Install EV Chargers in Titusville, Florida

Install EV chargers or analyze a site in Titusville, Florida. 16 existing public charging locations (4 DC fast, 12 Level 2). Free 0–100 profitability score on any Titusville address from EV Data Map by Charge Rigs.

Titusville, Florida is served by 16 public electric vehicle charging locations operating 56 individual chargers — an average of 3.5 chargers per site. Of those locations, 4 (25%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 12 (75%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Titusville is ChargePoint Network with 9 locations, followed by Non-Networked with 2. Average DC fast power across the city is approximately 236 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Titusville and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Titusville

Titusville boasts a competitive public charging landscape, featuring 16 locations operated by six distinct networks, with ChargePoint dominating at 56% of the sites. This diverse operator ecosystem promotes competitive pricing and uptime, allowing drivers to select charging options based on power and amenities instead of relying on a single brand. The city’s four DC fast charging stations stand out with an impressive average power of 236 kW and a peak capability of 400 kW, ensuring rapid top-ups for electric vehicle users. Notably, 75% of these fast chargers exceed 150 kW, catering to high-demand drivers. This robust mix of fast and Level 2 chargers, along with the ability to assess demand through the EV Data Map, positions Titusville as an evolving hub for electric mobility in Central Florida.

Titusville charging by the numbers

Locations
16
Chargers
56
DC Fast locations
4
Level 2 locations
12

DC fast share: 25% of locations. Level 2 share: 75%. Average chargers per site: 3.5. Average DC fast power: 236 kW.

Titusville charging — local snapshot

Top operator share
ChargePoint Network runs 56% of public locations across 6 networks.
Average DC fast power
236 kW (fastest stall: 400 kW)
High-power share
75% of DC fast sites are 150 kW-class or higher
Mix
25% DC fast / 75% Level 2 across 16 locations
Estimated DC ports
31 fast-charging ports city-wide

Charging networks in Titusville

The following operators run public charging in Titusville, ranked by number of locations.

Featured charging locations in Titusville

A selection of higher-power public charging locations across Titusville, sorted by power level.

  1. Dixie Crossroads — Titusville, FL, 32796 (FPLEV · DC Fast · 400 kW)
  2. Target - Tesla Supercharger — Titusville, FL, 32780 (Tesla · DC Fast · 250 kW)
  3. Titus Landing Shopping Mall - Tesla Supercharger — Titusville, FL, 32780 (Tesla · DC Fast · 250 kW)
  4. Pat Fischer Nissan — Titusville, FL, 32780 (Non-Networked · DC Fast · 44 kW)
  5. Casa Coquina Del Mar Bed & Breakfast - Tesla Destination — Titusville, FL, 32780 (Non-Networked · Level 2 · 7.2 kW)
  6. Hampton Inn Titusville - Tesla Destination — Titusville, FL, 32780 (Tesla Destination · Level 2 · 7.2 kW)
  7. FPL EVOLUTION KENNEDY OSB1-8 — Titusville, FL, 32899 (ChargePoint Network · Level 2 · 6.5 kW)
  8. FPL EVOLUTION KENNEDY OSB1-6 — Titusville, FL, 32899 (ChargePoint Network · Level 2 · 6.5 kW)
  9. FPL EVOLUTION KENNEDY OSB1-5 — Titusville, FL, 32899 (ChargePoint Network · Level 2 · 6.5 kW)
  10. FPL EVOLUTION KENNEDY OSB1-4 — Titusville, FL, 32899 (ChargePoint Network · Level 2 · 6.5 kW)
  11. FPL EVOLUTION KENNEDY SSPF-3 — Titusville, FL, 32899 (ChargePoint Network · Level 2 · 6.5 kW)
  12. FPL EVOLUTION KENNEDY OSB1-7 — Titusville, FL, 32899 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Florida we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Titusville specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 4 DC fast and 12 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Titusville, Florida?
There are 16 public electric vehicle charging locations in Titusville, Florida, with a combined 56 individual chargers. 4 locations offer DC fast charging and 12 provide Level 2 charging.
What is the largest EV charging network in Titusville?
ChargePoint Network operates the most public charging locations in Titusville with 9 sites, followed by Non-Networked with 2 sites.
How much does it cost to install an EV charger in Titusville?
Level 2 EV chargers in Titusville typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Titusville?
Most Titusville projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Florida state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Titusville?
A typical commercial Level 2 installation in Titusville energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Titusville take to become profitable?
Payback in Titusville depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage