Install EV chargers or analyze a site in Augusta, Georgia. 42 existing public charging locations (9 DC fast, 33 Level 2). Free 0–100 profitability score on any Augusta address from EV Data Map by Charge Rigs.
Augusta, Georgia is served by 42 public electric vehicle charging locations operating 144 individual chargers — an average of 3.4 chargers per site. Of those locations, 9 (21%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 33 (79%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Augusta is ChargePoint Network with 25 locations, followed by Tesla Destination with 6. Average DC fast power across the city is approximately 204 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Augusta and receive an instant ROI score, demand projection, and recommended charger configuration.
Augusta, Georgia presents a unique landscape for EV charging, dominated by the ChargePoint Network, which operates 60% of the city's 42 public locations. This concentration underscores the importance of network reliability and uptime, particularly given that 67% of the nine DC fast charging sites are rated at 150 kW or higher, with an impressive average power of 204 kW. The fastest stall reaches 400 kW, positioning Augusta's charging infrastructure at the forefront of fast charging options in the region. With approximately 65 DC fast ports available, operators looking to enter this market should consider the local demand dynamics and the potential for high-power offerings to attract EV drivers.
DC fast share: 21% of locations. Level 2 share: 79%. Average chargers per site: 3.4. Average DC fast power: 204 kW.
The following operators run public charging in Augusta, ranked by number of locations.
A selection of higher-power public charging locations across Augusta, sorted by power level.
Other cities in Georgia we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Augusta specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 9 DC fast and 33 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.