Install EV Chargers in Cocoa, Florida

Install EV chargers or analyze a site in Cocoa, Florida. 12 existing public charging locations (3 DC fast, 9 Level 2). Free 0–100 profitability score on any Cocoa address from EV Data Map by Charge Rigs.

Cocoa, Florida is served by 12 public electric vehicle charging locations operating 40 individual chargers — an average of 3.3 chargers per site. Of those locations, 3 (25%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 9 (75%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Cocoa is ChargePoint Network with 6 locations, followed by Blink Network with 2. Average DC fast power across the city is approximately 317 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Cocoa and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Cocoa

Cocoa's EV charging landscape stands out with its blend of competitive pricing and diverse operator options, featuring 12 public locations across six distinct networks. ChargePoint Network dominates with half of the sites, creating a robust environment for drivers to choose based on power and amenities rather than brand loyalty. Notably, Cocoa hosts three DC fast charging locations with an impressive average power of 317 kW, including a peak facility at 350 kW, positioning it as a leader in ultra-fast charging options. With 75% of its charging infrastructure dedicated to Level 2 stations, Cocoa effectively caters to both rapid and longer-duration charging needs, enhancing its appeal to various EV users and offering valuable insights for site developers looking to optimize EV investments.

Cocoa charging by the numbers

Locations
12
Chargers
40
DC Fast locations
3
Level 2 locations
9

DC fast share: 25% of locations. Level 2 share: 75%. Average chargers per site: 3.3. Average DC fast power: 317 kW.

Cocoa charging — local snapshot

Top operator share
ChargePoint Network runs 50% of public locations across 6 networks.
Average DC fast power
317 kW (fastest stall: 350 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
25% DC fast / 75% Level 2 across 12 locations
Estimated DC ports
22 fast-charging ports city-wide

Charging networks in Cocoa

The following operators run public charging in Cocoa, ranked by number of locations.

Featured charging locations in Cocoa

A selection of higher-power public charging locations across Cocoa, sorted by power level.

  1. Flying J 1096 — Cocoa, FL, 32926 (eVgo Network · DC Fast · 350 kW)
  2. Sam's Club 4991 (Cocoa, FL) — Cocoa, FL, 32926 (Electrify America · DC Fast · 350 kW)
  3. Wawa - Tesla Supercharger — Cocoa, FL, 32922 (Tesla · DC Fast · 250 kW)
  4. Replacement Units — Cocoa, FL, 32922 (CHARGEUP · Level 2 · 7.6 kW)
  5. Mike Erdman Cadillac — Cocoa, FL, 32926 (Blink Network · Level 2 · 7.2 kW)
  6. FPL EVOLUTION CITY OF COCOA 2 — Cocoa, FL, 32922 (ChargePoint Network · Level 2 · 6.5 kW)
  7. FPL EVOLUTION CITY OF COCOA 1 — Cocoa, FL, 32922 (ChargePoint Network · Level 2 · 6.5 kW)
  8. FPL EVOLUTION FDOT DIST 5 1 — Cocoa, FL, 32927 (ChargePoint Network · Level 2 · 6.5 kW)
  9. COCOA GRAND APT STATION 1 — Cocoa, FL, 32926 (ChargePoint Network · Level 2 · 6.5 kW)
  10. The Preserve at Cocoa — Cocoa, FL, 32926 (Blink Network · Level 2 · 6.5 kW)
  11. FPL EVOLUTION CITY OF COCOA 3 — Cocoa, FL, 32922 (ChargePoint Network · Level 2 · 6.5 kW)
  12. FPL EVOLUTION FDOT DIST 5 2 — Cocoa, FL, 32927 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Florida we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Cocoa specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 3 DC fast and 9 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Cocoa, Florida?
There are 12 public electric vehicle charging locations in Cocoa, Florida, with a combined 40 individual chargers. 3 locations offer DC fast charging and 9 provide Level 2 charging.
What is the largest EV charging network in Cocoa?
ChargePoint Network operates the most public charging locations in Cocoa with 6 sites, followed by Blink Network with 2 sites.
How much does it cost to install an EV charger in Cocoa?
Level 2 EV chargers in Cocoa typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Cocoa?
Most Cocoa projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Florida state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Cocoa?
A typical commercial Level 2 installation in Cocoa energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Cocoa take to become profitable?
Payback in Cocoa depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.