Install EV chargers or analyze a site in Macon, Georgia. 32 existing public charging locations (13 DC fast, 19 Level 2). Free 0–100 profitability score on any Macon address from EV Data Map by Charge Rigs.
Macon, Georgia is served by 32 public electric vehicle charging locations operating 86 individual chargers — an average of 2.7 chargers per site. Of those locations, 13 (41%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 19 (59%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Macon is ChargePoint Network with 16 locations, followed by Non-Networked with 4. Average DC fast power across the city is approximately 154 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Macon and receive an instant ROI score, demand projection, and recommended charger configuration.
Macon, Georgia, stands out in the public EV charging landscape with its competitive mix of 32 charging locations shared among 10 distinct operators, including ChargePoint Network, which dominates with 50% of the sites. The city’s offerings include 13 DC fast charging stations, averaging a robust 154 kW, and boasting a maximum power stall of 300 kW, positioning it favorably in terms of charging efficiency. Notably, 62% of these fast stations are classified at 150 kW or higher, catering to drivers who prioritize power in their charging decisions. This diverse operator ecosystem not only enhances pricing and uptime competition but also encourages users to choose based on specific power needs and amenities, underscoring the intricacies of the local charging landscape.
DC fast share: 41% of locations. Level 2 share: 59%. Average chargers per site: 2.7. Average DC fast power: 154 kW.
The following operators run public charging in Macon, ranked by number of locations.
A selection of higher-power public charging locations across Macon, sorted by power level.
Other cities in Georgia we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Macon specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 13 DC fast and 19 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.