Install EV Chargers in Oviedo, Florida

Install EV chargers or analyze a site in Oviedo, Florida. 12 existing public charging locations (2 DC fast, 10 Level 2). Free 0–100 profitability score on any Oviedo address from EV Data Map by Charge Rigs.

Oviedo, Florida is served by 12 public electric vehicle charging locations operating 38 individual chargers — an average of 3.2 chargers per site. Of those locations, 2 (17%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 10 (83%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Oviedo is ChargePoint Network with 4 locations, followed by CHARGEUP with 3. Average DC fast power across the city is approximately 290 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Oviedo and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Oviedo

Oviedo boasts a competitive landscape for EV charging with 12 public locations serviced by six distinct operators, enhancing choices for drivers. The presence of ChargePoint Network at one-third of these sites fosters a competitive environment that encourages varied pricing and reliability. Notably, Oviedo's two DC fast locations deliver an impressive average power of 290 kW, with the fastest stall reaching 400 kW—placing them at the forefront of charge speed by U.S. standards. This higher power output and diverse network encourage drivers to select stations based on power and amenities, while the remaining Level 2 chargers cater to longer-term charging needs. As the demand for efficient infrastructure grows, understanding this unique mix becomes vital for new operators looking to enter the market.

Oviedo charging by the numbers

Locations
12
Chargers
38
DC Fast locations
2
Level 2 locations
10

DC fast share: 17% of locations. Level 2 share: 83%. Average chargers per site: 3.2. Average DC fast power: 290 kW.

Oviedo charging — local snapshot

Top operator share
ChargePoint Network runs 33% of public locations across 6 networks.
Average DC fast power
290 kW (fastest stall: 400 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
17% DC fast / 83% Level 2 across 12 locations
Estimated DC ports
12 fast-charging ports city-wide

Charging networks in Oviedo

The following operators run public charging in Oviedo, ranked by number of locations.

Featured charging locations in Oviedo

A selection of higher-power public charging locations across Oviedo, sorted by power level.

  1. Oviedo, FL Rechargery Relay - W Mitchell Hammock Rd — Oviedo, FL, 32765 (IONNA · DC Fast · 400 kW)
  2. City of Oviedo - Center Lake — Oviedo, FL, 32765 (EV Connect · DC Fast · 180 kW)
  3. Ellington Oviedo Apartments — Oviedo, FL, 32765 (Blink Network · Level 2 · 10 kW)
  4. Legacy Pointe — Oviedo, FL, 32765 (CHARGEUP · Level 2 · 7.6 kW)
  5. Loc 1 — Oviedo, FL, 32765 (CHARGEUP · Level 2 · 7.6 kW)
  6. Back lot — Oviedo, FL, 32765 (CHARGEUP · Level 2 · 7.6 kW)
  7. Publix #1559 — Oviedo, FL, 33768 (Non-Networked · Level 2 · 7.2 kW)
  8. TRAILSIDE STATION 1 — Oviedo, FL, 32765 (ChargePoint Network · Level 2 · 6.5 kW)
  9. OOTP-01 OOTP RETAIL 1 — Oviedo, FL, 32765 (ChargePoint Network · Level 2 · 6.5 kW)
  10. Central Square Shopping Center — Oviedo, FL, 32765 (Blink Network · Level 2 · 6.2 kW)
  11. LOMA VISTA APAR STATION 1 — Oviedo, FL, 32765 (ChargePoint Network · Level 2 · 3.8 kW)
  12. LOMA VISTA APAR STATION 2 — Oviedo, FL, 32765 (ChargePoint Network · Level 2 · 3.8 kW)

Nearby cities with EV charging coverage

Other cities in Florida we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Oviedo specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 2 DC fast and 10 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Oviedo, Florida?
There are 12 public electric vehicle charging locations in Oviedo, Florida, with a combined 38 individual chargers. 2 locations offer DC fast charging and 10 provide Level 2 charging.
What is the largest EV charging network in Oviedo?
ChargePoint Network operates the most public charging locations in Oviedo with 4 sites, followed by CHARGEUP with 3 sites.
How much does it cost to install an EV charger in Oviedo?
Level 2 EV chargers in Oviedo typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Oviedo?
Most Oviedo projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Florida state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Oviedo?
A typical commercial Level 2 installation in Oviedo energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Oviedo take to become profitable?
Payback in Oviedo depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.