Install EV Chargers in Tavares, Florida

Install EV chargers or analyze a site in Tavares, Florida. 10 existing public charging locations (3 DC fast, 7 Level 2). Free 0–100 profitability score on any Tavares address from EV Data Map by Charge Rigs.

Tavares, Florida is served by 10 public electric vehicle charging locations operating 17 individual chargers — an average of 1.7 chargers per site. Of those locations, 3 (30%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 7 (70%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Tavares is ChargePoint Network with 6 locations, followed by CHARGEUP with 3. Average DC fast power across the city is approximately 227 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Tavares and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Tavares

Tavares, Florida presents a unique landscape for EV charging, with 30% of its 10 public locations offering ultra-fast DC charging at an impressive average of 227 kW—boosting driver confidence with a top stall reaching 250 kW. This expedited charging capability positions Tavares competitively, especially with all DC fast stations classified at 150 kW or higher. The dominance of ChargePoint Network, operating 60% of the cities' charging sites, underscores the importance of network reliability in this market. For developers, strategically targeting gaps within this infrastructure, particularly with high-output stalls, could attract EV drivers looking for rapid and dependable charging solutions.

Tavares charging by the numbers

Locations
10
Chargers
17
DC Fast locations
3
Level 2 locations
7

DC fast share: 30% of locations. Level 2 share: 70%. Average chargers per site: 1.7. Average DC fast power: 227 kW.

Tavares charging — local snapshot

Top operator share
ChargePoint Network runs 60% of public locations across 3 networks.
Average DC fast power
227 kW (fastest stall: 250 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
30% DC fast / 70% Level 2 across 10 locations
Estimated DC ports
4 fast-charging ports city-wide

Charging networks in Tavares

The following operators run public charging in Tavares, ranked by number of locations.

Featured charging locations in Tavares

A selection of higher-power public charging locations across Tavares, sorted by power level.

  1. OS MANAGED ADVENTWTRMANDC3 — Tavares, FL, 32778 (ChargePoint Network · DC Fast · 250 kW)
  2. OS MANAGED ADVENTWTRMANDC2 — Tavares, FL, 32778 (ChargePoint Network · DC Fast · 250 kW)
  3. Tavares Parking Garage — Tavares, FL, 32778 (EV Connect · DC Fast · 180 kW)
  4. Atwater Apartments — Tavares, FL, 32778 (CHARGEUP · Level 2 · 19.2 kW)
  5. OS MANAGED ADVENTWATERMAN6 — Tavares, FL, 32778 (ChargePoint Network · Level 2 · 11.5 kW)
  6. OS MANAGED ADVENTWATERMAN5 — Tavares, FL, 32778 (ChargePoint Network · Level 2 · 11.5 kW)
  7. OS MANAGED ADVENTWATERMAN1 — Tavares, FL, 32778 (ChargePoint Network · Level 2 · 11.5 kW)
  8. OS MANAGED ADVENTWATERMAN4 — Tavares, FL, 32778 (ChargePoint Network · Level 2 · 11.5 kW)
  9. City Hall — Tavares, FL, 32778 (CHARGEUP · Level 2 · 7.6 kW)
  10. Train Platform — Tavares, FL, 32778 (CHARGEUP · Level 2 · 7.6 kW)

Nearby cities with EV charging coverage

Other cities in Florida we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Tavares specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 3 DC fast and 7 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Tavares, Florida?
There are 10 public electric vehicle charging locations in Tavares, Florida, with a combined 17 individual chargers. 3 locations offer DC fast charging and 7 provide Level 2 charging.
What is the largest EV charging network in Tavares?
ChargePoint Network operates the most public charging locations in Tavares with 6 sites, followed by CHARGEUP with 3 sites.
How much does it cost to install an EV charger in Tavares?
Level 2 EV chargers in Tavares typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Tavares?
Most Tavares projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Florida state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Tavares?
A typical commercial Level 2 installation in Tavares energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Tavares take to become profitable?
Payback in Tavares depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage