Install EV Chargers in Lansing, Michigan

Install EV chargers or analyze a site in Lansing, Michigan. 74 existing public charging locations (12 DC fast, 62 Level 2). Free 0–100 profitability score on any Lansing address from EV Data Map by Charge Rigs.

Lansing, Michigan is served by 74 public electric vehicle charging locations operating 191 individual chargers — an average of 2.6 chargers per site. Of those locations, 12 (16%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 62 (84%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Lansing is ChargePoint Network with 41 locations, followed by Blink Network with 15. Average DC fast power across the city is approximately 182 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Lansing and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Lansing

Lansing boasts a dynamic public charging landscape with 74 locations across 14 distinct operators, fostering a competitive environment that keeps pricing and uptime favorable for users. ChargePoint Network dominates with 55% of the installations, yet the presence of multiple brands encourages drivers to choose based on power and amenities rather than defaulting to one provider. The city’s 12 DC fast charging sites average 182 kW, with impressive options peaking at 400 kW, ensuring quick top-ups for those on the go. Notably, 58% of these fast sites exceed 150 kW, appealing to drivers seeking higher charging rates. This diverse infrastructure positions Lansing as a strategic waypoint in Michigan's EV ecosystem, particularly when assessed for emerging installation needs in adjacent communities.

Lansing charging by the numbers

Locations
74
Chargers
191
DC Fast locations
12
Level 2 locations
62

DC fast share: 16% of locations. Level 2 share: 84%. Average chargers per site: 2.6. Average DC fast power: 182 kW.

Lansing charging — local snapshot

Top operator share
ChargePoint Network runs 55% of public locations across 14 networks.
Average DC fast power
182 kW (fastest stall: 400 kW)
High-power share
58% of DC fast sites are 150 kW-class or higher
Mix
16% DC fast / 84% Level 2 across 74 locations
Estimated DC ports
58 fast-charging ports city-wide

Charging networks in Lansing

The following operators run public charging in Lansing, ranked by number of locations.

Featured charging locations in Lansing

A selection of higher-power public charging locations across Lansing, sorted by power level.

  1. Eastwood Towne Center MB.HPC — Lansing, MI, 48912 (MERCEDES_BENZ · DC Fast · 400 kW)
  2. Walmart 2869 (Lansing, MI) — Lansing, MI, 48917 (Electrify America · DC Fast · 350 kW)
  3. Lansing, MI — Lansing, MI, 48911 (RIVIAN_ADVENTURE · DC Fast · 300 kW)
  4. Meijer - Tesla Supercharger — Lansing, MI, 48911 (Tesla · DC Fast · 250 kW)
  5. Lafontaine Ford of Lansing — Lansing, MI, 48911 (FORD_CHARGE · DC Fast · 240 kW)
  6. Evergetic Charging Spa — Lansing, MI, 48915 (Blink Network · DC Fast · 180 kW)
  7. The Heights at Eastwood - Tesla Supercharger — Lansing, MI, 48912 (Tesla · DC Fast · 150 kW)
  8. FRANDOR STATION 1 — Lansing, MI, 48912 (ChargePoint Network · DC Fast · 62.5 kW)
  9. WAW HYUNDAI CUSTOMER LOT#2 — Lansing, MI, 48912 (ChargePoint Network · DC Fast · 62.5 kW)
  10. WAW HYUNDAI CUSTOMER LOT#1 — Lansing, MI, 48912 (ChargePoint Network · DC Fast · 62.5 kW)
  11. FRANDOR STATION 2 — Lansing, MI, 48912 (ChargePoint Network · DC Fast · 62.5 kW)
  12. Feldman Chevrolet of Lansing — Lansing, MI, 48912 (RED_E · DC Fast · 60 kW)

Nearby cities with EV charging coverage

Other cities in Michigan we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Lansing specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 12 DC fast and 62 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Lansing, Michigan?
There are 74 public electric vehicle charging locations in Lansing, Michigan, with a combined 191 individual chargers. 12 locations offer DC fast charging and 62 provide Level 2 charging.
What is the largest EV charging network in Lansing?
ChargePoint Network operates the most public charging locations in Lansing with 41 sites, followed by Blink Network with 15 sites.
How much does it cost to install an EV charger in Lansing?
Level 2 EV chargers in Lansing typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Lansing?
Most Lansing projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Michigan state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Lansing?
A typical commercial Level 2 installation in Lansing energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Lansing take to become profitable?
Payback in Lansing depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage