Install EV chargers or analyze a site in Titusville, Florida. 16 existing public charging locations (4 DC fast, 12 Level 2). Free 0–100 profitability score on any Titusville address from EV Data Map by Charge Rigs.
Titusville, Florida is served by 16 public electric vehicle charging locations operating 56 individual chargers — an average of 3.5 chargers per site. Of those locations, 4 (25%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 12 (75%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Titusville is ChargePoint Network with 9 locations, followed by Non-Networked with 2. Average DC fast power across the city is approximately 236 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Titusville and receive an instant ROI score, demand projection, and recommended charger configuration.
What to know about charging in Titusville
Titusville features a competitive and diverse EV charging landscape, with 16 public locations spread across six distinct networks, ensuring that drivers have ample choice for their charging needs. The ChargePoint Network dominates with 56% of the sites, providing a reliable option while allowing room for competition from other operators like Tesla and FPLEV. The city's DC fast charging locations are particularly impressive, averaging 236 kW, with 75% classified as 150 kW or higher, offering ultra-fast charging capabilities that cater to the demands of modern EV users. This strategic mix of charging options enables residents and visitors alike to select their charging stations based on power needs and amenities, enhancing the overall driving experience in the area.
Titusville charging by the numbers
Locations
16
Chargers
56
DC Fast locations
4
Level 2 locations
12
DC fast share: 25% of locations. Level 2 share: 75%. Average chargers per site: 3.5. Average DC fast power: 236 kW.
Titusville charging — local snapshot
Top operator share
ChargePoint Network runs 56% of public locations across 6 networks.
Average DC fast power
236 kW (fastest stall: 400 kW)
High-power share
75% of DC fast sites are 150 kW-class or higher
Mix
25% DC fast / 75% Level 2 across 16 locations
Estimated DC ports
31 fast-charging ports city-wide
Charging networks in Titusville
The following operators run public charging in Titusville, ranked by number of locations.
ChargePoint Network — 9 locations
Non-Networked — 2 locations
Tesla — 2 locations
Tesla Destination — 1 location
FPLEV — 1 location
Blink Network — 1 location
Featured charging locations in Titusville
A selection of higher-power public charging locations across Titusville, sorted by power level.
Dixie Crossroads — Titusville, FL, 32796 (FPLEV · DC Fast · 400 kW)
Target - Tesla Supercharger — Titusville, FL, 32780 (Tesla · DC Fast · 250 kW)
Titus Landing Shopping Mall - Tesla Supercharger — Titusville, FL, 32780 (Tesla · DC Fast · 250 kW)
Pat Fischer Nissan — Titusville, FL, 32780 (Non-Networked · DC Fast · 44 kW)
Casa Coquina Del Mar Bed & Breakfast - Tesla Destination — Titusville, FL, 32780 (Non-Networked · Level 2 · 7.2 kW)
Hampton Inn Titusville - Tesla Destination — Titusville, FL, 32780 (Tesla Destination · Level 2 · 7.2 kW)
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Titusville specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 4 DC fast and 12 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.
Frequently asked questions
How many EV charging stations are in Titusville, Florida?
There are 16 public electric vehicle charging locations in Titusville, Florida, with a combined 56 individual chargers. 4 locations offer DC fast charging and 12 provide Level 2 charging.
What is the largest EV charging network in Titusville?
ChargePoint Network operates the most public charging locations in Titusville with 9 sites, followed by Non-Networked with 2 sites.
How much does it cost to install an EV charger in Titusville?
Level 2 EV chargers in Titusville typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Titusville?
Most Titusville projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Florida state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Titusville?
A typical commercial Level 2 installation in Titusville energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Titusville take to become profitable?
Payback in Titusville depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.