Install EV Chargers in Lake Mary, Florida

Install EV chargers or analyze a site in Lake Mary, Florida. 16 existing public charging locations (1 DC fast, 15 Level 2). Free 0–100 profitability score on any Lake Mary address from EV Data Map by Charge Rigs.

Lake Mary, Florida is served by 16 public electric vehicle charging locations operating 49 individual chargers — an average of 3.1 chargers per site. Of those locations, 1 (6%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 15 (94%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Lake Mary is ChargePoint Network with 8 locations, followed by CHARGEUP with 3. Average DC fast power across the city is approximately 350 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Lake Mary and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Lake Mary

Lake Mary boasts a robust public charging market with 16 sites serviced by five distinct operators, creating a competitive environment for drivers. ChargePoint Network dominates with 50% of the locations, ensuring varied pricing and reliable uptime. Notably, the city features a single DC fast charging station that delivers an impressive average power of 350 kW, marking it as an ultra-fast option amidst its 6% DC fast share. With all DC fast locations rated at 150 kW or higher, drivers have access to some of the fastest chargers currently available, making the choice of charging sites more about power and amenities rather than brand loyalty. This strategic mix of fast and Level 2 charging options positions Lake Mary as an appealing hub for EV users, encouraging thoughtful infrastructure development.

Lake Mary charging by the numbers

Locations
16
Chargers
49
DC Fast locations
1
Level 2 locations
15

DC fast share: 6% of locations. Level 2 share: 94%. Average chargers per site: 3.1. Average DC fast power: 350 kW.

Lake Mary charging — local snapshot

Top operator share
ChargePoint Network runs 50% of public locations across 5 networks.
Average DC fast power
350 kW (fastest stall: 350 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
6% DC fast / 94% Level 2 across 16 locations
Estimated DC ports
10 fast-charging ports city-wide

Charging networks in Lake Mary

The following operators run public charging in Lake Mary, ranked by number of locations.

Featured charging locations in Lake Mary

A selection of higher-power public charging locations across Lake Mary, sorted by power level.

  1. Target T0845 (Lake Mary, FL) — Lake Mary, FL, 32746 (Electrify America · DC Fast · 350 kW)
  2. Piedmont Office Realty Trust - 400 TownPark, LLC — Lake Mary, FL, 32746 (Blink Network · Level 2 · 10.4 kW)
  3. HCI LMS STATION 2 — Lake Mary, FL, 32746 (ChargePoint Network · Level 2 · 9.6 kW)
  4. HCI LMS STATION 1 — Lake Mary, FL, 32746 (ChargePoint Network · Level 2 · 9.6 kW)
  5. AAA National — Lake Mary, FL, 32746 (Blink Network · Level 2 · 8.6 kW)
  6. IMT LakeMary Apartments — Lake Mary, FL, 32746 (CHARGEUP · Level 2 · 7.6 kW)
  7. Lake Mary Creative- 744 Primera — Lake Mary, FL, 32746 (CHARGEUP · Level 2 · 7.6 kW)
  8. Lake Mary Creative- 730 Primera — Lake Mary, FL, 32746 (CHARGEUP · Level 2 · 7.6 kW)
  9. City of Lake Mary - Trailhead Park — Lake Mary, FL, 32746 (Non-Networked · Level 2 · 7.2 kW)
  10. Piedmont 500 TownPark, LLC — Lake Mary, FL, 32746 (Blink Network · Level 2 · 6.7 kW)
  11. FPL EVOLUTION WESTINLAKEMARY2 — Lake Mary, FL, 32746 (ChargePoint Network · Level 2 · 6.5 kW)
  12. DRAKE MIDTOWN DRAKE MIDTOWN — Lake Mary, FL, 32746 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Florida we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Lake Mary specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 1 DC fast and 15 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Lake Mary, Florida?
There are 16 public electric vehicle charging locations in Lake Mary, Florida, with a combined 49 individual chargers. 1 locations offer DC fast charging and 15 provide Level 2 charging.
What is the largest EV charging network in Lake Mary?
ChargePoint Network operates the most public charging locations in Lake Mary with 8 sites, followed by CHARGEUP with 3 sites.
How much does it cost to install an EV charger in Lake Mary?
Level 2 EV chargers in Lake Mary typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Lake Mary?
Most Lake Mary projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Florida state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Lake Mary?
A typical commercial Level 2 installation in Lake Mary energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Lake Mary take to become profitable?
Payback in Lake Mary depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.