Install EV Chargers in Dunwoody, Georgia

Install EV chargers or analyze a site in Dunwoody, Georgia. 24 existing public charging locations (0 DC fast, 24 Level 2). Free 0–100 profitability score on any Dunwoody address from EV Data Map by Charge Rigs.

Dunwoody, Georgia is served by 24 public electric vehicle charging locations operating 75 individual chargers — an average of 3.1 chargers per site. Of those locations, 0 (0%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 24 (100%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Dunwoody is ChargePoint Network with 19 locations, followed by ENVIROSPARK with 5. Average DC fast power across the city is approximately 0 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Dunwoody and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Dunwoody

Dunwoody, Georgia, presents a unique opportunity for EV charging infrastructure development, primarily due to its reliance on Level 2 charging with no existing DC fast chargers. With all 24 public locations dominated by the ChargePoint Network, which covers 79% of the sites, developers can leverage this concentration while also addressing a significant gap: the absence of fast-charging options. As local EV drivers face a lack of quick top-up solutions, there's potential for healthy demand growth for DC fast chargers, and strategically filling this void could attract users from neighboring areas. Analyzing EV Data Map insights further reveals where expansion can meet the needs of both current and future EV owners in this growing market.

Dunwoody charging by the numbers

Locations
24
Chargers
75
DC Fast locations
0
Level 2 locations
24

DC fast share: 0% of locations. Level 2 share: 100%. Average chargers per site: 3.1. Average DC fast power: 0 kW.

Dunwoody charging — local snapshot

Top operator share
ChargePoint Network runs 79% of public locations across 2 networks.
Mix
0% DC fast / 100% Level 2 across 24 locations

Charging networks in Dunwoody

The following operators run public charging in Dunwoody, ranked by number of locations.

Featured charging locations in Dunwoody

A selection of higher-power public charging locations across Dunwoody, sorted by power level.

  1. Dunwoody - Nature Center — Dunwoody, GA, 30338 (ENVIROSPARK · Level 2 · 6.7 kW)
  2. Pernoshal Park (Dunwoody) — Dunwoody, GA, 30338 (ENVIROSPARK · Level 2 · 6.7 kW)
  3. Brookrun Park (Dunwoody) — Dunwoody, GA, 30338 (ENVIROSPARK · Level 2 · 6.7 kW)
  4. Spruill Arts Center (Dunwoody) — Dunwoody, GA, 30338 (ENVIROSPARK · Level 2 · 6.7 kW)
  5. City Hall (Dunwoody) — Dunwoody, GA, 30338 (ENVIROSPARK · Level 2 · 6.7 kW)
  6. ELEMENTDUNWOODY ELEMENT 1 — Dunwoody, GA, 30346 (ChargePoint Network · Level 2 · 6.5 kW)
  7. TWELVE24 STATION 8 — Dunwoody, GA, 30346 (ChargePoint Network · Level 2 · 6.5 kW)
  8. LETS CHARGE NOTTING HILL 1 — Dunwoody, GA, 30346 (ChargePoint Network · Level 2 · 6.5 kW)
  9. LETS CHARGE NOTTING HILL-2 — Dunwoody, GA, 30346 (ChargePoint Network · Level 2 · 6.5 kW)
  10. TWELVE24 STATION 6 — Dunwoody, GA, 30346 (ChargePoint Network · Level 2 · 6.5 kW)
  11. CAMPUS 244 DECK EV 1 — Dunwoody, GA, 30346 (ChargePoint Network · Level 2 · 6.5 kW)
  12. CAMPUS 244 DECK EV 5 — Dunwoody, GA, 30346 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Georgia we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Dunwoody specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 0 DC fast and 24 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Dunwoody, Georgia?
There are 24 public electric vehicle charging locations in Dunwoody, Georgia, with a combined 75 individual chargers. 0 locations offer DC fast charging and 24 provide Level 2 charging.
What is the largest EV charging network in Dunwoody?
ChargePoint Network operates the most public charging locations in Dunwoody with 19 sites, followed by ENVIROSPARK with 5 sites.
How much does it cost to install an EV charger in Dunwoody?
Level 2 EV chargers in Dunwoody typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Dunwoody?
Most Dunwoody projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Georgia state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Dunwoody?
A typical commercial Level 2 installation in Dunwoody energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Dunwoody take to become profitable?
Payback in Dunwoody depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage