Install EV Chargers in Pooler, Georgia

Install EV chargers or analyze a site in Pooler, Georgia. 17 existing public charging locations (7 DC fast, 10 Level 2). Free 0–100 profitability score on any Pooler address from EV Data Map by Charge Rigs.

Pooler, Georgia is served by 17 public electric vehicle charging locations operating 79 individual chargers — an average of 4.6 chargers per site. Of those locations, 7 (41%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 10 (59%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Pooler is ChargePoint Network with 7 locations, followed by Tesla with 3. Average DC fast power across the city is approximately 224 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Pooler and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Pooler

Pooler, Georgia, boasts a robust public charging landscape with 16 charging locations served by 8 distinct networks, creating a competitive environment for both pricing and uptime. ChargePoint Network leads with 44% of the sites, but the presence of multiple operators allows drivers to prioritize power and amenities when selecting a charger. Notably, 44% of these locations are DC fast chargers, averaging an impressive 224 kW, with the fastest option reaching 350 kW. This ultra-fast capability, coupled with the fact that 71% of DC fast locations are at least 150 kW, positions Pooler as a prime destination for EV drivers seeking quick, efficient charging solutions. EV Data Map can help site developers identify gaps in this dynamic market to ensure optimal placement of new charging infrastructure.

Pooler charging by the numbers

Locations
17
Chargers
79
DC Fast locations
7
Level 2 locations
10

DC fast share: 41% of locations. Level 2 share: 59%. Average chargers per site: 4.6. Average DC fast power: 224 kW.

Pooler charging — local snapshot

Top operator share
ChargePoint Network runs 41% of public locations across 8 networks.
Average DC fast power
224 kW (fastest stall: 350 kW)
High-power share
71% of DC fast sites are 150 kW-class or higher
Mix
41% DC fast / 59% Level 2 across 17 locations
Estimated DC ports
44 fast-charging ports city-wide

Charging networks in Pooler

The following operators run public charging in Pooler, ranked by number of locations.

Featured charging locations in Pooler

A selection of higher-power public charging locations across Pooler, sorted by power level.

  1. Walmart 2860 (Pooler, GA) — Pooler, GA, 31322 (Electrify America · DC Fast · 350 kW)
  2. Pooler, GA — Pooler, GA, 31322 (RIVIAN_ADVENTURE · DC Fast · 300 kW)
  3. Parker's Kitchen - Tesla Supercharger — Pooler, GA, 31322 (Tesla · DC Fast · 250 kW)
  4. Dairy Queen - Tesla Supercharger — Pooler, GA, 31322 (Tesla · DC Fast · 250 kW)
  5. Enmarket - Tesla Supercharger — Pooler, GA, 31322 (Tesla · DC Fast · 250 kW)
  6. JC Lewis Ford Pooler GA — Pooler, GA, 31322 (RED_E · DC Fast · 120 kW)
  7. NOURIA POOLER DC — Pooler, GA, 31322 (ChargePoint Network · DC Fast · 50 kW)
  8. Botanic Luxury Apartments — Pooler, GA, 31322 (Blink Network · Level 2 · 21.6 kW)
  9. A&M EMBASSY 3 — Pooler, GA, 31322 (ChargePoint Network · Level 2 · 19.2 kW)
  10. A&M HOMEWOOD 2 — Pooler, GA, 31322 (ChargePoint Network · Level 2 · 19.2 kW)
  11. A&M HOMEWOOD 3 — Pooler, GA, 31322 (ChargePoint Network · Level 2 · 19.2 kW)
  12. A&M EMBASSY 1 — Pooler, GA, 31322 (ChargePoint Network · Level 2 · 12 kW)

Nearby cities with EV charging coverage

Other cities in Georgia we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Pooler specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 7 DC fast and 10 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Pooler, Georgia?
There are 17 public electric vehicle charging locations in Pooler, Georgia, with a combined 79 individual chargers. 7 locations offer DC fast charging and 10 provide Level 2 charging.
What is the largest EV charging network in Pooler?
ChargePoint Network operates the most public charging locations in Pooler with 7 sites, followed by Tesla with 3 sites.
How much does it cost to install an EV charger in Pooler?
Level 2 EV chargers in Pooler typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Pooler?
Most Pooler projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Georgia state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Pooler?
A typical commercial Level 2 installation in Pooler energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Pooler take to become profitable?
Payback in Pooler depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.