Install EV Chargers in Plantation, Florida

Install EV chargers or analyze a site in Plantation, Florida. 20 existing public charging locations (3 DC fast, 17 Level 2). Free 0–100 profitability score on any Plantation address from EV Data Map by Charge Rigs.

Plantation, Florida is served by 20 public electric vehicle charging locations operating 62 individual chargers — an average of 3.1 chargers per site. Of those locations, 3 (15%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 17 (85%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Plantation is ChargePoint Network with 16 locations, followed by Tesla with 1. Average DC fast power across the city is approximately 247 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Plantation and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Plantation

In Plantation, Florida, the public charging infrastructure is particularly well-served by ChargePoint Network, which operates 80% of the 20 available charging sites, creating a reliable and familiar service for EV drivers. Notably, the city boasts a significant average power output of 247 kW across its three DC fast charging locations, with all sites exceeding 150 kW and the fastest charging at 350 kW. This ultra-fast charging capability positions the area competitively, as new operators seeking to enter the market must consider a substantial power offering to attract users. With 15% of public locations dedicated to DC fast charging and a total of approximately 26 fast charge ports, there is a strategic opportunity to target unmet demand while leveraging the surrounding demographics and traffic patterns for optimal site planning.

Plantation charging by the numbers

Locations
20
Chargers
62
DC Fast locations
3
Level 2 locations
17

DC fast share: 15% of locations. Level 2 share: 85%. Average chargers per site: 3.1. Average DC fast power: 247 kW.

Plantation charging — local snapshot

Top operator share
ChargePoint Network runs 80% of public locations across 5 networks.
Average DC fast power
247 kW (fastest stall: 350 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
15% DC fast / 85% Level 2 across 20 locations
Estimated DC ports
26 fast-charging ports city-wide

Charging networks in Plantation

The following operators run public charging in Plantation, ranked by number of locations.

Featured charging locations in Plantation

A selection of higher-power public charging locations across Plantation, sorted by power level.

  1. Broward Mall (Plantation, FL) — Plantation, FL, 33388 (Electrify America · DC Fast · 350 kW)
  2. Plantation Ford — Plantation, FL, 33317 (FORD_CHARGE · DC Fast · 240 kW)
  3. The Fountains - Tesla Supercharger — Plantation, FL, 33324 (Tesla · DC Fast · 150 kW)
  4. OBE PIXL GARAGE L — Plantation, FL, 33317 (ChargePoint Network · Level 2 · 13.4 kW)
  5. OBE PIXL GARAGE R — Plantation, FL, 33317 (ChargePoint Network · Level 2 · 13.4 kW)
  6. OBE PIXL BLDG 4 — Plantation, FL, 33317 (ChargePoint Network · Level 2 · 13.4 kW)
  7. Covenant Living of Florida — Plantation, FL, 33324 (AMPUP · Level 2 · 7.2 kW)
  8. OBE PLAN POINTE M L — Plantation, FL, 33313 (ChargePoint Network · Level 2 · 6.5 kW)
  9. CORNERSTONE1 CHARGER #2 — Plantation, FL, 33324 (ChargePoint Network · Level 2 · 6.5 kW)
  10. OBE PLAN POINTE M R — Plantation, FL, 33324 (ChargePoint Network · Level 2 · 6.5 kW)
  11. PLANTATION CORP STATION 3 — Plantation, FL, 33324 (ChargePoint Network · Level 2 · 6.5 kW)
  12. BHE PLANTATION MOB4 — Plantation, FL, 33324 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Florida we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Plantation specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 3 DC fast and 17 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Plantation, Florida?
There are 20 public electric vehicle charging locations in Plantation, Florida, with a combined 62 individual chargers. 3 locations offer DC fast charging and 17 provide Level 2 charging.
What is the largest EV charging network in Plantation?
ChargePoint Network operates the most public charging locations in Plantation with 16 sites, followed by Tesla with 1 sites.
How much does it cost to install an EV charger in Plantation?
Level 2 EV chargers in Plantation typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Plantation?
Most Plantation projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Florida state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Plantation?
A typical commercial Level 2 installation in Plantation energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Plantation take to become profitable?
Payback in Plantation depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.