Install EV Chargers in Valdosta, Georgia

Install EV chargers or analyze a site in Valdosta, Georgia. 22 existing public charging locations (5 DC fast, 17 Level 2). Free 0–100 profitability score on any Valdosta address from EV Data Map by Charge Rigs.

Valdosta, Georgia is served by 22 public electric vehicle charging locations operating 77 individual chargers — an average of 3.5 chargers per site. Of those locations, 5 (23%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 17 (77%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Valdosta is ChargePoint Network with 9 locations, followed by Tesla Destination with 4. Average DC fast power across the city is approximately 249 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Valdosta and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Valdosta

Valdosta stands out in Georgia's EV charging landscape with a competitive network of 22 public charging locations operated by nine distinct networks, fostering a diverse charging ecosystem. ChargePoint Network leads with 41% of the sites, providing drivers with choices tailored to their charging needs. The city's five DC fast charging locations not only average a potent 249 kW but also feature ultra-fast options, with 80% of these sites rated at 150 kW or higher, ensuring rapid recharging for travelers. This high-performance infrastructure encourages strategic site selection based on power and amenities, making Valdosta an attractive pit stop for EV drivers who prioritize efficient charging solutions during their journeys across the region.

Valdosta charging by the numbers

Locations
22
Chargers
77
DC Fast locations
5
Level 2 locations
17

DC fast share: 23% of locations. Level 2 share: 77%. Average chargers per site: 3.5. Average DC fast power: 249 kW.

Valdosta charging — local snapshot

Top operator share
ChargePoint Network runs 41% of public locations across 9 networks.
Average DC fast power
249 kW (fastest stall: 400 kW)
High-power share
80% of DC fast sites are 150 kW-class or higher
Mix
23% DC fast / 77% Level 2 across 22 locations
Estimated DC ports
27 fast-charging ports city-wide

Charging networks in Valdosta

The following operators run public charging in Valdosta, ranked by number of locations.

Featured charging locations in Valdosta

A selection of higher-power public charging locations across Valdosta, sorted by power level.

  1. Valdosta, GA Rechargery Relay - Norman Dr — Valdosta, GA, 31601 (IONNA · DC Fast · 400 kW)
  2. Walmart 899 (Valdosta, GA) — Valdosta, GA, 31601 (Electrify America · DC Fast · 350 kW)
  3. SunStop / Inland - Tesla Supercharger — Valdosta, GA, 31601 (Tesla · DC Fast · 250 kW)
  4. CircleK - Valdosta, GA — Valdosta, GA, 31601 (CIRCLE_K · DC Fast · 180 kW)
  5. GEORGIA POWER LOWNDES DC — Valdosta, GA, 31601 (ChargePoint Network · DC Fast · 62.5 kW)
  6. Staten Crossing Apts — Valdosta, GA, 31605 (Blink Network · Level 2 · 17.3 kW)
  7. MOTMANCO COURTYARD 3 — Valdosta, GA, 31602 (ChargePoint Network · Level 2 · 9.6 kW)
  8. MOTMANCO COURTYARD 2 — Valdosta, GA, 31602 (ChargePoint Network · Level 2 · 9.6 kW)
  9. HILTON GRDN INN HILTON GARDEN 3 — Valdosta, GA, 31601 (ChargePoint Network · Level 2 · 9.6 kW)
  10. MOTMANCO COURTYARD 1 — Valdosta, GA, 31602 (ChargePoint Network · Level 2 · 9.6 kW)
  11. HILTON GRDN INN HILTON GARDEN I — Valdosta, GA, 31601 (ChargePoint Network · Level 2 · 9.6 kW)
  12. HILTON GRDN INN HILTON GARDEN 2 — Valdosta, GA, 31601 (ChargePoint Network · Level 2 · 9.6 kW)

Nearby cities with EV charging coverage

Other cities in Georgia we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Valdosta specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 5 DC fast and 17 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Valdosta, Georgia?
There are 22 public electric vehicle charging locations in Valdosta, Georgia, with a combined 77 individual chargers. 5 locations offer DC fast charging and 17 provide Level 2 charging.
What is the largest EV charging network in Valdosta?
ChargePoint Network operates the most public charging locations in Valdosta with 9 sites, followed by Tesla Destination with 4 sites.
How much does it cost to install an EV charger in Valdosta?
Level 2 EV chargers in Valdosta typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Valdosta?
Most Valdosta projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Georgia state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Valdosta?
A typical commercial Level 2 installation in Valdosta energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Valdosta take to become profitable?
Payback in Valdosta depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage