Install EV Chargers in Roswell, Georgia

Install EV chargers or analyze a site in Roswell, Georgia. 21 existing public charging locations (4 DC fast, 17 Level 2). Free 0–100 profitability score on any Roswell address from EV Data Map by Charge Rigs.

Roswell, Georgia is served by 21 public electric vehicle charging locations operating 65 individual chargers — an average of 3.1 chargers per site. Of those locations, 4 (19%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 17 (81%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Roswell is ChargePoint Network with 9 locations, followed by Blink Network with 2. Average DC fast power across the city is approximately 263 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Roswell and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Roswell

Roswell boasts a robust and varied public charging infrastructure, featuring 21 locations from nine distinct operators, with ChargePoint Network leading at 43% of sites. This diversity enhances competition, allowing drivers to choose charging options based on power and amenities rather than being tied to a single provider. Notably, the city's four DC fast charging stations average an impressive 263 kW, with the fastest capable of delivering 400 kW. With 75% of fast sites exceeding 150 kW, Roswell offers ultra-fast charging by national standards, catering to the demands of modern EV drivers. Additionally, the combination of DC fast and Level 2 stations creates a comprehensive network that addresses both quick top-ups and longer-dwelling charging needs, making it an attractive destination for EV users in Georgia.

Roswell charging by the numbers

Locations
21
Chargers
65
DC Fast locations
4
Level 2 locations
17

DC fast share: 19% of locations. Level 2 share: 81%. Average chargers per site: 3.1. Average DC fast power: 263 kW.

Roswell charging — local snapshot

Top operator share
ChargePoint Network runs 43% of public locations across 9 networks.
Average DC fast power
263 kW (fastest stall: 400 kW)
High-power share
75% of DC fast sites are 150 kW-class or higher
Mix
19% DC fast / 81% Level 2 across 21 locations
Estimated DC ports
27 fast-charging ports city-wide

Charging networks in Roswell

The following operators run public charging in Roswell, ranked by number of locations.

Featured charging locations in Roswell

A selection of higher-power public charging locations across Roswell, sorted by power level.

  1. Roswell Crossing MB.HPC — Roswell, GA, 30075 (MERCEDES_BENZ · DC Fast · 400 kW)
  2. Site Centers Sandy Plains Village (Roswell, GA) — Roswell, GA, 30075 (Electrify America · DC Fast · 350 kW)
  3. Connexion - Tesla Supercharger — Roswell, GA, 30076 (Tesla · DC Fast · 250 kW)
  4. Regal Nissan — Roswell, GA, 30076 (Non-Networked · DC Fast · 50 kW)
  5. GM - Carl Black Buick — Roswell, GA, 30076 (EV Connect · Level 2 · 19.2 kW)
  6. Jackson AC Roswell — Roswell, GA, 30076 (Blink Network · Level 2 · 10.8 kW)
  7. CP6000 STATION 1 — Roswell, GA, 30076 (ChargePoint Network · Level 2 · 7.7 kW)
  8. Roswell Depot — Roswell, GA, 30075 (EV Connect · Level 2 · 7.4 kW)
  9. DoubleTree by Hilton Hotel Atlanta - Roswell - Tesla Destination — Roswell, GA, 30076 (Tesla Destination · Level 2 · 7.2 kW)
  10. Roswell Mitsubishi — Roswell, GA, 30076 (Non-Networked · Level 2 · 7.2 kW)
  11. Gazal Eyecare - Tesla Destination — Roswell, GA, 30075 (Tesla Destination · Level 2 · 7.2 kW)
  12. Walton Centennial — Roswell, GA, 30076 (Blink Network · Level 2 · 6.7 kW)

Nearby cities with EV charging coverage

Other cities in Georgia we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Roswell specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 4 DC fast and 17 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Roswell, Georgia?
There are 21 public electric vehicle charging locations in Roswell, Georgia, with a combined 65 individual chargers. 4 locations offer DC fast charging and 17 provide Level 2 charging.
What is the largest EV charging network in Roswell?
ChargePoint Network operates the most public charging locations in Roswell with 9 sites, followed by Blink Network with 2 sites.
How much does it cost to install an EV charger in Roswell?
Level 2 EV chargers in Roswell typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Roswell?
Most Roswell projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Georgia state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Roswell?
A typical commercial Level 2 installation in Roswell energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Roswell take to become profitable?
Payback in Roswell depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.