Install EV Chargers in Shrewsbury, Massachusetts

Install EV chargers or analyze a site in Shrewsbury, Massachusetts. 18 existing public charging locations (2 DC fast, 16 Level 2). Free 0–100 profitability score on any Shrewsbury address from EV Data Map by Charge Rigs.

Shrewsbury, Massachusetts is served by 18 public electric vehicle charging locations operating 58 individual chargers — an average of 3.2 chargers per site. Of those locations, 2 (11%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 16 (89%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Shrewsbury is ChargePoint Network with 7 locations, followed by CHARGELAB with 4. Average DC fast power across the city is approximately 206 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Shrewsbury and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Shrewsbury

Shrewsbury boasts a robust public EV charging landscape with 18 locations operated by six distinct networks, highlighting a competitive market rather than brand loyalty. ChargePoint Network leads with 39% of the sites, ensuring a reliable option for users. The city’s 11% DC fast charging share consists of two locations averaging 206 kW, one reaching an impressive 350 kW. With 50% of fast chargers rated at 150 kW-class or higher, drivers benefit from ultra-fast charging capabilities, making it a desirable choice for those seeking efficient charging experiences. This variety not only fosters competitive pricing and uptime but also demands nuanced selection based on power and amenities, appealing to a diverse EV-driving audience.

Shrewsbury charging by the numbers

Locations
18
Chargers
58
DC Fast locations
2
Level 2 locations
16

DC fast share: 11% of locations. Level 2 share: 89%. Average chargers per site: 3.2. Average DC fast power: 206 kW.

Shrewsbury charging — local snapshot

Top operator share
ChargePoint Network runs 39% of public locations across 6 networks.
Average DC fast power
206 kW (fastest stall: 350 kW)
High-power share
50% of DC fast sites are 150 kW-class or higher
Mix
11% DC fast / 89% Level 2 across 18 locations
Estimated DC ports
7 fast-charging ports city-wide

Charging networks in Shrewsbury

The following operators run public charging in Shrewsbury, ranked by number of locations.

Featured charging locations in Shrewsbury

A selection of higher-power public charging locations across Shrewsbury, sorted by power level.

  1. Market Basket Shrewsbury #93 — Shrewsbury, MA, 01545 (eVgo Network · DC Fast · 350 kW)
  2. MB EXPRESS 250 — Shrewsbury, MA, 01545 (ChargePoint Network · DC Fast · 62.5 kW)
  3. 62 Grafton Street — Shrewsbury, MA, 01545 (CHARGELAB · Level 2 · 9.6 kW)
  4. Shrewsbury High School — Shrewsbury, MA, 01545 (Non-Networked · Level 2 · 9.6 kW)
  5. Oak Middle School — Shrewsbury, MA, 01545 (Non-Networked · Level 2 · 9.6 kW)
  6. 15 Parker Road — Shrewsbury, MA, 01545 (CHARGELAB · Level 2 · 9.6 kW)
  7. Dean Park — Shrewsbury, MA, 01545 (Non-Networked · Level 2 · 9.6 kW)
  8. 45 Oak Street — Shrewsbury, MA, 01545 (CHARGELAB · Level 2 · 9.6 kW)
  9. 75 Cypress Avenue — Shrewsbury, MA, 01545 (CHARGELAB · Level 2 · 9.6 kW)
  10. 100 Maple Ave — Shrewsbury, MA, 01545 (EV Connect · Level 2 · 7.2 kW)
  11. Building 5000 — Shrewsbury, MA, 1545 (Blink Network · Level 2 · 7.2 kW)
  12. BEAL SCHOOL STATION1 — Shrewsbury, MA, 01545 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Massachusetts we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Shrewsbury specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 2 DC fast and 16 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Shrewsbury, Massachusetts?
There are 18 public electric vehicle charging locations in Shrewsbury, Massachusetts, with a combined 58 individual chargers. 2 locations offer DC fast charging and 16 provide Level 2 charging.
What is the largest EV charging network in Shrewsbury?
ChargePoint Network operates the most public charging locations in Shrewsbury with 7 sites, followed by CHARGELAB with 4 sites.
How much does it cost to install an EV charger in Shrewsbury?
Level 2 EV chargers in Shrewsbury typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Shrewsbury?
Most Shrewsbury projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Massachusetts state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Shrewsbury?
A typical commercial Level 2 installation in Shrewsbury energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Shrewsbury take to become profitable?
Payback in Shrewsbury depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage