Install EV Chargers in Barrington, Illinois

Install EV chargers or analyze a site in Barrington, Illinois. 16 existing public charging locations (3 DC fast, 13 Level 2). Free 0–100 profitability score on any Barrington address from EV Data Map by Charge Rigs.

Barrington, Illinois is served by 16 public electric vehicle charging locations operating 30 individual chargers — an average of 1.9 chargers per site. Of those locations, 3 (19%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 13 (81%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Barrington is ChargePoint Network with 12 locations, followed by Blink Network with 2. Average DC fast power across the city is approximately 56 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Barrington and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Barrington

In Barrington, Illinois, the public charging landscape is predominantly shaped by ChargePoint Network, which operates 75% of the 16 charging locations. This heavy reliance on a single operator highlights the importance of uptime and reliability for site developers considering new installations. The three DC fast charging sites average 56 kW, with the fastest at 120 kW, indicating an older infrastructure that may not meet the demands of evolving EV technologies. Furthermore, with 19% of the charging locations designated as DC fast, opportunities exist for introducing higher-capacity 150-350 kW chargers to attract users seeking quicker charging options. The combination of this current setup and nearby competition creates a strategic environment for establishing new charging solutions.

Barrington charging by the numbers

Locations
16
Chargers
30
DC Fast locations
3
Level 2 locations
13

DC fast share: 19% of locations. Level 2 share: 81%. Average chargers per site: 1.9. Average DC fast power: 56 kW.

Barrington charging — local snapshot

Top operator share
ChargePoint Network runs 75% of public locations across 4 networks.
Average DC fast power
56 kW (fastest stall: 120 kW)
High-power share
0% of DC fast sites are 150 kW-class or higher
Mix
19% DC fast / 81% Level 2 across 16 locations
Estimated DC ports
6 fast-charging ports city-wide

Charging networks in Barrington

The following operators run public charging in Barrington, ranked by number of locations.

Featured charging locations in Barrington

A selection of higher-power public charging locations across Barrington, sorted by power level.

  1. Wickstrom Auto Group - DCFC — Barrington, IL, 60010 (Blink Network · DC Fast · 120 kW)
  2. MOTORWERKS1475 DC FAST 04 — Barrington, IL, 60010 (ChargePoint Network · DC Fast · 24 kW)
  3. MOTORWERKS1475 DC FAST 02 — Barrington, IL, 60010 (ChargePoint Network · DC Fast · 24 kW)
  4. 101 W Liberty — Barrington, IL, 60010 (ZEFNET · Level 2 · 10.4 kW)
  5. LED-LLC - BreezEV — Barrington, IL, 60010 (AMPUP · Level 2 · 7.2 kW)
  6. MOTORWERKS1475 STATION 9 — Barrington, IL, 60010 (ChargePoint Network · Level 2 · 6.5 kW)
  7. MOTORWERKS1475 STATION 8 — Barrington, IL, 60010 (ChargePoint Network · Level 2 · 6.5 kW)
  8. MOTORWERKS1475 STATION 3 — Barrington, IL, 60010 (ChargePoint Network · Level 2 · 6.5 kW)
  9. BMW MOTOR WERKS WASHWERKS1 — Barrington, IL, 60010 (ChargePoint Network · Level 2 · 6.5 kW)
  10. MOTORWERKS1475 EV1 MERCEDES — Barrington, IL, 60010 (ChargePoint Network · Level 2 · 6.5 kW)
  11. ADVOCATE SHEP FITNESS — Barrington, IL, 60010 (ChargePoint Network · Level 2 · 6.5 kW)
  12. MOTORWERKS1475 STATION 11 — Barrington, IL, 60010 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Illinois we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Barrington specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 3 DC fast and 13 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Barrington, Illinois?
There are 16 public electric vehicle charging locations in Barrington, Illinois, with a combined 30 individual chargers. 3 locations offer DC fast charging and 13 provide Level 2 charging.
What is the largest EV charging network in Barrington?
ChargePoint Network operates the most public charging locations in Barrington with 12 sites, followed by Blink Network with 2 sites.
How much does it cost to install an EV charger in Barrington?
Level 2 EV chargers in Barrington typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Barrington?
Most Barrington projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Illinois state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Barrington?
A typical commercial Level 2 installation in Barrington energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Barrington take to become profitable?
Payback in Barrington depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage