Install EV Chargers in Augusta, Georgia

Install EV chargers or analyze a site in Augusta, Georgia. 42 existing public charging locations (9 DC fast, 33 Level 2). Free 0–100 profitability score on any Augusta address from EV Data Map by Charge Rigs.

Augusta, Georgia is served by 42 public electric vehicle charging locations operating 144 individual chargers — an average of 3.4 chargers per site. Of those locations, 9 (21%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 33 (79%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Augusta is ChargePoint Network with 25 locations, followed by Tesla Destination with 6. Average DC fast power across the city is approximately 204 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Augusta and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Augusta

Public EV charging in Augusta, Georgia, offers a compelling landscape for site developers, primarily influenced by ChargePoint Network, which operates 60% of the city's 42 public charging locations. The presence of 9 DC fast charging sites, averaging 204 kW per stall, and featuring ultra-fast options up to 400 kW, positions Augusta as a city with robust fast-charging capabilities. Notably, 67% of these DC fast stations are rated at 150 kW or higher, enhancing the attractiveness for EV drivers. This concentrated network means that new operators must consider both reliability and competition against an established player while also noting that 21% of the locations are DC fast, addressing both quick refueling needs and longer-charging Level 2 options.

Augusta charging by the numbers

Locations
42
Chargers
144
DC Fast locations
9
Level 2 locations
33

DC fast share: 21% of locations. Level 2 share: 79%. Average chargers per site: 3.4. Average DC fast power: 204 kW.

Augusta charging — local snapshot

Top operator share
ChargePoint Network runs 60% of public locations across 9 networks.
Average DC fast power
204 kW (fastest stall: 400 kW)
High-power share
67% of DC fast sites are 150 kW-class or higher
Mix
21% DC fast / 79% Level 2 across 42 locations
Estimated DC ports
65 fast-charging ports city-wide

Charging networks in Augusta

The following operators run public charging in Augusta, ranked by number of locations.

Featured charging locations in Augusta

A selection of higher-power public charging locations across Augusta, sorted by power level.

  1. Crane Creek Shopping Center MB.HPC — Augusta, GA, 30907 (MERCEDES_BENZ · DC Fast · 400 kW)
  2. Target - Tesla Supercharger — Augusta, GA, 30909 (Tesla · DC Fast · 325 kW)
  3. Exxon - Tesla Supercharger — Augusta, GA, 30909 (Tesla · DC Fast · 325 kW)
  4. Augusta, GA — Augusta, GA, 30907 (RIVIAN_ADVENTURE · DC Fast · 300 kW)
  5. Sheraton Augusta Hotel - Tesla Supercharger — Augusta, GA, 30907 (Tesla · DC Fast · 150 kW)
  6. Steak 'n Shake - Tesla Supercharger — Augusta, GA, 30909 (Tesla · DC Fast · 150 kW)
  7. MB OF AUGUSTA. CPE250-1 — Augusta, GA, 30907 (ChargePoint Network · DC Fast · 62.5 kW)
  8. GEORGIA POWER AUGUST DC KROGR — Augusta, GA, 30909 (ChargePoint Network · DC Fast · 62.5 kW)
  9. TAYLOR H HYUNDAI LEVEL 3 — Augusta, GA, 30907 (ChargePoint Network · DC Fast · 62.5 kW)
  10. TAYLOR BMW TAYLOR BMW 2 — Augusta, GA, 30907 (ChargePoint Network · Level 2 · 12 kW)
  11. TAYLOR BMW TAYLOR BMW 1 — Augusta, GA, 30907 (ChargePoint Network · Level 2 · 12 kW)
  12. Best Buy — Augusta, GA, 30909 (LOOP · Level 2 · 7.7 kW)

Nearby cities with EV charging coverage

Other cities in Georgia we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Augusta specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 9 DC fast and 33 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Augusta, Georgia?
There are 42 public electric vehicle charging locations in Augusta, Georgia, with a combined 144 individual chargers. 9 locations offer DC fast charging and 33 provide Level 2 charging.
What is the largest EV charging network in Augusta?
ChargePoint Network operates the most public charging locations in Augusta with 25 sites, followed by Tesla Destination with 6 sites.
How much does it cost to install an EV charger in Augusta?
Level 2 EV chargers in Augusta typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Augusta?
Most Augusta projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Georgia state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Augusta?
A typical commercial Level 2 installation in Augusta energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Augusta take to become profitable?
Payback in Augusta depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage