Install EV Chargers in Gainesville, Georgia

Install EV chargers or analyze a site in Gainesville, Georgia. 19 existing public charging locations (5 DC fast, 14 Level 2). Free 0–100 profitability score on any Gainesville address from EV Data Map by Charge Rigs.

Gainesville, Georgia is served by 19 public electric vehicle charging locations operating 50 individual chargers — an average of 2.6 chargers per site. Of those locations, 5 (26%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 14 (74%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Gainesville is ChargePoint Network with 10 locations, followed by Non-Networked with 3. Average DC fast power across the city is approximately 101 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Gainesville and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Gainesville

Gainesville boasts a diverse public charging market with 19 locations split among six distinct operators, ensuring competitive pricing and uptime. Leading the charge is ChargePoint Network, which controls over half of the sites, allowing drivers to choose based on power and amenities rather than brand loyalty. While 26% of the charging locations are DC fast, with an average output of 105 kW and a peak at 250 kW, the presence of 20% of fast sites classified as 150 kW or higher positions Gainesville as a growing player in mid-power charging. This unique blend of options, complemented by 21 accessible DC fast ports, highlights the city's potential for enhanced EV infrastructure development that aligns with evolving driver needs.

Gainesville charging by the numbers

Locations
19
Chargers
50
DC Fast locations
5
Level 2 locations
14

DC fast share: 26% of locations. Level 2 share: 74%. Average chargers per site: 2.6. Average DC fast power: 101 kW.

Gainesville charging — local snapshot

Top operator share
ChargePoint Network runs 53% of public locations across 6 networks.
Average DC fast power
101 kW (fastest stall: 250 kW)
High-power share
20% of DC fast sites are 150 kW-class or higher
Mix
26% DC fast / 74% Level 2 across 19 locations
Estimated DC ports
21 fast-charging ports city-wide

Charging networks in Gainesville

The following operators run public charging in Gainesville, ranked by number of locations.

Featured charging locations in Gainesville

A selection of higher-power public charging locations across Gainesville, sorted by power level.

  1. New Holland Market - Tesla Supercharger — Gainesville, GA, 30501 (Tesla · DC Fast · 250 kW)
  2. KRAUSE HYUNDAI POWER LINK — Gainesville, GA, 30507 (ChargePoint Network · DC Fast · 120 kW)
  3. JACKSON EMC GAINESVILLE — Gainesville, GA, 30501 (ChargePoint Network · DC Fast · 50 kW)
  4. Carriage Nissan — Gainesville, GA, 30504 (Non-Networked · DC Fast · 44 kW)
  5. GEORGIA POWER GAINESVILLE DC — Gainesville, GA, 30501 (ChargePoint Network · DC Fast · 40 kW)
  6. Indigo Energy Medical Arts- Parking Deck — Gainesville, GA, 30501 (Blink Network · Level 2 · 21.6 kW)
  7. NEW FT SLOT 1 NC LVL 2 — Gainesville, GA, 30504 (ChargePoint Network · Level 2 · 19.2 kW)
  8. Hunt Tower — Gainesville, GA, 30501 (RED_E · Level 2 · 19.2 kW)
  9. Gainesville — Gainesville, GA, 30504 (Blink Network · Level 2 · 11.5 kW)
  10. NoFo Brew Gainesville — Gainesville, GA, 30501 (AUTEL · Level 2 · 10 kW)
  11. Courtyard-Marriott Gainesville — Gainesville, GA, 30501 (AUTEL · Level 2 · 10 kW)
  12. Kroger — Gainesville, GA, 30501 (Non-Networked · Level 2 · 7.2 kW)

Nearby cities with EV charging coverage

Other cities in Georgia we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Gainesville specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 5 DC fast and 14 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Gainesville, Georgia?
There are 19 public electric vehicle charging locations in Gainesville, Georgia, with a combined 50 individual chargers. 5 locations offer DC fast charging and 14 provide Level 2 charging.
What is the largest EV charging network in Gainesville?
ChargePoint Network operates the most public charging locations in Gainesville with 10 sites, followed by Non-Networked with 3 sites.
How much does it cost to install an EV charger in Gainesville?
Level 2 EV chargers in Gainesville typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Gainesville?
Most Gainesville projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Georgia state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Gainesville?
A typical commercial Level 2 installation in Gainesville energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Gainesville take to become profitable?
Payback in Gainesville depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.