Install EV Chargers in Marshall, Michigan

Install EV chargers or analyze a site in Marshall, Michigan. 13 existing public charging locations (7 DC fast, 6 Level 2). Free 0–100 profitability score on any Marshall address from EV Data Map by Charge Rigs.

Marshall, Michigan is served by 13 public electric vehicle charging locations operating 35 individual chargers — an average of 2.7 chargers per site. Of those locations, 7 (54%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 6 (46%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Marshall is ChargePoint Network with 10 locations, followed by Tesla with 2. Average DC fast power across the city is approximately 160 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Marshall and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Marshall

Marshall, Michigan stands out in the EV charging landscape, with a remarkable 54% of its 13 public charging locations dedicated to DC fast charging, showcasing a notable average power output of 160 kW and a peak capacity of 250 kW. This modern high-power setup, with a significant 57% of DC fast sites classified as 150 kW and above, makes it an attractive hub for EV drivers. ChargePoint Network controls 77% of these locations, ensuring a consolidated network that influences uptime and pricing. For site developers, establishing a presence in Marshall offers the chance to compete strategically, particularly with hardware rated between 150–350 kW that can effectively meet local demand while addressing potential gaps highlighted by surrounding traffic and demographic patterns.

Marshall charging by the numbers

Locations
13
Chargers
35
DC Fast locations
7
Level 2 locations
6

DC fast share: 54% of locations. Level 2 share: 46%. Average chargers per site: 2.7. Average DC fast power: 160 kW.

Marshall charging — local snapshot

Top operator share
ChargePoint Network runs 77% of public locations across 3 networks.
Average DC fast power
160 kW (fastest stall: 250 kW)
High-power share
57% of DC fast sites are 150 kW-class or higher
Mix
54% DC fast / 46% Level 2 across 13 locations
Estimated DC ports
22 fast-charging ports city-wide

Charging networks in Marshall

The following operators run public charging in Marshall, ranked by number of locations.

Featured charging locations in Marshall

A selection of higher-power public charging locations across Marshall, sorted by power level.

  1. Family Fare Supermarkets - Tesla Supercharger — Marshall, MI, 49068 (Tesla · DC Fast · 250 kW)
  2. JOHNNY'S MARKET JOHNNYS 2 — Marshall, MI, 49068 (ChargePoint Network · DC Fast · 205 kW)
  3. JOHNNY'S MARKET JOHNNYS 1 — Marshall, MI, 49068 (ChargePoint Network · DC Fast · 205 kW)
  4. PS Food Mart #1034 - Tesla Supercharger — Marshall, MI, 49068 (Tesla · DC Fast · 150 kW)
  5. JOHNNY'S MARKET MARSHALL DC1 — Marshall, MI, 49068 (ChargePoint Network · DC Fast · 125 kW)
  6. JOHNNY'S MARKET MARSHALL DC2 — Marshall, MI, 49068 (ChargePoint Network · DC Fast · 125 kW)
  7. DeNooyer Chevrolet Marshall MI — Marshall, MI, 49068 (RED_E · DC Fast · 60 kW)
  8. CITYOFMARSHALL GRAND STREET #3 — Marshall, MI, 49068 (ChargePoint Network · Level 2 · 6.5 kW)
  9. CITYOFMARSHALL FARMER'S MKT #3 — Marshall, MI, 49068 (ChargePoint Network · Level 2 · 6.5 kW)
  10. CITYOFMARSHALL GRAND STREET #1 — Marshall, MI, 49068 (ChargePoint Network · Level 2 · 6.5 kW)
  11. CITYOFMARSHALL FARMER'S MKT #2 — Marshall, MI, 49068 (ChargePoint Network · Level 2 · 6.5 kW)
  12. CITYOFMARSHALL GRAND STREET #2 — Marshall, MI, 49068 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Michigan we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Marshall specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 7 DC fast and 6 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Marshall, Michigan?
There are 13 public electric vehicle charging locations in Marshall, Michigan, with a combined 35 individual chargers. 7 locations offer DC fast charging and 6 provide Level 2 charging.
What is the largest EV charging network in Marshall?
ChargePoint Network operates the most public charging locations in Marshall with 10 sites, followed by Tesla with 2 sites.
How much does it cost to install an EV charger in Marshall?
Level 2 EV chargers in Marshall typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Marshall?
Most Marshall projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Michigan state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Marshall?
A typical commercial Level 2 installation in Marshall energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Marshall take to become profitable?
Payback in Marshall depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage