Install EV Chargers in St. Augustine, Florida

Install EV chargers or analyze a site in St. Augustine, Florida. 41 existing public charging locations (16 DC fast, 25 Level 2). Free 0–100 profitability score on any St. Augustine address from EV Data Map by Charge Rigs.

St. Augustine, Florida is served by 41 public electric vehicle charging locations operating 157 individual chargers — an average of 3.8 chargers per site. Of those locations, 16 (39%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 25 (61%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in St. Augustine is ChargePoint Network with 10 locations, followed by Tesla Destination with 9. Average DC fast power across the city is approximately 276 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in St. Augustine and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in St. Augustine

St. Augustine's public EV charging landscape stands out with a competitive mix of 41 locations operated by 10 distinct networks, including the leading ChargePoint Network. The city boasts a significant 39% share of DC fast charging stations, averaging a robust 276 kW per station, with the fastest reaching 400 kW. This high-power offering, where 88% of fast charging sites exceed 150 kW, provides drivers with top-tier charging options, crucial for optimizing their travel plans. Additionally, the diverse operator landscape encourages competitive pricing and uptime, allowing drivers to select stations based on power and amenities rather than being confined to a single network. The combination of these factors makes St. Augustine an appealing destination for EV drivers seeking reliable and efficient charging solutions.

St. Augustine charging by the numbers

Locations
41
Chargers
157
DC Fast locations
16
Level 2 locations
25

DC fast share: 39% of locations. Level 2 share: 61%. Average chargers per site: 3.8. Average DC fast power: 276 kW.

St. Augustine charging — local snapshot

Top operator share
ChargePoint Network runs 24% of public locations across 10 networks.
Average DC fast power
276 kW (fastest stall: 400 kW)
High-power share
88% of DC fast sites are 150 kW-class or higher
Mix
39% DC fast / 61% Level 2 across 41 locations
Estimated DC ports
89 fast-charging ports city-wide

Charging networks in St. Augustine

The following operators run public charging in St. Augustine, ranked by number of locations.

Featured charging locations in St. Augustine

A selection of higher-power public charging locations across St. Augustine, sorted by power level.

  1. MB BUCEES ST. AUGUST 3-4 — St. Augustine, FL, 32092 (MERCEDES_BENZ · DC Fast · 400 kW)
  2. MB BUCEES ST. AUGUST 5-6 — St. Augustine, FL, 32092 (MERCEDES_BENZ · DC Fast · 400 kW)
  3. MB BUCEES ST. AUGUST 9-10 — St. Augustine, FL, 32092 (MERCEDES_BENZ · DC Fast · 400 kW)
  4. Riverside Center — St Augustine, FL, 32086 (FPLEV · DC Fast · 400 kW)
  5. MB BUCEES ST. AUGUST 7-8 — St. Augustine, FL, 32092 (MERCEDES_BENZ · DC Fast · 400 kW)
  6. MB BUCEES ST. AUGUST 1-2 — St. Augustine, FL, 32092 (MERCEDES_BENZ · DC Fast · 400 kW)
  7. Flying J 626 — St. Augustine, FL, 32086 (eVgo Network · DC Fast · 350 kW)
  8. Cracker Barrel - Tesla Supercharger — St. Augustine, FL, 32092 (Tesla · DC Fast · 325 kW)
  9. Buc-Ee's - Tesla Supercharger — St. Augustine, FL, 32092 (Tesla · DC Fast · 250 kW)
  10. Wawa - Tesla Supercharger — St. Augustine, FL, 32084 (Tesla · DC Fast · 250 kW)
  11. FPL EVolution - Holiday Inn — St Augustine, FL, 32084 (FPLEV · DC Fast · 240 kW)
  12. Gateway Village — St Augustine, FL, 32095 (FPLEV · DC Fast · 180 kW)

Nearby cities with EV charging coverage

Other cities in Florida we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For St. Augustine specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 16 DC fast and 25 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in St. Augustine, Florida?
There are 41 public electric vehicle charging locations in St. Augustine, Florida, with a combined 157 individual chargers. 16 locations offer DC fast charging and 25 provide Level 2 charging.
What is the largest EV charging network in St. Augustine?
ChargePoint Network operates the most public charging locations in St. Augustine with 10 sites, followed by Tesla Destination with 9 sites.
How much does it cost to install an EV charger in St. Augustine?
Level 2 EV chargers in St. Augustine typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in St. Augustine?
Most St. Augustine projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Florida state, utility and NEVI-funded programs.
How long does it take to install an EV charger in St. Augustine?
A typical commercial Level 2 installation in St. Augustine energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in St. Augustine take to become profitable?
Payback in St. Augustine depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage