Install EV chargers or analyze a site in Marshall, Michigan. 13 existing public charging locations (7 DC fast, 6 Level 2). Free 0–100 profitability score on any Marshall address from EV Data Map by Charge Rigs.
Marshall, Michigan is served by 13 public electric vehicle charging locations operating 35 individual chargers — an average of 2.7 chargers per site. Of those locations, 7 (54%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 6 (46%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Marshall is ChargePoint Network with 10 locations, followed by Tesla with 2. Average DC fast power across the city is approximately 160 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Marshall and receive an instant ROI score, demand projection, and recommended charger configuration.
Marshall, Michigan stands out in the EV charging landscape, with a remarkable 54% of its 13 public charging locations dedicated to DC fast charging, showcasing a notable average power output of 160 kW and a peak capacity of 250 kW. This modern high-power setup, with a significant 57% of DC fast sites classified as 150 kW and above, makes it an attractive hub for EV drivers. ChargePoint Network controls 77% of these locations, ensuring a consolidated network that influences uptime and pricing. For site developers, establishing a presence in Marshall offers the chance to compete strategically, particularly with hardware rated between 150–350 kW that can effectively meet local demand while addressing potential gaps highlighted by surrounding traffic and demographic patterns.
DC fast share: 54% of locations. Level 2 share: 46%. Average chargers per site: 2.7. Average DC fast power: 160 kW.
The following operators run public charging in Marshall, ranked by number of locations.
A selection of higher-power public charging locations across Marshall, sorted by power level.
Other cities in Michigan we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Marshall specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 7 DC fast and 6 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.