8. Garden Homes - Trumbull Main St Bldg 2 — Trumbull, CT, 06611 (OpConnect · Level 2 · 7.7 kW)
  9. 61 Monroe Turnpike — Trumbull, CT, 06611 (LOOP · Level 2 · 7.7 kW)
  10. Garden Homes - Trumbull Main St Bldg. 4 — Trumbull, CT, 06611 (OpConnect · Level 2 · 7.2 kW)

Nearby cities with EV charging coverage

Other cities in Connecticut we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Trumbull specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 2 DC fast and 8 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Trumbull, Connecticut?
There are 10 public electric vehicle charging locations in Trumbull, Connecticut, with a combined 48 individual chargers. 2 locations offer DC fast charging and 8 provide Level 2 charging.
What is the largest EV charging network in Trumbull?
OpConnect operates the most public charging locations in Trumbull with 4 sites, followed by LOOP with 4 sites.
How much does it cost to install an EV charger in Trumbull?
Level 2 EV chargers in Trumbull typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Trumbull?
Most Trumbull projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Connecticut state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Trumbull?
A typical commercial Level 2 installation in Trumbull energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Trumbull take to become profitable?
Payback in Trumbull depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.