Install EV Chargers in Stamford, Connecticut

Install EV chargers or analyze a site in Stamford, Connecticut. 44 existing public charging locations (6 DC fast, 38 Level 2). Free 0–100 profitability score on any Stamford address from EV Data Map by Charge Rigs.

Stamford, Connecticut is served by 44 public electric vehicle charging locations operating 311 individual chargers — an average of 7.1 chargers per site. Of those locations, 6 (14%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 38 (86%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Stamford is ChargePoint Network with 11 locations, followed by Non-Networked with 6. Average DC fast power across the city is approximately 176 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Stamford and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Stamford

Stamford's public charging landscape stands out with a diverse portfolio of 44 locations managed by 11 distinct operators, ensuring competitive pricing and accessibility for EV drivers. ChargePoint Network leads as the top provider, maintaining 25% of the sites, while the presence of multiple brands allows drivers to choose based on power and amenities. The six DC fast charging locations are particularly noteworthy, averaging 176 kW, with a peak power of 350 kW at the fastest stall. Furthermore, one-third of these DC fast sites offer chargers rated 150 kW or higher, catering to the demand for rapid charging. This variety in power options positions Stamford as a strategic hub for EV charging, appealing to users who prioritize efficiency in their charging experience.

Stamford charging by the numbers

Locations
44
Chargers
311
DC Fast locations
6
Level 2 locations
38

DC fast share: 14% of locations. Level 2 share: 86%. Average chargers per site: 7.1. Average DC fast power: 176 kW.

Stamford charging — local snapshot

Top operator share
ChargePoint Network runs 25% of public locations across 11 networks.
Average DC fast power
176 kW (fastest stall: 350 kW)
High-power share
33% of DC fast sites are 150 kW-class or higher
Mix
14% DC fast / 86% Level 2 across 44 locations
Estimated DC ports
72 fast-charging ports city-wide

Charging networks in Stamford

The following operators run public charging in Stamford, ranked by number of locations.

Featured charging locations in Stamford

A selection of higher-power public charging locations across Stamford, sorted by power level.

  1. Ridgeway Shopping Center (Stamford, CT) — Stamford, CT, 06905 (Electrify America · DC Fast · 350 kW)
  2. Stamford Town Center - Tesla Supercharger — Stamford, CT, 06901 (Tesla · DC Fast · 325 kW)
  3. KIA MAIN KS CPE250 1 — Stamford, CT, 06902 (ChargePoint Network · DC Fast · 125 kW)
  4. KIA MAIN KS CPE250 2 — Stamford, CT, 06902 (ChargePoint Network · DC Fast · 125 kW)
  5. Ridgeway Shopping Center - Tesla Supercharger — Stamford, CT, 06905 (Tesla · DC Fast · 72 kW)
  6. Minchin Buick of Stamford — Stamford, CT, 6902 (Blink Network · DC Fast · 60 kW)
  7. 121 Towne Apartments — Stamford, CT, 6902 (Blink Network · Level 2 · 16.6 kW)
  8. 711 Canal - Parking Lot — Stamford, CT, 06902 (EVOKE · Level 2 · 12 kW)
  9. Park Square West — Stamford, CT, 6901 (Blink Network · Level 2 · 8.6 kW)
  10. 101 Park Place — Stamford, CT, 6902 (Blink Network · Level 2 · 8.6 kW)
  11. Diego Mechanics — Stamford, CT, 06902 (EVGATEWAY · Level 2 · 7.7 kW)
  12. 18 Dock St — Stamford, CT, 06902 (LOOP · Level 2 · 7.7 kW)

Nearby cities with EV charging coverage

Other cities in Connecticut we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Stamford specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 6 DC fast and 38 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Stamford, Connecticut?
There are 44 public electric vehicle charging locations in Stamford, Connecticut, with a combined 311 individual chargers. 6 locations offer DC fast charging and 38 provide Level 2 charging.
What is the largest EV charging network in Stamford?
ChargePoint Network operates the most public charging locations in Stamford with 11 sites, followed by Non-Networked with 6 sites.
How much does it cost to install an EV charger in Stamford?
Level 2 EV chargers in Stamford typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Stamford?
Most Stamford projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Connecticut state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Stamford?
A typical commercial Level 2 installation in Stamford energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Stamford take to become profitable?
Payback in Stamford depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage