Install EV Chargers in Oakland Park, Florida

Install EV chargers or analyze a site in Oakland Park, Florida. 14 existing public charging locations (2 DC fast, 12 Level 2). Free 0–100 profitability score on any Oakland Park address from EV Data Map by Charge Rigs.

Oakland Park, Florida is served by 14 public electric vehicle charging locations operating 55 individual chargers — an average of 3.9 chargers per site. Of those locations, 2 (14%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 12 (86%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Oakland Park is ChargePoint Network with 9 locations, followed by Blink Network with 3. Average DC fast power across the city is approximately 223 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Oakland Park and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Oakland Park

Oakland Park, Florida offers a concentrated charging landscape, with ChargePoint Network dominating 64% of the 14 public charging locations. This reliance on a single operator ensures consistent uptime and pricing, making it a critical consideration for new site developers. Notably, the city's two DC fast charging sites boast an impressive average power of 223 kW, with the fastest reaching 325 kW, positioning them well above average US standards. Moreover, with 50% of DC fast options rated at 150 kW or higher, new installations utilizing similar high-capacity setups will appeal to drivers seeking rapid charging solutions. The remaining locations cater to longer-dwell needs, reflecting a balanced approach to EV infrastructure in the city’s evolving market.

Oakland Park charging by the numbers

Locations
14
Chargers
55
DC Fast locations
2
Level 2 locations
12

DC fast share: 14% of locations. Level 2 share: 86%. Average chargers per site: 3.9. Average DC fast power: 223 kW.

Oakland Park charging — local snapshot

Top operator share
ChargePoint Network runs 64% of public locations across 4 networks.
Average DC fast power
223 kW (fastest stall: 325 kW)
High-power share
50% of DC fast sites are 150 kW-class or higher
Mix
14% DC fast / 86% Level 2 across 14 locations
Estimated DC ports
16 fast-charging ports city-wide

Charging networks in Oakland Park

The following operators run public charging in Oakland Park, ranked by number of locations.

Featured charging locations in Oakland Park

A selection of higher-power public charging locations across Oakland Park, sorted by power level.

  1. Wawa - Tesla Supercharger — Oakland Park, FL, 33311 (Tesla · DC Fast · 325 kW)
  2. FPL EVolution - Sprouts Farmers Market — Oakland Park, FL, 33334 (FPLEV · DC Fast · 120 kW)
  3. Oaklyn — Oakland Park, FL, 33306 (Blink Network · Level 2 · 8.3 kW)
  4. MYP Commercial Place — Oakland Park, FL, 33309 (Blink Network · Level 2 · 7.2 kW)
  5. BLYS — Oakland Park, FL, 33334 (Blink Network · Level 2 · 7.2 kW)
  6. CMVC STATION 1 — Oakland Park, FL, 33311 (ChargePoint Network · Level 2 · 6.5 kW)
  7. FPL EVOLUTION FDOT DIST 4-4 — Oakland Park, FL, 33309 (ChargePoint Network · Level 2 · 6.5 kW)
  8. CMVC STATION 3 — Oakland Park, FL, 33311 (ChargePoint Network · Level 2 · 6.5 kW)
  9. CMVC STATION 2 — Oakland Park, FL, 33311 (ChargePoint Network · Level 2 · 6.5 kW)
  10. OAKLAND PARK FL PROSPECT EAST — Oakland Park, FL, 33334 (ChargePoint Network · Level 2 · 6.5 kW)
  11. FPL EVOLUTION FDOT DIST 4-2 — Oakland Park, FL, 33309 (ChargePoint Network · Level 2 · 6.5 kW)
  12. SAFEGUARD OAKLAND PARK — Oakland Park, FL, 33311 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Florida we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Oakland Park specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 2 DC fast and 12 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Oakland Park, Florida?
There are 14 public electric vehicle charging locations in Oakland Park, Florida, with a combined 55 individual chargers. 2 locations offer DC fast charging and 12 provide Level 2 charging.
What is the largest EV charging network in Oakland Park?
ChargePoint Network operates the most public charging locations in Oakland Park with 9 sites, followed by Blink Network with 3 sites.
How much does it cost to install an EV charger in Oakland Park?
Level 2 EV chargers in Oakland Park typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Oakland Park?
Most Oakland Park projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Florida state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Oakland Park?
A typical commercial Level 2 installation in Oakland Park energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Oakland Park take to become profitable?
Payback in Oakland Park depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage