Install EV Chargers in Milton, Massachusetts

Install EV chargers or analyze a site in Milton, Massachusetts. 13 existing public charging locations (0 DC fast, 13 Level 2). Free 0–100 profitability score on any Milton address from EV Data Map by Charge Rigs.

Milton, Massachusetts is served by 13 public electric vehicle charging locations operating 22 individual chargers — an average of 1.7 chargers per site. Of those locations, 0 (0%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 13 (100%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Milton is ChargePoint Network with 13 locations. Average DC fast power across the city is approximately 0 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Milton and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Milton

Milton, Massachusetts offers a unique landscape for EV charging infrastructure, with all 13 public charging locations operated exclusively by ChargePoint Network, ensuring a uniform experience in terms of pricing and reliability. However, the absence of DC fast charging stations means that local EV drivers seeking rapid top-ups are currently leaving the city, highlighting a significant opportunity for new operators. With no DC fast chargers in sight and the entire network comprised solely of Level 2 options, developers should consider bridging this gap to capitalize on the evident demand for faster charging solutions in the area. The existing infrastructure creates a compelling case for expansion as Milton’s EV adoption grows.

Milton charging by the numbers

Locations
13
Chargers
22
DC Fast locations
0
Level 2 locations
13

DC fast share: 0% of locations. Level 2 share: 100%. Average chargers per site: 1.7. Average DC fast power: 0 kW.

Milton charging — local snapshot

Top operator share
ChargePoint Network runs 100% of public locations.
Mix
0% DC fast / 100% Level 2 across 13 locations

Charging networks in Milton

The following operators run public charging in Milton, ranked by number of locations.

Featured charging locations in Milton

A selection of higher-power public charging locations across Milton, sorted by power level.

  1. MILTON ACADEMY PRITZKER LOT2 — Milton, MA, 02186 (ChargePoint Network · Level 2 · 6.5 kW)
  2. MILTON ACADEMY VAN LOT 2 — Milton, MA, 02186 (ChargePoint Network · Level 2 · 6.5 kW)
  3. MILTON ACADEMY PRITZKER LOT1 — Milton, MA, 02186 (ChargePoint Network · Level 2 · 6.5 kW)
  4. TOWN OF MILTON STATION 2 — Milton, MA, 02186 (ChargePoint Network · Level 2 · 6.5 kW)
  5. TOWN OF MILTON STATION 1 — Milton, MA, 02186 (ChargePoint Network · Level 2 · 6.5 kW)
  6. MILTON ACADEMY POOL LOT 2 — Milton, MA, 02186 (ChargePoint Network · Level 2 · 6.5 kW)
  7. MILTON ACADEMY VAN LOT — Milton, MA, 02186 (ChargePoint Network · Level 2 · 6.5 kW)
  8. MILTON ACADEMY RANDOLPH AVE — Milton, MA, 02186 (ChargePoint Network · Level 2 · 6.5 kW)
  9. MILTON ACADEMY POOL LOT 1 — Milton, MA, 02186 (ChargePoint Network · Level 2 · 6.5 kW)
  10. ICEHOUSE1 STATION 4 — Milton, MA, 02186 (ChargePoint Network · Level 2 · 3.8 kW)
  11. ICEHOUSE1 STATION 3 — Milton, MA, 02186 (ChargePoint Network · Level 2 · 3.8 kW)
  12. ICEHOUSE1 STATION 2 — Milton, MA, 02186 (ChargePoint Network · Level 2 · 3.8 kW)

Nearby cities with EV charging coverage

Other cities in Massachusetts we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Milton specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 0 DC fast and 13 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Milton, Massachusetts?
There are 13 public electric vehicle charging locations in Milton, Massachusetts, with a combined 22 individual chargers. 0 locations offer DC fast charging and 13 provide Level 2 charging.
What is the largest EV charging network in Milton?
ChargePoint Network operates the most public charging locations in Milton with 13 sites.
How much does it cost to install an EV charger in Milton?
Level 2 EV chargers in Milton typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Milton?
Most Milton projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Massachusetts state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Milton?
A typical commercial Level 2 installation in Milton energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Milton take to become profitable?
Payback in Milton depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.