Install EV Chargers in Millbury, Massachusetts

Install EV chargers or analyze a site in Millbury, Massachusetts. 10 existing public charging locations (3 DC fast, 7 Level 2). Free 0–100 profitability score on any Millbury address from EV Data Map by Charge Rigs.

Millbury, Massachusetts is served by 10 public electric vehicle charging locations operating 32 individual chargers — an average of 3.2 chargers per site. Of those locations, 3 (30%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 7 (70%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Millbury is ChargePoint Network with 7 locations, followed by RED_E with 2. Average DC fast power across the city is approximately 197 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Millbury and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Millbury

In Millbury, Massachusetts, the charging landscape is notably shaped by ChargePoint Network, which operates 70% of the city’s 10 public charging locations. This concentration of sites drives significant reliability and consistency in service, essential factors for potential developers. With 30% of these locations featuring DC fast chargers that average 197 kW—alongside one rapid 350 kW stall—there's a competitive advantage in providing high-powered options for EV drivers. Remarkably, 33% of the DC fast chargers meet the 150 kW-class standard or higher, appealing especially to those using navigation apps. The balanced mix of DC fast and Level 2 chargers caters to both quick and longer-duration charging needs, making Millbury a strategic point for site development within the region.

Millbury charging by the numbers

Locations
10
Chargers
32
DC Fast locations
3
Level 2 locations
7

DC fast share: 30% of locations. Level 2 share: 70%. Average chargers per site: 3.2. Average DC fast power: 197 kW.

Millbury charging — local snapshot

Top operator share
ChargePoint Network runs 70% of public locations across 3 networks.
Average DC fast power
197 kW (fastest stall: 350 kW)
High-power share
33% of DC fast sites are 150 kW-class or higher
Mix
30% DC fast / 70% Level 2 across 10 locations
Estimated DC ports
18 fast-charging ports city-wide

Charging networks in Millbury

The following operators run public charging in Millbury, ranked by number of locations.

Featured charging locations in Millbury

A selection of higher-power public charging locations across Millbury, sorted by power level.

  1. The Shops at Blackstone Valley (Millbury,MA) — Millbury, MA, 01527 (Electrify America · DC Fast · 350 kW)
  2. Discover Marble — Millbury, MA, 01527 (RED_E · DC Fast · 120 kW)
  3. Gorettis Supermarket — Millbury, MA, 01527 (RED_E · DC Fast · 120 kW)
  4. TOWN HALL R.E. SHAW 2 — Millbury, MA, 01527 (ChargePoint Network · Level 2 · 6.5 kW)
  5. TOWN HALL TOWN LIBRARY — Millbury, MA, 01527 (ChargePoint Network · Level 2 · 6.5 kW)
  6. TOWN HALL TOWN HALL — Millbury, MA, 01527 (ChargePoint Network · Level 2 · 6.5 kW)
  7. COBBLESTONEVILL STATION1 — Millbury, MA, 01527 (ChargePoint Network · Level 2 · 6.5 kW)
  8. WHEELOCK 69 WHEELOCK 1 — Millbury, MA, 01527 (ChargePoint Network · Level 2 · 6.5 kW)
  9. TOWN HALL R.E. SHAW 1 — Millbury, MA, 01527 (ChargePoint Network · Level 2 · 6.5 kW)
  10. TOWN HALL R.E. SHAW 3 — Millbury, MA, 01527 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Massachusetts we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Millbury specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 3 DC fast and 7 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Millbury, Massachusetts?
There are 10 public electric vehicle charging locations in Millbury, Massachusetts, with a combined 32 individual chargers. 3 locations offer DC fast charging and 7 provide Level 2 charging.
What is the largest EV charging network in Millbury?
ChargePoint Network operates the most public charging locations in Millbury with 7 sites, followed by RED_E with 2 sites.
How much does it cost to install an EV charger in Millbury?
Level 2 EV chargers in Millbury typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Millbury?
Most Millbury projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Massachusetts state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Millbury?
A typical commercial Level 2 installation in Millbury energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Millbury take to become profitable?
Payback in Millbury depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage