Install EV Chargers in Lee's Summit, Missouri

Install EV chargers or analyze a site in Lee's Summit, Missouri. 33 existing public charging locations (1 DC fast, 32 Level 2). Free 0–100 profitability score on any Lee's Summit address from EV Data Map by Charge Rigs.

Lee's Summit, Missouri is served by 33 public electric vehicle charging locations operating 69 individual chargers — an average of 2.1 chargers per site. Of those locations, 1 (3%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 32 (97%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Lee's Summit is ChargePoint Network with 30 locations, followed by Blink Network with 1. Average DC fast power across the city is approximately 240 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Lee's Summit and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Lee's Summit

In Lee's Summit, Missouri, the public charging landscape is primarily shaped by ChargePoint Network, comprising 91% of the city’s 33 charging locations. This presents a unique opportunity for developers, as the market relies heavily on this single operator for uptime and reliability. The city's solitary DC fast charging station boasts an impressive average power of 240 kW, ensuring that it meets the current high-performance standards, while all fast charging options exceed 150 kW. With only 3% of the total charging locations offering DC fast service, there is a notable gap to address both fast and Level 2 charging demands. This disparity, along with the city’s specific traffic and demographic context, presents an attractive opportunity for new entrants focused on enhancing the charging infrastructure.

Lee's Summit charging by the numbers

Locations
33
Chargers
69
DC Fast locations
1
Level 2 locations
32

DC fast share: 3% of locations. Level 2 share: 97%. Average chargers per site: 2.1. Average DC fast power: 240 kW.

Lee's Summit charging — local snapshot

Top operator share
ChargePoint Network runs 91% of public locations across 4 networks.
Average DC fast power
240 kW (fastest stall: 240 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
3% DC fast / 97% Level 2 across 33 locations
Estimated DC ports
2 fast-charging ports city-wide

Charging networks in Lee's Summit

The following operators run public charging in Lee's Summit, ranked by number of locations.

Featured charging locations in Lee's Summit

A selection of higher-power public charging locations across Lee's Summit, sorted by power level.

  1. Bob Sight Ford — Lee's Summit, MO, 64063 (FORD_CHARGE · DC Fast · 240 kW)
  2. Summit at West Pryor — Lees Summit, MO, 64081 (Blink Network · Level 2 · 21.6 kW)
  3. Signature at West Pryor — Lee's Summit, MO, 64081 (Non-Networked · Level 2 · 9.6 kW)
  4. ADAMSTOYOTALS ADAMS PUBLIC — Lee's Summit, MO, 64086 (ChargePoint Network · Level 2 · 6.5 kW)
  5. EVERGY @ST LUKES -200C — Lees Summit, MO, 64086 (ChargePoint Network · Level 2 · 6.5 kW)
  6. EVERGY @JOHNKNOX -297A — Lees Summit, MO, 64081 (ChargePoint Network · Level 2 · 6.5 kW)
  7. EVERGY @KOHLS -144A — Lees Summit, MO, 64081 (ChargePoint Network · Level 2 · 6.5 kW)
  8. EVERGY @KOHLS -144B — Lee's Summit, MO, 64081 (ChargePoint Network · Level 2 · 6.5 kW)
  9. EVERGY @JOHNKNOX -296B — Lees Summit, MO, 64081 (ChargePoint Network · Level 2 · 6.5 kW)
  10. EVERGY @WALMART -061C — Lees Summit, MO, 64086 (ChargePoint Network · Level 2 · 6.5 kW)
  11. EVERGY @WALMART -061A — Lees Summit, MO, 64086 (ChargePoint Network · Level 2 · 6.5 kW)
  12. EVERGY @ST LUKES -200A — Lees Summit, MO, 64086 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Missouri we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Lee's Summit specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 1 DC fast and 32 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Lee's Summit, Missouri?
There are 33 public electric vehicle charging locations in Lee's Summit, Missouri, with a combined 69 individual chargers. 1 locations offer DC fast charging and 32 provide Level 2 charging.
What is the largest EV charging network in Lee's Summit?
ChargePoint Network operates the most public charging locations in Lee's Summit with 30 sites, followed by Blink Network with 1 sites.
How much does it cost to install an EV charger in Lee's Summit?
Level 2 EV chargers in Lee's Summit typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Lee's Summit?
Most Lee's Summit projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Missouri state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Lee's Summit?
A typical commercial Level 2 installation in Lee's Summit energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Lee's Summit take to become profitable?
Payback in Lee's Summit depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage