Install EV Chargers in Muskegon, Michigan

Install EV chargers or analyze a site in Muskegon, Michigan. 23 existing public charging locations (17 DC fast, 6 Level 2). Free 0–100 profitability score on any Muskegon address from EV Data Map by Charge Rigs.

Muskegon, Michigan is served by 23 public electric vehicle charging locations operating 45 individual chargers — an average of 2.0 chargers per site. Of those locations, 17 (74%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 6 (26%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Muskegon is ChargePoint Network with 14 locations, followed by RED_E with 4. Average DC fast power across the city is approximately 83 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Muskegon and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Muskegon

Muskegon, Michigan, presents a strategic advantage for EV charging operators due to its strong reliance on the ChargePoint Network, which oversees 61% of its 23 public charging locations. This concentration eases operational concerns like uptime and pricing, but it also creates an opportunity for new entrants with advanced hardware, given that only 18% of the city's 17 DC fast stations exceed 150 kW. With an average DC fast power output of 83 kW and a high-capacity stall at 250 kW, operators can differentiate themselves by offering more robust charging solutions. The predominance of DC fast charging—making up 74% of total locations—highlights a clear market preference, indicating potential gaps that innovative players can capitalize on to attract EV drivers navigating the local landscape.

Muskegon charging by the numbers

Locations
23
Chargers
45
DC Fast locations
17
Level 2 locations
6

DC fast share: 74% of locations. Level 2 share: 26%. Average chargers per site: 2.0. Average DC fast power: 83 kW.

Muskegon charging — local snapshot

Top operator share
ChargePoint Network runs 61% of public locations across 6 networks.
Average DC fast power
83 kW (fastest stall: 250 kW)
High-power share
18% of DC fast sites are 150 kW-class or higher
Mix
74% DC fast / 26% Level 2 across 23 locations
Estimated DC ports
29 fast-charging ports city-wide

Charging networks in Muskegon

The following operators run public charging in Muskegon, ranked by number of locations.

Featured charging locations in Muskegon

A selection of higher-power public charging locations across Muskegon, sorted by power level.

  1. MEIJER STORES 232 FRUITPORT 2 — Muskegon, MI, 49444 (ChargePoint Network · DC Fast · 250 kW)
  2. MEIJER STORES 232 FRUITPORT 1 — Muskegon, MI, 49444 (ChargePoint Network · DC Fast · 250 kW)
  3. Meijer - Tesla Supercharger — Muskegon, MI, 49444 (Tesla · DC Fast · 150 kW)
  4. Betten Hyundai, Inc — Muskegon, MI, 49441 (Blink Network · DC Fast · 120 kW)
  5. AMITY COMMONS 4 — Muskegon, MI, 49442 (ChargePoint Network · DC Fast · 62.5 kW)
  6. ALLEN CROSSING 3 — Muskegon, MI, 49442 (ChargePoint Network · DC Fast · 62.5 kW)
  7. AMITY COMMONS 6 — Muskegon, MI, 49442 (ChargePoint Network · DC Fast · 62.5 kW)
  8. ALLEN CROSSING 1 — Muskegon, MI, 49442 (ChargePoint Network · DC Fast · 62.5 kW)
  9. ALLEN CROSSING 2 — Muskegon, MI, 49442 (ChargePoint Network · DC Fast · 62.5 kW)
  10. AMITY COMMONS 5 — Muskegon, MI, 49442 (ChargePoint Network · DC Fast · 62.5 kW)
  11. ALLEN CROSSING 4 — Muskegon, MI, 49442 (ChargePoint Network · DC Fast · 62.5 kW)
  12. ALLEN CROSSING 5 — Muskegon, MI, 49442 (ChargePoint Network · DC Fast · 62.5 kW)

Nearby cities with EV charging coverage

Other cities in Michigan we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Muskegon specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 17 DC fast and 6 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Muskegon, Michigan?
There are 23 public electric vehicle charging locations in Muskegon, Michigan, with a combined 45 individual chargers. 17 locations offer DC fast charging and 6 provide Level 2 charging.
What is the largest EV charging network in Muskegon?
ChargePoint Network operates the most public charging locations in Muskegon with 14 sites, followed by RED_E with 4 sites.
How much does it cost to install an EV charger in Muskegon?
Level 2 EV chargers in Muskegon typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Muskegon?
Most Muskegon projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Michigan state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Muskegon?
A typical commercial Level 2 installation in Muskegon energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Muskegon take to become profitable?
Payback in Muskegon depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage