Install EV chargers or analyze a site in Deerfield Beach, Florida. 17 existing public charging locations (3 DC fast, 14 Level 2). Free 0–100 profitability score on any Deerfield Beach address from EV Data Map by Charge Rigs.
Deerfield Beach, Florida is served by 17 public electric vehicle charging locations operating 49 individual chargers — an average of 2.9 chargers per site. Of those locations, 3 (18%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 14 (82%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Deerfield Beach is ChargePoint Network with 9 locations, followed by Tesla Destination with 1. Average DC fast power across the city is approximately 260 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Deerfield Beach and receive an instant ROI score, demand projection, and recommended charger configuration.
What to know about charging in Deerfield Beach
Deerfield Beach boasts a competitive public charging landscape with 17 locations powered by 9 distinct operators, led by ChargePoint Network, which accounts for over half of the sites. This variety not only enhances competitive pricing and uptime but also offers drivers the opportunity to select chargers based on power output and amenities rather than brand loyalty. The city’s 3 DC fast charging stations, averaging an impressive 260 kW and featuring a peak power of 350 kW, represent a robust ultra-fast charging option, with all fast sites operating at 150 kW or higher. As 18% of the public stations are DC fast, balancing quick charges and Level 2 options effectively supports both short-stay and longer-dwell EV drivers in the area.
Deerfield Beach charging by the numbers
Locations
17
Chargers
49
DC Fast locations
3
Level 2 locations
14
DC fast share: 18% of locations. Level 2 share: 82%. Average chargers per site: 2.9. Average DC fast power: 260 kW.
Deerfield Beach charging — local snapshot
Top operator share
ChargePoint Network runs 53% of public locations across 9 networks.
Average DC fast power
260 kW (fastest stall: 350 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
18% DC fast / 82% Level 2 across 17 locations
Estimated DC ports
16 fast-charging ports city-wide
Charging networks in Deerfield Beach
The following operators run public charging in Deerfield Beach, ranked by number of locations.
ChargePoint Network — 9 locations
Tesla Destination — 1 location
TURNONGREEN — 1 location
7CHARGE — 1 location
Blink Network — 1 location
CHARGEUP — 1 location
Tesla — 1 location
Electrify America — 1 location
Featured charging locations in Deerfield Beach
A selection of higher-power public charging locations across Deerfield Beach, sorted by power level.
Target T1337 (Deerfield, FL) — Deerfield Beach, FL, 33441 (Electrify America · DC Fast · 350 kW)
Wawa - Tesla Supercharger — Deerfield Beach, FL, 33442 (Tesla · DC Fast · 250 kW)
7Charge - Deerfield Beach 34782 — Deerfield Beach, FL, 33064 (7CHARGE · DC Fast · 180 kW)
USA Deerfield Parking Garage — Deerfield Beach, FL, 33441 (Blink Network · Level 2 · 21.6 kW)
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Deerfield Beach specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 3 DC fast and 14 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.
Frequently asked questions
How many EV charging stations are in Deerfield Beach, Florida?
There are 17 public electric vehicle charging locations in Deerfield Beach, Florida, with a combined 49 individual chargers. 3 locations offer DC fast charging and 14 provide Level 2 charging.
What is the largest EV charging network in Deerfield Beach?
ChargePoint Network operates the most public charging locations in Deerfield Beach with 9 sites, followed by Tesla Destination with 1 sites.
How much does it cost to install an EV charger in Deerfield Beach?
Level 2 EV chargers in Deerfield Beach typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Deerfield Beach?
Most Deerfield Beach projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Florida state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Deerfield Beach?
A typical commercial Level 2 installation in Deerfield Beach energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Deerfield Beach take to become profitable?
Payback in Deerfield Beach depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.